Career Objectives:

To obtain a position of Engineer or Supervisory Positions.

To pursue a challenging career in the field of Commissioning and Maintenance, so that I can utilize my knowledge and skill of instrumentation effectively and efficiently in a practical manner in my professional approach.

Personnel Details:

Date of Birth : 12th June, 1969

Education : Diploma in instrumentation & Control, D.N. Polytechnic,

Ahmadabad, Gujarat, India, 1991-92.

: Instrument Technician, I.T.I. (Industrial Training Institute), Gujarat, India, 1988.

Tech. Qualification : Apprenticeship Training (N.C.V.T.) Instrumentation & Control, Gujarat, India 1991

Passport Details : Z 1738936 Issue: - 04/08/2011 at Ahmadabad Expiry: - 03/08/2021

Computer : MS Office, Internet.

Language Known : English, Hindi, Gujarati

Marital Status : Married

Driving License : India (LMV)

HSE Training History :

H2S/BA Awareness and Escape. (Opito, Maersk Oil and QP Approved). Exp: 10, Nov. 2015.

Permit to Work System.

Job Hazard Analyses.

Supervision of Safety and CPR First Aid.

Attend a Training Permit to work (PTW) by instructor ADCO, Abu Dhabi, UAE

Tropical Basic Offshore Safety Induction Emergency Training (TBOSIET) Through ENERTECH Qatar. (Opito Approved).

Fire prevention and fire frightening, Personal safety and social responsibilities, Elementary first Aid, Personal Survival Techniques

Experience in Abroad

Renco SpA. (GE).

I&E Supervisor From: 17,May 2015 To 30,December 2015.

Worked for their Ob-Ob Gas Plant - Power Plant, Ebocha Oil Center Gas Gathering, Kwale Gas Injection Unit. For PlantGeria Company Ltd., (Installation, Commissioning, Start Up, Maintenance and Major & Minor Overhauling).

Own By NAOC,(Agip / ENI).

Units:

Low Pressure Gas Compression:

Driving Equipment: Gas Turbine: GE-NP- PGT5/10

Driven Equipment: Centrifugal Compressor- GE-NP- BCL 405-BCL 356-BCL306A

Low Pressure Gas Compression:

Driving Equipment: ABB Electric Motor-AMD500M6RABM

Driven Equipment: Reciprocating Compressor- Nuovo Pignone- 2HM/1 SN:6942, 6955, 6956

Compression Booster:

Driving Equipment: Gas Turbine: Nuovo Pignone-MS3002 SN:05668, 05683, 05684

Driven Equipment: Centrifugal Compressor: Nuovo Pignone- 2BCL407A –SN:10930, 109331

M.P.Gas Compression:

Driving Equipment: Gas Turbine: GE-NP-MS 1002B SN:05317, 05318

MS 1002D SN:05701, 05702

Driven Equipment: Centrifugal Compressor: Nuovo Pignone- BCL358 –SN:10934, 10935, 10932, 10933

H.P. Gas Compression Reinjection:

Driving Equipment: Gas Turbine: GE-NP-MS 3002 & PGT10 SN:05346, 05347, 05348

Driven Equipment: Centrifugal Compressor: GE-NP- BCL306A&B SN:10243,10244, 10245, 10246, 10247, 10248

Power Generation:

Driving Equipment: Gas Turbine: GE-NP-MS 1002B SN:05319, 05321

Gas Turbine: GE-NP-MS5001 SN:

Driven Equipment: Alternator: Ansaldo- Brush

Alternator: HMA- DG 185ZL-04 SN:

Extraction Propane Chilling (LNG):

Driving Equipment: Gas Turbine: GE-NP-MS 1002D SN: 05617, 05637

Driven Equipment: Centrifugal Compressor: GE-NP-3BCL405 SN:10923, 10924

Ebocha Gas Compressor:

Driving Equipment: ABB Electric Motor-QU500LP6 SN:

Driven Equipment: Reciprocating Compressor-GE-NP-2 HM/1 SN:

Sales Gas Compressor:

Driving Equipment: Peebles Electric Motor-ET 630-2240J, ET-7100-2800J SN:

