Dedicated Fabrication Fitter with extensive hands on experience in piping and equipment fabrication, seeking to take next career step with a respected manufacturer focused on the development of innovative products. Highly skilled in operating wide array of shop and tools, schematic interpretation, and material properties of sheet metals. History of success in guiding teams towards the achievement of fabrication project deadlines while improving and sustaining high quality standards. Excellent Domestic and International experience.
ACHIEVEMENTS
Multiple best Fabricator/fitter Awards in M/s. Air Liquide Engineering (India) Pvt. ltd.,
SPECIALIZED SKILLS
Piping Fabrication (C.S. & S.S.Piping works)
Equipment Fabrication (Cryogenic Vessels, Pressure vessels, Exchangers )
Awareness on Erection (Erection of equipment etc.)
Well aware of the technical knowledge and Reading of Drawings.
Team work, getting more output from short periods.
EXPERIENCE
International/Middle East:
Organization : Air Liquide Engineering (India) Pvt. Ltd.,
Position : Fabricator/Sr. Lead Fitter
Period : 07/2013 to till date
Location : Qurayyah, AL Khobar, Saudi Arabia
Type of work : Erection of piping related to Cold box (Nitrogen Plant)
Responsibilities:
Interpreted blueprints and schematics, defined in specification sheets.
Positioned, aligned, and secured parts and assemblies prior to assembly using straightedges, combination squares, calipers, and rulers.
Examined completed work for defects, and measured pieces with straightedges and templates to ensure conformance with specifications; reported nonconforming material to team leader for quality assurance.
Upheld and reinforced standards and procedures outlined in safety manuals and occupational health and safety regulations.
Responsible for 4 Roller plate bending and Materials planning.
Responsible CNC plasma operation, Pressure testing. Hydro & pneumatic.
As a lead Fitter, examine team's work, trouble shoot while making & fit up.
Responsible for drawing study explain to team.
Piping work, EOT Crane operating, Shearing machine operating, Tools and tackle planning
Responsible for validating Proper work permits& lifting plans.
Arrange suitable personal protection equipment for suitable work.
India/Domestic Experience: 20 Years
Organization : Air Liquide Engineering (India) Pvt. Ltd., Hyderabad
Position : Fitter
Period : 08/2006 to 07/2013
Responsibilities:
C.S & S.S piping fabrication and erection works related to Cold box as per Isometric drawings.
Cryogenic Distillation Columns fabrication, alignment, Nozzles fit-up, Distributors manufacturing and fit-up, dished ends fit-up as per detailed and G.A.Drawings.
Fabrication of equipments like Distillation column, Separators, Vent stack, Absorbers, Cold boxes, APU Skid etc.
Erection of equipments like distillation columns, Aluminum Heat exchangers which includes packaged cold boxes and site erected cold boxes.
Cryogenic aluminum heat exchangers inspection, pipe lines fit-ups, alignment, inter connection piping erection, fit-up, supports etc.
Inter connection ducts, railing works, platform works other miscellaneous works.
Erection of equipments like Aluminum exchangers, Cold boxes.
Distributor Manufacturing.
Pipe Lines inspection for routing as per ISO, P&ID drawings
C.S. & S.S pipe bending and rolling, marking in any degree
Handling of fabrication team consisting of fitters, welders, grinders etc., and completing the works within the scheduled time.
Getting the material from stores as required by the drawing like pipes, fittings, flanges valves, gaskets, and nuts and bolts.
Preparation of deficit list.
Preparation of packages (test loops) for Pneumatic test, Hydrostatic test and arranging required Pressure gauges, as per the requirement of codes.
Verification of calibration of gauges, measuring instruments etc.
Always alert in safety related matters and making the people alert in safety related activities.
Taking over all responsibility for the completion of project & achieving the targets.
Organization : Thyssen Krupp Industries India (Pvt) Ltd.,
Position : Fitter
Period : 11/1995 to 02/2006
Responsibilities:
Worked on Equipments like Falling Film Evaporators, Pressure Pan, and Pressure Vessels Boilers for Power Plants.
Done Structural Works for the sugar industries & cement industries
Open Cast Mining & Bulk Material Handling Equipment/Complete Plants
Inspected all work for defects, dimensions, alignment and end preparations
Organization : GEI Godavari Engineers (P) Ltd.,
Position : Fabricator (Contract Basis)
Period : November 1993 to November 1995
Responsibilities:
Marking Tube Plates for Heat Exchangers.
Fabrication of Pressure Vessels, Storage Tanks.
Worked on BHEL Projects
Health Safety Environment
Always use personnel protective Equipment.
Following the Rules & Regulations while handling the Jobs (rotating from horizontal to vertical, plates shifting)
Handling the Issues regarding the safety if within the reach and reporting the same to the concerns.
Reporting the Safety Issues which are not handled by us to the respective departments.
Training the team and newly recruited employees on HSE issues
Received several prizes in the Quiz programs conducted on HSE on National Safety Day.
Multi Skills
ARC Tack & TIG Tack Welding.
BAND SAW Cutting
Sharing Machine Operating
Plate Rolling Machine Operating
Gas Cutting
Plasma Cutting
Fork Lift Operating
Grinding
Scaffolding Aluminum
EOT Crane Operating
Education
High School Graduate, AP India - 1989
ITI - Fitter from TRC Industrial Training Institute, AP India - 1991
Apprentice: Praga Tools Limited, TL India - 1993