LIU, YONG (MICHAEL)
*** ********* **** **, *******, AB, T3A 5Z1, CANADA
Phone: +1-587-***-****; Email: acxj1b@r.postjobfree.com
HIGHLIGHT
** *****’ overall piping experience in design and field in Oil & Gas, Refinery, Petrochemical, Mining, Pipeline, SAGD and Hydro, successfully completed 10+ large projects;
Wealth of experience in EPC, operation, manufacture and construction site, including managing engineering work in accordance with project scope, schedule and procedure; conducting construction drawings based on technical specifications and designs, site inspection to verify that the construction/manufacturing works, engineering design, and as-built drawings/documents are matched
Comprehensive experience and knowledge in piping design methods, mechanical components, piping process systems analyzing, piping product fabrications & installations, piping stress analysis and piping hydraulic calculation;
Ability to provide innovative ideas in areas of piping design, as well as installation methods and procedures
Skilled in preparing technical correspondence for clients, clearly and effectively
Excellent communicator with the ability to build and maintain good relationship with client, internal/external engineering group as well as vendor
Excellent abilities of analysis and practical troubleshooting
Proficient in the following tools: AutoPlant, CADWorx, Plant 3D, PDMS, PDS, AutoCAD, MicroStation, NavisWorks, Caeser/II, HYSYS, developed many piping and equipment modeling procedures;
Familiar with ANSI, ASME, API, CSA engineering standards and codes;
PROFESSIONAL EXPERIENCE
BBE Hydro Constructors LP, Gillam, MB Nov. 2015 – Present
Field Engineer - Piping
Keeyask Generating Station
Scope of work: Developed work plans for mechanical and piping work. Provided engineering assistance to construction team to meet cost, project scope, schedules and procedure. Initiated requisitions for field purchases. Reviewed vendor and manufacturing drawings to verify the compliance with the codes, the technical specifications and the project engineering design. Assisted construction team in interpreting design drawings and piping and equipment installation documents. Planed and managed material delivery. Reviewed construction estimates, cost engineering study, schedules and budgets. Coordinated with construction team on activities affecting construction and provided technical support for troubleshooting.
Gas Liquid Engineering, Calgary, AB Aug. 2014 – Mar. 2015
Lead Piping Designer
Seven Generations Energy, Cutbank Gas Plant
Seven Generations Energy, Karr Multiwell Gas Battery Project
Scope of work: Arranged work in project area team. Reviewed all piping design deliverables before issue them to checkers and manage schedule and cost. Developed 3D Model, general arrangement drawings, Isometric drawings, material take-off, Tie-in list. Reviewed 3D design models and 3D laser scanning (Pointcloud) models. Daily updated Navisworks models. Coordinated with plant design lead, internal/external engineers, clients, and vendors to ensure that the work in accordance with project scope, schedule, procedure as well as the latest engineering drawings and documents from other disciplines and vendors. Attended project meeting, model review. Mentor and train junior designers.
Propak Systems, Airdire Mar. 2014 – Aug. 2014
Senior Designer
Bellatrix Exploration, Alder Flats Deep Cut Gas Plant, Detail
Mistral Midstream, Saskatchewan Ethane Extraction Plant, Detail
Scope of work: Prepared manufacture drawings as per the codes, technical specification and project engineering design drawings. Developed 3D piping and structure models, steel platform layout and detail drawings, steel support drawings, foundation layout drawings, structure BOMs, piping GA drawings, Isometric drawings, piping material take-offs. Reviewed vendor and other discipline drawings and documents. Reviewed 3D models. Daily updated Navisworks models.
Three Streams Engineering, Calgary Jul. 2012 - Nov. 2013
Project Area Piping Lead / Senior Piping Designer
Cenevous, Foster Creek Phase G, SAGD, Detail - Senior Piping Designer
Cenevous, Foster Creek Phase H, SAGD, Detail - Project Area Piping Lead / Senior Piping Designer
Scope of work: Arranged work in project area team. Reviewed all piping design deliverables before issue them to checkers. Developed 3D Model, general arrangement drawings, Isometric drawings, piping material take-offs. Coordinated with project piping lead, engineers, clients, vendors to ensure project schedule and quantity. Attended project model review meeting. Provided technical support and monitoring to design team.