Scott Electric Motor-

Driven Equipment: Centrifugal Compressor- Demag: 06 MV 01A, 71A SN:

Siemens: 06-MV 7A SN: LC1448, LC1449

LLP Gas Compression:

Driving Equipment: Gas Engine- Cameron, Caterpillar-G399

Driven Equipment: Reciprocating Compressor-Cameron-GE-NP-HM1 SN:

LNG:

Driving Equipment: Expander-Rotoflow

Driven Equipment: Axial Compressor-Rotoflow

TM 2500 For Ebocha Gas Gathering Plant. Power Generation U-2500, TG2500EGMT001-GT-Alternator-HMA

Fram- 1,3,5 MK-II, IV, VI, V, Vie. ABB PLC5. Siemens, Delta V (Gas Plant). Plant Machines, Auxiliaries & Related Process Plant.

Worked as a Site Engineer Not for Control Systems. (Create/Modify/Design or Configurations).

DOPET: (Doha petroleum Construction Co. Ltd.,) Qatar Petroleum, Qatar., From: Nov. To Dec. 2014.

Instrument Commissioning Supervisor. (I&E).

Assigned for EPIC for Automation Upgrade Commissioning Works at Fahahil Main Degassing Station, Fahahil North Degassing Station, Fahahil South Degassing Station, /Fahahil Stripping Plant and North Field Injection Station for Qatar Petroleum Project in DUKHAN.

Liaised for Signed Loop Folders.

Control System DELTA V- v-12. PCS, ESD And, CHARMS For SIS.

Foundation Field Bus Applications.

Duties and Responsibilities.

• Responsible for supervision and monitoring to all contractors.

• Closely monitor and resolved all queries raised by sub-contractors regarding technical non conformities and standards, review all change work as required.

• Assigned to the Commissioning & Start-up group for plant facility commissioning.

Duties included commissioning of all plant instrumentation, and associated

equipment, including all F&G systems, ESD, SIS, PCS Delta V Control system etc.

• Liaise with the QA/QC to ensure the RFI for test reports and NCR are closed out.

• Prepare and review of method statement, Pre-comm. Procedures, checks, tests, mechanical completion of Instruments in line with the P&ID’s, etc..,

• Supervision of that inspection and loop tests are carried out in safe and control manner.

• Supervision of that planning, coordination, execution and follow up of all construction & Pre-comm. activities are done in strict compliance with the specifications.

• Liaise with the construction and commissioning team.

• Attending the minutes of meeting with the client regarding the progress of the work and quality related issues.

• Perform technical tasks assigned by the Commissioning site Leader related to the preparation and execution of the pre-commissioning, commissioning, startup activities. Interface with Construction, Engineering, Procurement Contractor disciplines, construction personnel, vendors and subcontractors.

• Sign off mechanical completion, Pre-comm. tests, check sheets and verify progress database

For Telecommunications. : Installed Panel, JB’s and Laid cable (FOC, ETHERNET, COXIAL, Foundation Fieldbu, Profibus, Prefab Cables).

Panel to Panel Cabling (Control-HUB-Servers-Alarm Module-Logic Module-Historian Module ETC’s) & Wiring for plant to plant for Secure, Real-Time flow of Information, Voice, Data and Video to form and within the facility. (TMS).

Telecom Maintenance System.

Network Management System.

Power Supply System.

VSAT, SCADA Communication

PABX & PHONE System

Internet, entertainment & Video Conference.

PAGA, Siren, CCTV, Access Control, Radar, Navigations System.

Paging & Radio System ETC’s..

.

Resigned from positions Due to an accident of my Wife.

Wood Group GTS / Shanahan Engineering Brunei Darussalam. From: Jan. 2014 To March 2014.

I&C Supervisor

Worked for their Gadong Power Station 2 Project by BPMC. Project : Gadong GT 23, 42 MW Major Outage.

Siemens / TurboCare. S - 14 - 010.

BPMC/E&P/DESC.A/2012/09

GE Frame 6, MS 6001-B, Mark-V. Speedtronics.

Assigned for Dismantle, Overhauling, Calibration of Field Instruments and Cable laying/Testing, Functional Checks, Commissioning, Start Up and Maintenance for Auxiliary (Accessories), Turbine, Generator, Exciter, Fire and Gas System Works(Contracted for Outage Assignments).

