Summary
Highly trained and energetic production, completions and intervention engineer with over 6 years operational and engineering experience in oil and gas industries. Known as an innovative, analytical, detail-oriented and problem-solver with a focus on goals and deliverables. Proven strengths in safety, professionalism, integrity, technical acumen and a team player work approach. Fluent in speaking and writing French. Exceptional hands on expertise with:
Well surveillance & optimization
Artificial lift
Fracture stimulation design & execution
Production forecasting
Rate transient analysis
Microseismic evaluation
Nodal analysis & well deliverability
Well completion design
Workover & coiled tubing operation
Well performance diagnostics
Well integrity & intervention
Design & optimization of horizontal well
Professional Experience
BHP Billiton, Houston, TX, 2013-2016
Production Engineer, 2015-2016
Focused on daily well surveillance, production optimization, completion evaluation and production forecasting of 35 wells in the Permian Shale Play.
Developed well surveillance dashboard for Permian asset using PI element relative to improve efficiency by 40%
Modeled well performance & nodal analysis to prevent load up and increase well deliverability by 15%
Coordinated daily production review and prioritized field intervention to decrease daily NPT from 25% to 10 %
Saved $1.5 million with a potential saving of $39 million after full field development by automating flowback
Improved daily production of assigned 35 wells by 200 BOE to save $10,000 daily on operating cost
Conceptualized the basic of well and completion designs document for 800 wells full field development
Generated a VBA code for gas back pressure test calculation with a potential cost saving of $300,000
Implemented well integrity management program and safely operated 100% of assigned wells
Wrote well intervention procedures (for coiled tubing, workover rig, tube up, and Soap works)
Completions and Intervention Engineer, 2013 – 2015
Designed, planned and safely executed well completion, Integrity and intervention operations both rigless and rig based of over 250 wells.
Led a completion crew of 75 people in dynamics complex operation that resulted in our newly hired team being the fastest producer with zero safety incident
Established and maintained well integrity and well interventions standards, procedures and processes
Provided technical guidance and solutions to well completion, integrity and intervention field operations after discussing remedial solution with appropriate field operation leader
Successfully delivered 150+ wells within target budget of $3 - 5MM with the highest safety performance
Introduced and implemented the pinpoint frac technique to improve completion phase efficiency by 20%
Initiated the no gel drillout to cut CT operational cost by $150,000 and increase efficiency by 15% per well
Managed overall operational cost of $25-35MM per site for 50 sites while consistently identifying inefficiencies that decreased completion cost by 15% annually
Marathon Oil Corporation, Houston, TX, 2012 - 2013
Completions Engineer contractor
Compiled post drilling and completions data in Spotfire and conducted post completion cost and performance analysis to ensure optimized completion design and cost efficiency.
•Conducted end of well reviews and completion well performance evaluation of about 300 wells in the Eagle Ford and Bakken shale plays using Spotfire
•Monitored completion activities through daily report to ensure 100% quality control and quality assurance of stimulation, completion and production data
•Evaluated cost drivers and risks associated with 4 completions
•Managed and reported well drilling, production and completion data through WellView for Eagle Ford shale plays
Halliburton Energy Services, Inc., Houston, TX, 2011 - 2012
Associate Project Manager
Successfully managed over 80 microseismic monitoing projects with a combined revenue of $20 million while providing client with accurate far-field evaluation of hydraulic fracture geometry, fracture models calibration and revised stimulation and wellbore completion strategies for optimized production.
Utilized microseismic technology to map out downhole fracture geometric in Eagle Ford, Bakken shale plays
Managed microseismic monitoring project of $2 million from conception to final report
Provided on-site project management and coordination of project personnel to safely execute the project within budget while decreasing process time by 20%, resulting in the fastest execution time.
Assessed in real-time any possible relationship between pump rate and fracture height and local fault
Sanjel USA, Cibolo, TX, 2010 - 2011
Fracturing Field Engineer
Designed, planned and executed over 1,500 fracture stimulation treatment in the U.S unconventional plays. Supervised 20 people frac crew on location and met client expectation.
•Performed hydraulic fracturing treatments in Williston Basin and Eagle Ford Shale, efficiently designing and preparing job changes in alignment with specific customer requirements
•Supervised 15+ professionals in completing over 1, 000 fracturing stimulation treatments in Bakken and Eagle Ford shale formations while constantly enforcing safety and quality compliance
•Initiated $1.5 million annual savings through chemical and sand waste control and reduction
Education
Bachelor of Science in Petroleum Engineering, Texas A&M University, College Station, TX
Training & Certification
Workover/Coiled Tubing/Snubbing/Wireline Well Control - WildWell (expiration : August 2016)
Advanced Casing Design - Northstar Training
Completion Tools - Halliburton; Advanced Gas Lift Training - Priority llc.
Coiled Tubing School & Advanced Cement Trainings for Engineer by Schlumberger
Unconventional Production Data Analysis and RT Data Analysis using IHS
Petroleum Experts Package, Petroleum Production System, Fracpro, SMART, Openwell, Wellview, VBA, Word