CURRICULAM VITAE
R.Sakthi manikandan
Blk *** 07#1081
Ubi Ave 1,
Singapore 400346.
Mobile: +65-84025586, +65-84994441.
E-Mail: acxlix@r.postjobfree.com
EDUCATION:
Diploma in Mechanical Engineering, Graduated April 2007 with First Class.
Sri Adhisankarar Polytechnic College, Tamilnadu, India.
JOB DESCRIPTION:
Company : REXMARINE & ENGINEERING PTE LTD - Singapore
Designation : HVAC ASSISTANT PROJECT ENGINEER & DRAFTSMAN
Duration : SEP 2015 to Till Date
Responsibilities :
Provide drawing submission schedule.
Prepare Heat Load Calculation & Air Flow Balancing for Air Conditioning System.
Prepare Heat Load Calculation for Refrigeration System.
Prepare Ventilation Calculation for the Mechanical Ventilation System.
Prepare ducting arrangement drawing for Living Quarters & Mechanical Ventilation System.
Prepare datasheet for Chiller, Air Handling Unit, Chilled Water System Accessories, Stand Alone Sea Water Cooled Package Unit and Ventilation fan
Prepare submission drawing as per contract specification.
Prepare Inspection Test Plan & Test Protocol for commissioning.
Liaise with customer & site supervisor on the site issue and provide assistance accordingly.
Coordinate with project management activities.
Providing technical advice for site installation.
Liaising with supplier for further technical discussion & make technical decision on the equipment selection.
Document Controller.
Project In charge:
85T BP ESCORT VESSEL (H1104 – 1109) at ASL Shipyard Pte Ltd.
Classification: LR A1,UMS.
ACCOMODATION SEVICE PLSTFORM PESTO (P4502) at NAVTECH MARINE SERVICE, ABU DHABI.
Classification: American Bureau of Shipping (ABS)
Company : VIKING AIRTECH PTE LTD - Singapore
Designation : HVAC ASSISTANT ENGINEER, DRAFTSMAN & DOCUMENT CONTROLLER
Duration : Dec 2012 to Aug 2015 & June 2009 to July 2010
Responsibilities :
Provide drawing submission schedule.
Prepare Heat Load Calculation & Air Flow Balancing for Air Conditioning System.
Prepare Heat Load Calculation for Refrigeration System.
Prepare Ventilation Calculation for the Mechanical Ventilation System.
Prepare ducting arrangement drawing for Living Quarters & Mechanical Ventilation System.
Prepare datasheet for Chiller, Air Handling Unit, Chilled Water System Accessories, Stand Alone Sea Water Cooled Package Unit and Ventilation fan
Prepare submission drawing as per contract specification.
Prepare Inspection Test Plan & Test Protocol for commissioning.
Liaise with customer & site supervisor on the site issue and provide assistance accordingly.
Providing technical advice for site installation.
Liaising with supplier for further technical discussion & make technical decision on the equipment selection.
Document Controller.
Project In charge:
Jack Up Drilling Unit (P2026-Pacific Class 375) at PPL Shipyard Pte Ltd.
Classification: American Bureau of Shipping (ABS)
Bollard Pull (92x22m) AHTS Vessel at Drydocks World Singapore.
Classification: American Bureau of Shipping (ABS)
Bollard Pull (92x22m) AHTS Vessel (Hull No: B0633 & 34) at ST Marine Singapore. Classification: American Bureau of Shipping (ABS)
180m Pipe Laying Vessel (H381) at Keppel Singmarine Shipyard Ltd.
Classification: American Bureau of Shipping (ABS).
70m AHTS (H004) at PT. Labroy Shipbuilding Engineering Batam.
Classification: Bureau Veritas (BV).
17,500 DWT Oil Tanker (AH037&038) at PT.Anggrek Hitam Batam.
Classification: Nippon Kaiji Kyokai (NK).
Helix Project 11572 Well Intervention Semi-submersibles Unit. Jurong Shipyard Pte Ltd.
QP2-YADANA SUBSIDENCE PROJECT-EPSC1 (Platform). Total E&P Myanmar.
TMP-YADANA SUBSIDENCE PROJECT-EPSC1 (Platform). Total E&P Myanmar.
LER HVAC System (Platform). Shell Phillippines Exploration B.V.
Company : LINK MIDDLE EAST, Dubai
Designation : DRAFTSMAN & ESTIMATION
Duration : Oct. 2011 to Dec 2012
Responsibilities:
Prepare Fabrication Drawing for Canopy Structural.
Prepare Fabrication Drawing for Ladders, Platforms.
Prepare Estimation with Steel Structural.
Prepare Bill of Material
Company : UNI PRODUIRE ENGG. (Pvt) Ltd., India
Designation : DRAFTSMAN
Duration : November 2007 to May2009 & July 2010 to Oct 2011
Responsibilities:
Preparation of Detailed Drawings for Water and Steam Circulation system. (Drums, Water Walls, Headers, Riser Pipes, Down Comer Pipes, Super Heaters, Radiant Roof Tubes, CBD & IBD Tanks, Sealing).
Prepare AIR & FULE GAS Ducting Detail.
Prepare Pipe Routing For Steam Line, Water Line.
Prepare Isometric Drawings.
Prepare General Arrangement & Pressure Parts Arrangement.
Prepare Structural Detailing for GALLERY & TOWERS
Preparation Bill of Material
COMPUTER SKILLS:
Design Software : 1. CATIA V5 R17, R18, R19, (Expert)
2. AUTOCAD 2004 -2008, 2011. (Expert)
Microsoft : MS-Word, Ms-Excel, MS-PowerPoint (Expert)
PERSONAL DETAILS:
Date of Birth : 30-4-1987
Father Name : Mr.S.Rajamanickam
Nationality : Indian,
Languages (Known) : English, Tamil
Marital Status : Married,
Residential status : SPASS
Work permit No : 0 34826684
Current salary : $2800
Expected salary : $ 3000
Notice Period : 1 Month notice