Duties and responsibilities.

• Responsible for supervision of our supervisor and monitoring to all contractors.

• Closely monitor and evaluate project progress status, resolved all queries raised by sub-contractors regarding technical non conformities and standards, review all change work as required.

• Perform technical tasks assigned by the Commissioning site Leader related to the preparation and execution of the pre-commissioning, commissioning, startup activities. Interface with Construction, Engineering, Procurement Contractor disciplines, construction personnel, vendors and subcontractors

Daelim Indutrial Ltd., Yasref ( YERP) Project, Yanbu. KSA. From: April, 2013 To Nov, 2013

Instrumentation Supervisor

Yanbu Export Refinery Project (YERP) Yasref. ARAMCO

EPC 3 & 4, Gasoline and Hydro cracker Packages.

Sulfer Recovery Unit, Amin Regeneration Unit, Sour Water Stripper.

Installation, Calibration, SAT, Loop Checks, Pre-Comm, Commissioning for Field Instruments.

Control System : Yokogawa Centum VP, Pro safe RS., Siemens Simatic S7-300.Hart, Foundation Fieldbus Applications.

Duties and Responsibilities.

• Responsible for supervision of our supervisor and monitoring to all contractors.

• Closely monitor and evaluate project progress status, resolved all queries raised by sub-contractors regarding technical non conformities and standards, review all change work as required.

• Assigned to the Commissioning & Start-up group for plant facility commissioning.

Duties included commissioning of all plant instrumentation, and associated

equipment, including all F&G systems (Pro safe),ESD systems, Yokogawa Centum VP system etc.

• Liaise with the QA/QC to ensure the RFI for test reports and NCR are closed out.

• Prepare and review of method statement, Pre-comm. Procedures, checks, tests, mechanical completion of Instruments in line with the P&ID’s, etc..,

• Supervision of that inspection and loop tests are carried out in safe and control manner.

• Supervision of that planning, coordination, execution and follow up of all construction & Pre-comm activities are done in strict compliance with the specifications.

• Liaise with the construction and commissioning team.

• Attending the minutes of meeting with the client regarding the progress of the work and quality related issues.

• Perform technical tasks assigned by the Commissioning site Leader related to the preparation and execution of the pre-commissioning, commissioning, startup activities. Interface with Construction, Engineering, Procurement Contractor disciplines, construction personnel, vendors and subcontractors.

• Sign off mechanical completion, Pre-comm. tests, check sheets and verify progress database.

A.T.I Ltd. UK. From: 19, January To 28 Feb. 2013.

Total E&P/ Spie Oil & Gas Services Angola.

As Instrumentation Foreman I am Responsible for Maintenance work for their Dalia F.P.S.O., Block-17.

Due to Visa Restrictions for Expatriate Not joined again.

ADCO/NPCC BAB THAMAMA ‘G’ & HABSHAN 2, (1.8 MMBOPD PHASE-1 Project).

Through Al Sultan offshore and onshore Oil/Gas field services, Abu Dhabi, UAE

As a Senior Instrument Commissioning Technician From: 1,September 2011 To 17 October 2012.

Responsible for Testing, Cold - Hot Loop Checking, Functional Test, C&E, Pre-Commissioning commissioning and start - up activities related to the project expansion & Existing Plant.

Central Degassing System, Remote Degassing System & Well Head Control Panel’s (Production & Injections) and water injection Cluster’s Control panels.

Control System For PCS, ESD, F&G, RTU: ABB AC 800M, HI, Xa, And HIMA. (FF/Profibus Network)

For Telecommunications. : ABB xA : Installed Panel, JB’s and Laid cable (FOC, ETHERNET, COXIAL, Foundation Fieldbu, Profibus, Prefab Cables).

Panel to Panel Cabling (Control-HUB-Alarm Module-Logic Module-Historian Module ETC’s) & Wiring for plant to plant for Secure, Real-Time flow of Information, Voice, Data and Video to form and within the facility. (TMS).

Telecom Maintenance System.

Network Management System.

Power Supply System.

VSAT, SCADA Communiation

PABX & PHONE System

Internet, entertainment & Video Conference.

