james phipps
*** **** ***** **. **********, MO 63385
[pic]
acxiru@r.postjobfree.com
Project Management ~ Mechanical/Electrical Engineer ~ Productivity Driven
SUMMARY
Highly accomplished ENGINEER, PROJECT MANAGER with extensive track record
of innovation and success with thirty plus years of experience, skills,
knowledge, & education
ACCOMPLISHMENTS
. State of Missouri licensure in Professional Engineering
. CAP Certification from ISA
. PMP Certification from PMI
. Bachelor Of Science. Information Technology, Western Governors
University, Missouri
. Bachelor of Science, Electrical Engineering, University of Missouri,
Kansas City, MO
. MBA, Keller Graduate School of Management
. Identified need for computerized estimating system, and created the
program saving the company approximately 30% of time for the project
. Reduced system engineering time by 10%, manufacturing time by 10% and
installation time by 15% through directing productivity of engineering
personnel
. Received certification for OSHA 10 hour safety program
. Successfully negotiated price, function and delivery cost to improve
profit margin
. Proven ability as a lead Electrical Engineer for an established OEM of
customized conveyor equipment
PROFESSIONAL EXPERIENCE
Proposal & Estimating Specialist
Maverick Technologies 2015
to 2016
Company: Maverick Technologies is a full service systems integrator
offering a full range of master planning, facility design, packaging
automation, process and utility engineering services and can provide a
complete solution-from feasibility study and master plan development to
full turnkey projects.
. Responsible for preparation of estimates and proposal for various
potential business opportunities ranging from $5,000 to $5,000,000 in
size.
Principle Engineer
Maverick Technologies 2011
to 2015
. Responsible for managing all facets of electrical engineering including
system design, panel design programming of PLC's and HMI as well as field
checkout and startup of equipment.
. Projects include the following clients:
o Tate & Lyle Corn Processing Facility - work included writing
functional specifications, description of operation, PLC
programming, FTME SCADA screen generation, field installation and
start-up assistance. ControlLogix - Studio 5000 software, FT View
ME & SE Editions. Appropriate FT View Software
o Intel Corporation -I&C Project Engineer working in a cross
functional engineering team responsible for the design and build of
two new manufacturing facilities for Intel. Design and build
include design of Fiber network including all necessary
switchgear, PLC architecture, I&C design, P&ID drawings and other
necessary design documentation as well as being responsible for
startup of all installed equipment. ControLogix AB Software
o Cargill - Beef Packing Facility - work included assistance in
preparation of bid documentation including scope of work,
description of operation, implementation schedule and assistance in
pricing of job
o Pioneer Corn - Seed Corn Processing Facility - work included
writing functional specifications, description of operation, PLC
programming, FTME SCADA screen generation, field installation and
start-up assistance. PLC-5 and ControlLogix - Logix 5000 software,
FT View ME FT View Software
JAMES PHIPPS
Page 2
[pic]Senior Electrical Engineer
Barry-Wehmiller Design Group
2006 to 2011
Company: Barry-Wehmiller Design Group offers a full range of master
planning, facility design, high speed packaging automation, process and
utility engineering services and can provide a complete solution-from
feasibility study and master plan development to full turnkey projects.
Responsible for total design of electrical system including electrical
power distribution, instrumentation and controls, P&ID diagrams, electrical
schematics, control panel design, HMI system design and implementation,
programming, startup as well as startup and commissioning of the systems.
. Significantly elevated the competitive position by developing innovative
engineering project solutions and managing electrical projects taking
into consideration performance, cost, reliability and maintainability.
. Led all aspects of design and installation of new control panels,
including developing electrical schematics and creating bills of
material.
. Launched all PLC programming, HMI screen design, set-up and documentation
of control devices.
. Experienced in construction management for both mechanical and electrical
disciplines.
. Projects included the following clients:
o Nestle Waters North America - work included writing functional
specifications for operation of equipment and communications
interface between PLC and major equipment pieces such as fillers,
packers, labelers, date code printers, missing cap detection, etc,
writing description of operation for various water bottling lines
with speeds ranging from 700 to 1200 bottles/minute, necessary plc
programming, IFIX SCADA screen generation and field check out and
start up of all equipment. Other work included construction
management of electrical and mechanical sub-contractors.
ControlLogix, MicroLogix, PLC-5 using AB software. GE IFIX SCADA
software, (IFIX 2.6, IFIX 3.0)
o Pepsi Bottling Group - Construction Management of new Greenfield
Aquafina bottling line. Included civil, mechanical and electrical
sub-contractors. PLC-5, ControlLogix - AB Software
o Clorox - Construction management for replacement of two kitty
litter filling and packaging lines. Included installation of
fillers, packers, check weighers, labeling equipment, date code
printers, palletiziers as well as over 2,000 ft of high speed
packaging conveyor.
o Unilever - Consulting Engineer at facility that was being converted
from producing Slimfast to Ice cream. Responsibilities included
monitoring conveyor installation and field wiring.
