Post Job Free
Sign in

Power Plant Technician

Location:
Dubai, DU, United Arab Emirates
Salary:
3500 to 4000
Posted:
November 09, 2016

Contact this candidate

Resume:

Nadeem Ahmad

Electrical Technician

Nationality

Pakistani

D.O.B

** *** ****

Contact Phn:

+971*********

Dubai

Contact Phn:

+923*********

Pakistan

+923*********

Passport No:

GS1158631

GS1158632

SPECIALIZATION:

SUB STATION INSTALLATION,

SWITCH GEAR,CONTROL & PROTECTION,MAINTENANCE,TROUBLE SHOOTING, RELATED SAFETY EXPERTISE

[GAS INSULATED SWITCHGEARS]

Power plant

Gender:

Male

Skype:

Nadeem Ahmad or 030********

E-Mails:

acxfkq@r.postjobfree.com

Address:

UAE

Burjman Metro Train Station Alkarama . Dubai.UAE

Address:Pak

Gujranwala.(Punjab).Pakistan

Objective:

Endeavor The Corporation Be At Optimum By Utilizing My Versatile Excogitation, Contrivance & Experience.

Bottom Line Ability:

I am hard working & person with good communication skills and can work for an extended hours to meet the given target in the specified time frame. I like to face challenges & can go an extra mile to meet the given goals. I will bring good working ethics and time management skills to your organization. Looking in my technical aptitude I am considering myself the best suitable candidate for the post applied

I have exceeded targets set by the company and giving my staff quality direction. My main goal now is to move into more work capacity offering guidance and experience on a more day to day running of an operation.

Qualification:

Technical Qualification:

Specialization/ Stream:

Diploma of Associate engineering (3 years D.A.E) 2005

Electronics

Professional Details:

Work experience:

2007 to still working

Function Area:

Sub Station Installation, Switch Gear & Protection(Even Energized)

Specialty:

Specialization In Sub Station Installation, Switch Gear, Control,Protection,Maintenance,Erection and Testing of GIS.

Current Employer:

Elahi Engineering Contracting Co. Lhr

Current Position:

Electrical Engineer / Electrical Supervisor

Additional:

Mechanical installation of Sub Station, gas insulated Switch Gear & Protection accessories

ExperienceSynopsis:

Sr #

Discipline

From

To

Duration

Organizations

1.

Electrical Technician

05/2013

09/2016

3 y 4 m

Ellahi Engineering PvtCO.

2.

Electrical installation Technician

08/2007

04/2011

4 y 7 m

Al-Fanar Co. Saudi Arabia

3.

Electronics Technician

05-2005

05-2006

1 Year

Star LabortriesPvt Co. Lahore Pakistan

Computer Skills:

1.

Windows 7, vista, Xp

2.

Ms Word 2007/XP,WIN 7/Excel

3.

Net work Usage

Languages :

English

Arabic

Urdu

Punjabi

Working Experience

11 Year & 4 Months

With Ellahi Engineering Co Pvt (Ltd) Lahore Pakistan

(May 2013 To Sep 2016 ) 3 years & 4 month

Sr.

Name of Sub-station

Remarks

01

132-KV Switching station ( Hamza Shugar Mill) Jheetha Bhutta Khanpur Raheem Yaar Khan

(Client Siemens).

Electrical Technician, erection of gas insulated system, installation of L.C.C. panels. Pre-checking& modification of L.C.C panels. Control & Relay Panels, installation of switch gears, verified as per drawings termination of powers of control cables.

02

220KV/132KV Substation

(Saggiyan) Lahore/ Pakistan.

(Client Siemens)

Electrical Technician, erection of gas insulated system, installation of L.C.C. panels. Pre-checking& modification of L.C.C panels. Control & Relay Panels, installation of switch gears, verified as per drawings termination of powers of control cables.

03

220KV/132KV Switching Station

Kassowal.

(Client NTDCL)

Complete erection of 01 - 220/KV Transformer bay & 132KV line bays (Outdoor) Sub Station, erection of 01-No. 500-MVA, Power Transformer, work as an Electrical Technician.

Al Fanar Co. Saudi Arabia

(Aug 2007 to April 2011) 4 Year & 7 months

01

380-KV Switching station ( Rabigh / Makkah )

(K.S.A.)PP-86

Erection of gas insulationsystem, installation of L.C.C. Panels. Pre-checking & modification of L.C.C panels. Control & relay panels, installation of switch gears, termination of powers of control cables and work with ATS commissioning Engineers & works on shutdowns in SEC power plant, for bay AC11 HVE line and AC 34 Yanbu line.

02

380KV/110KV Sub Station in (Thuwal)

(K.S.A) PE-84

Erection of gas insulation system, erection of 500-MVA power transformers, installation of L.C.C panels, control & relay panels, installation of switch gears, termination of powers &control cables and work with ATS Commissioning Engineers.

03

380KV/110KV Wadi Jaleel

Sub Station (Makkah)

IN (K.S.A)PE-70

Complete erection of 01- 380KV transformer bay & 08-Nos 110KV line bays (Outdoor) Sub-station, erection of 01-No. 500-MVA, Power transformer, installation of fire fighting (Water) system of power transformer. Work with ATS Commissioning Engineers.

Star Laboratories Pvt Ltd. Lahore Pakistan

(May 2005 to May 2006) 1 year

Plc Machine Operator injunction filling.

Repairing and maintenance.

Technical Expertise in

Execution of project as per the drawings or installation manuals.

Function of protection system of electrical operated equipment’s.

Residual current protection, active and reactive reverse power protection system.

Function and usage of circuit breakers, SF6, ACBs, and tripping circuits.

Substation grounding installation.



Contact this candidate