PAGA, Siren, CCTV, Access Control, Radar, Navigations System.

Paging & Radio System ETC’s.

.

Xenergi Oilfield Services, Nigeria From: May, 2011 to July, 2011

As an Instrument Supervisor

Project 15 MMSCFD Gas Processing Plant and involved in installation, testing, calibration, loop checking, trouble shooting, Punch list, Pre-commissioning, commissioning for system PLC S-5000 and related field instruments.

SBM offshore, through Brunel Energy LLC, Abu Dhabi from: February, 2011 to April, 2011

Project: “EnCana “Deep Panuke”, offshore production Module.

As an I & C Senior Commissioning Technician

Commissioning work of Control System: Siemens S 7 and related field instruments for Process Control & ESD, Fire & Gas System.

SPIE, Oil & Gas Services, Abu Dhabi. From: August, 2010 to October, 2010

Project: Emal, emirates Aluminum Smelter Complex, Al Taweelah.

Client: SNC Lavalin / Worley Parsons (SLWP).

As an I&C Senior Commissioning Technician

Responsible for commissioning activities of 2000 MW power plants project, CCPP, GAS Turbine, HRSG and Steam Turbines from GE Frame 9 - Mark Vie.

Perform commissioning and start-up work prior handover to the client.

Calibration and trouble shooting of process control instruments

Assign to carry out all the loops for the steam and Gas turbines, Control System, Mark Vie.

Maersk Oil Qatar Al Shaheen ‘G’ Off-Shore Platform, through Kvasir International From 3 March, 2010 to 21 April 2010

As an Instrument Technician

Maintenance work for E&I, Fire & Gas and field instruments of production platform & Living facilities.

CAIRN ENERGY through Brunel Energy India. From: January, 2010 to February, 2010

As an Instrument Technician

For commissioning work of Barmer Gas Processing Project, India.

Involved in loop checking cable testing, trouble shooting, Commissioning of Field Instruments with control system (Yokogawa centum).

WAHA Oil Company, Libya (GIALO Field) October 2009 to November 2009

Through Engineering For Technical Oil & Gas Services (ETOS) at Libya.

Senior Instrument Commissioning Technician

Involved in Commissioning and Maintenance Activities (Outage) for Gas Turbine: GE-NP-MS5001-Ansaldo-HMA-DG, Control System Siemens, Fanuc – 90/30.

Shell Petroleum Development Company of Nigeria (SPDC) From: February 2008 to January 2009

Through ALCON Nigeria Limited

Senior I&E Commissioning Technician (Supervisor)

Involved in Construction, Pre-Commissioning, Commissioning and Start-Up work Activities for their Okoloma Gas Plant project.

Field Bus / Smart Field Instruments and control System Delta-V for PAS, Hima for SIS.

Fire & Gas System Dragger / Det-Tronics (ISBL / OSBL)

T.S.K.J., Nigeria (KBR), Bony Island, through SEPAM From: July 2007 to November 2007

Senior Instrument Commissioning Technician

For Pre-Commissioning, commissioning work of Nigeria LNG Train-6 project.

Control System Yokogawa I/A and related Field Instruments.

Fire & Gas System Dragger / Det-Tronics (ISBL / OSBL)

Eastern Bechtel, Abu-Dhabi, through UTS KENTZ From: July 2006 to June 2007

Senior Instrument Commissioning Technician

Involved in Installation, Calibration, Cable Test, Cold/Hot Loop Checking, Pre-Commissioning & Commissioning, C&E work for Habshan OGD-III Project.(GASCO).

Control System Honeywell Experian PKS for PCS, ESD, SIS, F&G (Det-Tronics) Field Instruments.

Experience in India :

Modern Petrofills, Gujarat, India From: December 1995 to April 2006

Instrument Technician

Commissioning and Maintenance work of plant, Control System Fisher Rosemount Provox Five & Allen Bradley 5/25, SLC-150 PLC’s and Related Field Instruments.

Power Generation, WHRSG, Boiler ( SKODA & Thermax).

Videocon Narmada Electronics Ltd., Gujarat, India From: November, 1993 to November 1995

Instrument Technician

Commissioning and Maintenance for the Plant with Control System Allen Bradley 5/25, SLC-150 and Related Field Instruments.