Electrical Project Engineer
NKC of America, Memphis, TN
2005-2006
Company: In addition to a direct presence in automotive part assemblies
such as engines, suspensions and steering systems, NKC's products include
entire assembly lines for most of the world-leading automotive
manufacturers.
. Responsible for developing innovative engineering project solutions to
achieve a competitive edge in performance, cost, reliability and
maintainability.
. Responsible for communication with clients to discuss technical aspects
of each project, diagnose problems and resolve costly issues in a timely,
efficient manner
. Maintained effective documented project specifications, including
electrical schematics, conduit drawings and wire lists, factory settings
of all supplied equipment and PLC programs.
. Maintained strong interpersonal and communication capabilities in working
with a wide range of personnel to gain insight, avoid potential problems,
and facilitate timely project completion.
. Worked with PLC-3, PLC-5 and ControlLogix using appropriate AB software.
GE Fanuc Genious I/O using GE Software for programming.
Director of Projects and Purchasing
Summit Financial Products, Inc., Trussville, AL
2004-2005
Company: Summit Products is a private company categorized under Games,
Toys, and Children
. Led new product development process from conception to the finished
project.
. Led negotiations with Chinese factories to obtain favorable pricing and
scheduling to discuss any existing or potential production problems with
new product design.
. Recognized by management and the manufacturing team for outstanding
ability to troubleshoot failures on the new production line and determine
cause of defect and correction methods
JAMES PHIPPS
Page 3
[pic]
Manager of Chain Standards
Dearborn Mid-West Conveyor Company, Kansas City, KS
1984-2002
Company: Dearborn Mid-West Conveyor is the sought after partner for the
design, integration and installation of complex material handling systems
for hard working industries in North America and abroad.
Manager of Chain Standards (ABI Group/Manager of Estimating and
Standards) ~ 1994-2002
. Direct responsibility for all Power & Free Standards developed and
used. Develop new standards for producing both 4" and 6" Inverted
Power and Free conveyors, thus producing standard components
rather than custom manufacturing of every piece.
. Developed an innovative estimating program that included pricing
for all types of conveyor components and assembled numbers for
efficient review
. Revised estimating procedures to facilitate a quicker review of
all estimate components, preventing profit erosion.
Project Manager ~ 1990-1994
. Responsible for all P & L functions within the project phases,
including engineering and manufacturing.
. Size of projects ranged from $500,000 to $30,000,000 in size
. Negotiated supplier and subcontractor contracts
. Scheduled shop fabrication, field installations, and tracked
actual man-hours against original projections.
. Projects included the following clients:
o General Motors - Project management for installation of two
conveyor lines in manufacturing facility. Project management
included sub-contractor selection, budget responsibilities
and scheduling and co-ordination of work between
subcontractors, scheduling delivery of components with
manufacturing as well as all communications with customer.
o Union Electric - Project management for converting from
usage of eastern coal to the more voluminous western coal.
Project management responsibilities include sub contractor
selection, management of budget and schedule, procurement of
parts, coordination with manufacturing facilities for custom
made chutes, field installation and start-up and
communications with customer.
o Whirlpool Corporation - Project Management for installation
of new Refrigerator manufacturing and testing line. Project
management included selection of sub-contractors, equipment
vendors, management of budget, schedule and engineering
resources
Senior Electrical Estimator / Senior Project Engineer ~ 1984-1990
. Responsible for logic and screen design, control system and
fabrication, electrical drawings, and electrical proposals for
automotive and industrial handling projects
. Evaluated proposals and prepared scope of work for electrical
contractors.
. Projects included the following clients:
o Mack Trucks - work included panel design, plc programming
and communications for all conveyors within a new truck
manufacturing facility. Conveyor types include AS/RS system,
parts picking system, inverted and overhead p&f conveyors,
electrified monorail, lifts, etc. PLC-2, PLC-3 and SLC-500.
AB software
o Firestone Tire and Rubber - working included panel design
and plc programming for conveyors that moved tires from
molds to the warehouse. Rockwell PLC-3 and SLC-500. AB
software
EDUCATION
BSIT, Bachelor of Science Information Technology
Western Governors University - Missouri
MBA, Master of Business Administration
Keller Graduate School Management, Kansas City, MO
BSEE, Bachelor of Science Electrical Engineering
University of Missouri, Kansas City, Kansas City, MO
Registered Professional Engineer in the State of Missouri
PMP Certification from PMI