DOW Chemical, Fort Saskatchewan Oct.2011 - Jun. 2012
Senior Field Piping Designer
Dow Chemical, CV-106 Hydrocarbon Underground Storage Project, FEED & Detail
Dow Chemical, 2012 Turn-Around ( Including many small projects )
Scope of work: Provided engineering assistance to construction team. Assisted construction team in interpreting design drawings and piping and equipment installation. Coordinated with construction team on activities affecting construction. Developed 3D Model, general arrangement drawings, ISO drawings, alignment sheets (plan & profile), material take-off, Tie-in list and project piping technical documents according DOW's piping specification. Enquired and ordered valves and special piping items. Coordinated with project manager, engineers, clients, vendors to ensure project schedule and quantity. Attended field visit meeting, project model review meeting and final team check meeting.
Stantec, Edmonton Jan. 2011 - Oct. 2011
Senior Piping Designer/Checker
Alyeska Pipeline Service, Trans Alaska Pipeline Project,
Scope of work: Generated 3D modeling. Developed general arrangement drawings, ISO drawings, plan and section drawings, alignment sheets (plan & profile), P&ID drawings, etc. Executed checking work to ensure them to meet technical and project requirement.
Tetra Tech, Vancouver Jan. 2010 - Jan. 2011
Piping Design Specialist
Cameco, Cigar Lake Uranium Mining Project, FEED & Detail
Cameco, Key Lake As-build Project
Scope of work: Developed underground H.P. JBS(Jet Boring System) piping design. Generated 3D modeling, plan and section drawings, P&ID drawings within a Cadworx environment. Executed piping stress analysis.
SNC-Lavalin, Edmonton Aug. 2007 - Apr. 2009
Piping Designer
TransCanada, Keystone Pipeline Project, FEED & Detail
Scope of work: Developed 3D Model, general arrangement drawings, ISO drawings, alignment sheets (plan & profile), material take-off, Tie-in list. Developed all equipment modeling procedures. Executed all plan & section drawings cutting, all drain systems trouble shooting. Prepared materials Take-off and coordinates for Tie-in.
National Process Equipment, Edmonton Aug. 2006 - Jul. 2007
Piping Designer
Pump and Compressor Skid Design. Developed P&ID, general arrangement drawings, plan and section drawings, BOM, fabrication spool drawings, etc.
China National Petroleum Co. ( CNPC ) Dalian Refinery Jan. 1997 - Aug. 2005
Field Piping Engineer, Senior Piping Design Engineer
CNPC, Diesel Hydrotreating Unit, - Field piping engineer / Senior Piping Design Engineer,
CNPC, Crude-Vacuum Unit, Detail - Senior Piping Design Engineer;
CNPC, Dewaxing Unit, Detail - Piping Design Engineer
CNPC, Reform Unit, Detail - Field piping engineer / Piping Design Engineer
Scope of work: Provided engineering assistance to construction team in meeting cost and time schedules. Initiated requisitions for field purchases. Reviewed vendor and manufacturing drawings. Assisted construction team in interpreting design drawings and piping and equipment installation. Planed material delivery. Reviewed construction estimates, cost engineering study, schedules and budgets. Coordinated with construction team on activities affecting construction. Arranged work in a project team. Estimated project man-hours. Executed piping stress analysis using Caeser/II, piping hydraulic calculation using Hysis and support design. Developed piping design specifications, standards and procedures. Selected piping materials. Reviewed all piping design deliverables before issue them to clients. Generated 3D piping models within a PDS environment. Created Isometric drawings. Developed plant layout. Prepared general arrangement drawings, plan and section drawings, material take-off, Tie-in list, line-list. Coordinated with PM, PE, other discipline leads & engineers, clients, vendors to ensure project schedule and quantity. Attended project model review meeting, HAZOP meeting, construction meeting. Provided technical support and monitoring to design team.
China National Petroleum Co. ( CNPC ) Dalian Refinery, Jul. 1994 - Jan. 1997
Process Engineer ( Maintenance and Operation )
Scope of work:
Duty of safe and normal running, supervise of product quality;
Monitoring and optimization of process units & mechanical equipment;
Establishment of production and maintenance plans;
Technical assistance to operation and maintenance;
Analyzing problems and troubleshooting critical factors;
EDUCATION & TRAINING
B.E. in Chemical Engineering
Xi’an Jiaotong University, China Aug. 1990 - Jul. 1994
Project Management Training
China Petroleum Engineering Co.(CPE), Dalian Branch 2001
CADWox Training
Tetra Tech 2010
SmartPlant Training
DOW Chemical 2012