Post Job Free

Resume

Sign in

Design, Industrial, Quality, Production Engiuneer.

Location:
Laredo, TX
Posted:
November 04, 2016

Contact this candidate

Resume:

RESUME

PERSONEL INFORMATION:

NAME: SILVESTRE JIMENEZ

PLACE AND DATE OF BIRTH: NUEVO LAREDO TAM. JUNE-13th-1960.

ADRESS: 7614 LAGUNA DEL MAR, APT# 622, ZIP CODE 78041

PHONE NUMBER: 956- 2516962, 011**-***-***-** 20 (Mex)

E-MAIL: acxdga@r.postjobfree.com

.

ACADEMY FORMATION:

MASTER DEGREE IN ELECTRONICS (POST-GRADUATE)

INSTITUTO TECNOLOGICO DE NUEVO LAREDO, MEX. JAN 1996.

INDUSTRIL ELECTRONIC ENGINEER. (COLLEGE)

INSTITUTO TECNOLOGICO DE NUEVO LAREDO, MEX. JUN 1983.

ELECTRONIC TECHNICIAN.(HIGH SCHOOL)

INSTITUTO TECNOLOGICO DE NUEVO LAREDO, MEX. JUN 1978.

MIDDLE SCHOOL.

SECUNDARIA FEDERAL #4, FRANCISCO I MADERO, NUEVO LAREDO, MEX. JUN 1975.

ELEMENTARY SCHOOL.

ESCUELA FEDERAL CUAUHTEMOC, NUEVO LAREDO, MEX. JUN 1972.

PROFESSIONAL EXPERIENCE:

CHROMALOX: JUL’12 TO APR’16

DESIGN ENGINEER.

+DESING INDUSTRIAL AIR HEATERS WITH CONTROLS. (MOTOR, HEATER ELEMENTS OVERHEAT ALARMS)

+ECN’S IMPLEMENTATION. (ENGINEERING CHANGE NOTICE)

+GIVE SUPPORT TO THE MANUFACTURING PROCESS, PRODUCTION AND QUALITY DEPARTMENT.

WIEGAND S.A DE C.V. JUN’06 TO JUL’12

PRODUCTION COORDINATOR 2ND. SHIFT. Handling approx. 200 employees and 4 supervisors.

OTHER POSITIONS:

INDUSTRIAL ENGINEER (MANUFACTURING),

+PRODUCTION LINES TRANSFERENCES COORDINATOR FROM US TO MEXICO.

+DRAWINGS ECN/ECR VERIFICATION FROM DESIGN DEPARTMENT, TO IMPLEMENT THE ROUTE OF OPERATIONS AND STANDARD TIME FOR A NEWS AND/OR ACTUAL PRODUCTS.

+DEVELOPMENT AND IMPLEMET A NEW STANDARIZATION OF OPERATIONS AND ROUTES PROJECT FOR APROX. 600 DIFFERENTS PART NUMBERS OF PRODUCTS, 100%. IMPLEMENTED.

+DEVELOPMENT LAY-OUTS FOR CHANGES AND NEW PROCESS OF PRODUCTS.

+CORDINATE REWORK SYSTEM RECOGNITION, FOR AN ENGINERING CHANGE NOTICE, PRODUCTS FROM

CARRIER CORPORATION.

PAG. 1/3

QUALITY ENGINEER.

+ CONTROL PLANS IMPLEMENTATIONS.

+ PFEMA IMPLEMENTATIONS.

+ POKA -YOKE'S IMPLEMENTATIONS.

+ ISO 9000 INTERNAL AUDTS.

SPRINFIELD WIRE S.A. DE C.V. MARCH'99 TO OCT’05.

DEVENLOMENT SUPPLIERS ENGINEER (RECEIVING INSPECTION)

+GLOBAL REDUCTION OF DEFECTS OF THE MATERIALS RECEIVING FROM OUR SUPPLIERS.

+DEVENLOPMENT OF SURVEYS “ON SITE” TO APPROVED THEM AS SUPPLIERS.

+VISITS ON SITE TO OUR SUPPLIERS FOR VERIFY THEIR PROCESS, IN ORDER TO IMPLEMET IMPROVEMENTS TO REDUCE THEIR DEFECTS IN THE PROCESSES.

+DEVENLOPMENT PROCEDURES OF PROCESS IN ORDER TO IMPLEMENT PFEMA Y CONTROL PLAN.

