HERTEL SHEHU
**** ******** ******, ************, ** 19115
tel. 267-***-****
e-mail: acxau5@r.postjobfree.com
Objective: To give my contribution to the business success based on my technical skills and full experience in mechanical engineering.
Proficient and skilled in technical specialty, machine operations and equipment processes:
All the processes in Manual Lathe and Boring, Mill Machines, experienced in Mig and Stick Welding processes, blue prints reading and interpreting AutoCAD 2D & 3D professional drafting and design, and maintenance of the storm water and waste water systems.
Recognized for dedicated work ethic and productivity with individual responsibility and part of the team. Capable of doing work that requires concentration, high degree of patience and attention to detail. Able to work independently and motivated to work efficiently without direct supervision in busy environment. Flexible to changing priorities and learn new skills rapidly.
EMPLOYMENT HISTORY
Water Supply and Sewerage – Tirana, Albania
Mechanical Engineer of Department of Water Resources February 2016 – May 2016
Maintained the water pumping station
Controlled and maintained the main lines of water from resources to pumping station and reservoir
Worked to complete new water wells in order to increase water flow to the consumers
Director/Manager of Public Service- Municipal of Vlore City, Albania May 2005 to November 2015
Controlled the maintenance and repair of wastewater sewerage
Controlled the pumping station of wastewater sewerage
Controlled the maintenance and repair of the urban roads of the city
Controlled the maintenance and repair of public seaside of the city
Controlled the maintenance and repair of the traffic signal system of the city
Controlled the maintenance and function of all machines and technology trucks needed for all processes above
Contractor “Nikos Kamatakis”ATEE – Vlore, Albania April 2002 to August 2004
Health and Safety Engineer
Responsible for the implementation of the Health and Safety Plan compiled by the Company and the compliance with the local and international Health and Safety standards and requirements – A project funded by the European Union
Worked as a Chief Engineer for the Company’s Workshop, responsible for the maintenance and repair of the Company’s Plant
Worked as a Site Engineer, responsible for the execution and integration of the E&M Works foreseen in the aforementioned projects.
VIEMKA SA – INDUSTRIAL PROJECTS AND MECHANICAL CONSTRUCTIONS
MECHANICAL ENGINEER January 1997 to December 1999
Worked as an assistant supervising engineer during 1997 to 1998 and as a supervising engineer during 1999 in Energy – Industrial projects in Greece (see the detailed information in Table 1)
Education
Poly-Technical University – College of Mechanical Engineer - Tirana, Albania – Graduated in 1996
Technical High School – Mechanic Technician – Kucova, Albania - Graduated in 1990
Table 1 – ENERGY – INDUSTRIAL PROJECTS IN GREECE 1997 -1999
Year
Project
Employer
1997
Transportation of steam pipes hangers at the 8th unit AISAG
PPC-AISAG Keratsini
1997
Fencing AISAG station
PPC-AISAG Keratsini
1997
Repair of sea water circulation pump at the 9th unit AISAG
PPC-AISAG Keratsini
1997
Repair utility works at units I&II AISM Megalopolis
PPC –AISM Megalopolis
1997
Extension and replacement of fire lines AISAG
PPC – AISAG Keratsini
1997
Stack repair at units I –II AISM Megalopolis
PPC – AISM Megalopolis
1997
Improvement of equipment at the 8th unit AISAG
PPC – AISAG Keratsini
1997
Silencer of vacuum pumps at the 8th unit AISAG
PPC – AISAG Keratsini
1998
Closed circuit reconstruction at the 9th unit AISAG
PPC – AISAG Keratsini
1998
Repair of feed water tank deaerator of the 9th unit AISAG
PPC- AISAG
1998
Stainless steel desalinated water pipeline at the 9th unit AISAG
PPC – AISAG Keratsini
1998
Repair utility works at units I&II AISM Megalopolis
PPC –AISM Megalopolis
1998
Electrical panel cabinets at the 8th unit AISAG
ANSALDO Spa
1998
Replacement of bottom of Fuel Tank No. 8 Linoperamata Crete
PPC – AISAG Keratsini
1998
Construction of a new reheated steam pipeline from the 8th to the 9th unit AISAG
PPC – AISAG Keratsini
1998
Construction of corridors and staircases on boiler and machine room AISAG
PPC – AISAG Keratsini
1998
Replacement of stainless steel piping for acid at the 8th&9th units AISAG
PPC – AISAG Keratsini
1998
Restoration of superheated steam leaks at the 8th&9th units AISAG
PPC – AISAG Keratsini
1998
Restoration of preheaters leaks at the 8th&9th units AISAG
PPC – AISAG Keratsini
1998
Booster fans alignment at the 8th unit AISAG
ANSALDO Spa
1998
Replacement of superheated steam sample small bore piping at the 9th unit AISAG
PPC – AISAG Keratsini
1998
New frame of 500KW electric motor FD fan of the 8th unit AISAG
PPC – AISAG Keratsini
1999
Repair of refractories in boilers A&B at the 9th unit AISAG
PPC – AISAG Keratsini
1999
Stack repair at unit III Aliveri
PPC – AISA Aliveri
1999
Manufacture of 400KW electric motors frame for conveyor’s drive PPC Megalopolis Lignite Center
PPC –LC Megalopolis
1999
Reconstruction of inner stack of unit IV AISA Aliveri
PPC – AISA Aliveri
1999
Reconstruction of conical bottom at stack of unit IV AISA Aliveri
PPC – AISA Aliveri
1999
Repair of stacker No 1 at the Megalopolis Lignite Open Mine
PPC PPC –LC Megalopolis
1999
Replacement of sea water circulation pump No.1 at the 9th unit 200MW AISAG
PPC – AISAG Keratsini
1999
Construction of the pump station and sewage network AISAG
PPC – AISAG Keratsini
1999
Functional improvements at the 8th unit AISAG
PPC – AISAG Keratsini
1999
Flow cooling air at filters, converters etc at unit III AISM
PPC –AISM Megalopolis
1999
Repair of stacker No 2 at the Megalopolis Lignite Open Mine
PPC – LC Megalopolis
1999
Convert of spray line on unloaders of fly ash at unit III AISM
PPC –AISM Megalopolis