I.C.B., Gujarat, India From: September 1991 to December 1991

Instrument Technician

Involved In Commissioning activities for Caprolactum Expansion project in GSFC. India.

Indian Petrochemicals Corporation Ltd., Baroda, Gujarat, India From: April 1990 to April 1991

Instrument Apprenticeship Trainee

Indian Petrochemicals Corporation Ltd. Gujarat, India From: October 1988 to April 1990

On contract through Newton Engineering Company, Baroda, India

Instrument Technician

Involved in Maintenance and Project Expansion.

Professional Skills & Achievement :

20 + years of cumulative experience in installation, cable test, cold/hot loop checking, pre-commissioning, commissioning, troubleshooting and maintenance of On-shore/Offshore Oil & Gas processing plants, petrochemicals, refinery, water treatment plants, boilers, combine cycle power plants, Turbines. Technical background includes knowledge of all kinds of maintenance in continuous process plants and hands on experience in calibration and all other turn around jobs in process plants. Planning and organizing jobs with technician in risk areas in accordance with work permit and hazardous areas safety regulations. Loop testing, Commissioning & Witnessing of control systems. Well-verse in P & l drawings, Relay logic, Interpret location drawings and Hook-up drawings. Also involved in Hook-up, Pre-startup with production teams.

Calibration Installation, Loop checking and commissioning of Electronics & Pneumatics Instrument as per ISO standard procedure.

Work with latest protocol and solid domain knowledge of handling instrumentation such as: Foundation field Bus and hart communicators & different types of field test equipments.

Having good experience with DCS and PLC system likes a Fisher Rosemount PROVOX PLUS – 5, Honeywell Experian pks C-200., Delta- V (pass) Emerson (Processor-8.4, Controller MD Plus), Allen-Bradly 5/25, 2/16, SLC-150, Foxboro Controller-400-R, 650-R (SCADA), HIMA, AC/DC Drives (ABB Siemens).

Field Instruments of Hart, foundation Field bus and network data transmission applications.

Working with different types of pressure & flow smart transmitter (like Rosemount, Micro motion, Khrone, GE panamatrics, Foxboro, bells instrument, Honeywell, Taylor, Yokogawa) Different types of level transmitters like DP type, Displacer type radar type, Capillary type, Ultrasonic type, Air purge & bubbler types (like Masoneilan, Yokogawa, micro-motion, enders & Hauser, magnetron, ABB). Different types of switches like flow, level, pressure and temperature (like delta, bailey, switzer, danfoss, Ashcroft, sor, KDG, mobery, Baker CAC, Sirco, mercoid and cella). Working with different types of final control element with smart Positioners (like fisher DVC-6000F series, Foxboro eckaradt, Masoneilan, Mesto, PMV etc). I also familiar with different types of motor operated valve (like auma, Drehmo & rotork).

I have knowledge of bench & field calibration by using Druck (DPI-610), Unomate (Trx-2), Emerson source & measuring calibrator, Hart communicators Ametek pressure and Temperature calibrators.

Working with shut down activities like PM jobs calibration, Loop checking, control valve, overhauling & calibration and strock checking etc. Calibration of all types of field instruments such as transmitter, I/P converter, Thermocouple, RTD’s switches and control valves etc.

Challenged to supervise all instrument construction, loop checks and commissioning of plant and instructing construction activities at sites. Accountable for conducting loop checking and commissioning of new installations. Actively involved in calibration, installation and loop check coordination. Planning of all related shutdown activities.

My responsibility includes supervising, installation of instruments, inspection of work quality and mention conformity with project standard & specification.

Also worked on fire & gas system (Dragger, Atex, Sieger and Detronics) installation, Loop Checking, Pre-Commissioning, Commissioning with Hima & siemens PLC’s.

Works with H2S detectors, flame & fire detectors, smoke detectors, UV&IR sensors, fire alarm hooter & beacon indicator, heat detector, Co, CH4, O2 sensors & detectors, combustion gas detectors, hydro carbon detectors. Gas tester & gas alert monitors with recognized gas testing systems (SKG).

Declaration :