BRANSON S.A. DE C.V. DEC'97 TO DEC'98

QUALITY CONTROL COORDINATOR.

QUALITY SYSTEM IMPLEMENTATION.

TECHNICIANS SUPPORT FOR DIGITAL BOARD REPAIR, ON ULTRASONIC ELEMENTS.

CORRDINATE THE ISO 900 CERTIFICATION FOR THE VERY FIRST TIME WITH AN AMERICAN CERIFICATED COMPANY N-VERITAS.

UPDATE AND IMPLEMENTE FUCTIONAL TEST PROGRAM OF ULTRASONIC GENERATORS, WITH A LAB-VIEW SOFTWARE.

ELAMEX S.A DE C.V. OCT'88 A DEC'97

QUALITY ENGINEER

PRODUCTION COORDINATOR,

INDUSTRIAL AND DESIGN ENGINEER,

MAINTENANCE EQUIPMENT ENGINEER.

NEW PRODUCTS TRANSFERENCE COORDINATOR FROM USA TO MEXICO.

PHONE AND TERMINALS REPAIR/REFURBICHED PROJECT OF SIEMENS AUSTIN TX.

WIRELESS PHONE REPAIR PROJECT OF AT&T, CHESTERFIELD MO.

COURSES TAKEN:

+ SPC, (STATICAL PROCESS CONTROL)

+ OFFICE (ECXEL, WORD, POWER POINT, ETC.)

+ AUTOCAD, SOLID WORKS.

+ LEAN MANUFACTURING 101,

+ ISO 9001 INTERNAL AUDITORS (INTERNATIONAL LEADER),

+ SIX SIGMA YELLOW BELT

+ IMPLEMENT OF POKE-YOKE

+ METROLOGIA

+ ERGONOMY APPLIED TO THE PROCESS.

+ SCRAP REDUCTION IN PROCESS.

+ COMUNICATIVE SUPERVISOR.

+ WORK, LIVE AND HELTH.

+ WIRELESS PHONE TROUBLE SHOOTING AT&T.

+ PHONE AND TERMINALS TROUBLE SHOOTING ROLM SYSTEM. (SIEMENS)

+ HEATER ELEMENTS ASSEMBLY.

+ ELEMENTAL/BASIC LAB-VIEW SOFTWARE.

+ LEADERSHIP.

+ ELECTRIC AND ELECTRONICS DRAWINGS INTERPRETATION..

PAG. 2/3

PROFESSIONAL ACHIEVEMENTS:

+ TRAVEL TO HUMEN, CHINA, TO TRAINING PERSONNEL ON SITE (TWICE)

+ TRAVELING TO SEVERAL CITIES OF USA, TO TRINING IN DIFFERENTS PRODUCTS (AROUND EIGHT TIMES).

+ 60 % DEFECTS REDUCTION IN PROCESS FROM 23,000 PPM'S TO 9,200 PPM'S

+ 19 % GLOBAL DEFECTS REDUCTIONS OF SUPPLIERS FROM 8,000 TO 6,500 PPM'S

+ TEACH INTENSIVE ELECTRONIC COURSE ROR TECHNICIANS (3 MONTHS DURATION).

+ PHONES AT&T AND SIEMENS, INSTRUCTOR FOR REPAIR TECHNICIANS..

+ DATA COLECTION FOR DAMAGED COMPONENTS OF PHONES, IN ORDER TO CHANGE THE COMPONENTS

TO IMPROVE THE FUNCTIONAL LIFESPAN.

+ UPDATE THE TEST PROGRAM OF WIRELESS PHONE, TO REDUCE 10% LINE REJECTION.

+ DISIGN PRODUCTION LINES FOR IMPLEMENT NEW PRODUCTS. (WIEGAND)

+ STANDARITAZION AND IMPLEMENTATION OF ELEMENTS STANDARD PROCESS ROUTES.

+ DAILY SCRAP REDUCTION IN DIFFERENT PROCESSES UP TO $300 DLLS IN DIFFERENTS ELEMENTS.

+ GET LEADER ISO 9000 INTERNAL AUDITOR.

+ GET AN INTERNATIONAL CERTIFICATION OF ISO 9000 FOR BRANSON COMPANY.

+ IMPLEMENT TECHNICAL FORMULAS FOR REPAIR CORDLESS PHONES.

LANGUAGES:

SPANISH: 100%

ENGLESH: 80%. (READ, WRITTEN AND SPOKEN)

.

PAG. 3/3



Contact this candidate