CURRICULUM VITAE
Name : BENSAFEDDINE
Last name : BELKACEM
Date and place of birth : 24/06/1973 in LAGHOUAT - ALGERIA
Adresse : Cité 176 Logs Oasis Nord LAGHOUAT
Nationality : Algerian
Marital status : maried with 2 children
Mobile : 06 58 95 20 00 / 07 73 43 67 16
Fax : 029 90 32 11
Mail : *.**********@*****.***
Professional experience
From 14/01/2000 TO 28/03/2001 : BECHTEL International / Ain Salah Gas Project/ Pipefitter, connection and pipefitting clamps of line 48
From 12/11/2001 TO 22/10/2003 : LEAD Contracting / SP4 Hassi R’mel project/ Pipefitter on ETO antifire system.
From 22/03/2004 TO 10/02/2007 : BECHTEL Algeria / Haoud El Hamra – Zouti HMD / Pipefitter, clamps pipefitter of line 24, 6 / Carbon and stainless steel prefabrication piping.
From 12/03/2007 TO 15/07/2008 : ECC / De-rigging / Akbou – ETO pumping station / Pipefitter, stainless steel.
From 05/08/2008 TO 04/02/2009 : INITEC / GTP / GTFT – Project Bousting / Pipefitter on the line of FR5 and BCL 405 compressors
From 15/02/2009 TO 16/05/2009 : GTP / PETROFAC / Ain Salah Gas (REG) / Pipefitter on the line of PGT 25 – 2xBCL 404 compressors.
25/05/2010 to 27/07/2010 : EMIPS / PETROFAC / Ain Salah (Krechba) / Piping team leader (Supervision of construction process lines)
Piping team leader supervision and commissioning, UTBS treatment unity HMD south
From 24/11/2010 to 21/07/2011 :( Supervision and construction of process lines) in EGPS / GE Energie / Tilghemt / HRM / Piping and turbine team leader.
Renovation of turbine instruments on the auxiliaries of MS9001E turbo generator
Installation of new BJ relative to revamping.
Renovation of piping air sealing of gas turbine.
Renovation of vibrations sensors on turbine levels.
Installation of flexible gas for the connection of manifold Gas combustion rooms.
Surfacing level of the body of the compressor discharge CDC.
From 04/12/2011to 21/07/2012 : EGPS / GE Energy / electric central of Tiaret / Piping and turbines team leader.
Renovation of turbine instruments on the auxiliaries of MS9001E turbo generator
Installation of new BJ relative to revamping.
Renovation of piping air sealing of gas turbine.
Renovation of vibrations sensors on turbine levels.
Installation of flexible gas for the connection of manifold Gas combustion rooms.
Surfacing level of the body of the compressor discharge
From 04/12/2012 to10/12/2012 : EGPS / BASIS / GE Oil and Gas / Djemaa SP1 Bis / Modification of air construction conducts for auto-cleaning filter system of two PGT10 machines.
From 02/03/2013to26/03/2013 : IRMA /METKA/Electric central of Tindouf project/reception of electric materials (center vaseuse-skada-Black star)
From 23/04/2013 to 28/02/2014 : IMS GROUP MAGHREB/ central of M’SILA, METKA owner working as piping supervisor, assuring the work of 12 gas turbines TM 2500,
- affect the power plant project M'SILA, client METKA serves as supervisor of mechanical and piping, provides mechanical work and piping for 12 gas turbines TM 2500
-installation 12 gas turbines TM 2500
-Flush the electrical and mechanical auxiliaries (Skid full and -GRS-center mechanical auxiliary vises- water) From 12 turbines TM 2500
-hydrostatic -Tested (cleaning with air-Teste-bursting bursting water with air)
-commissionning
-Dismantling 08 turbines TM 2500 (Skid-electric water-Skid fuel- GRS -center vises- electrical-mechanical-The Reserve lifted and auxiliary piping Auxiliary
-installation drainage 12 TM2500 turbines
- Cover the pipe channels
From 05/08/2014 to 05/10/2014: IRMA / assign to the central electric project Berakki Algiers owner GE Power AND WATER serves as Operator; provides start-up to 3 turbines TM 250
From 18/01/2015 to 08/03/2015 :IRMA/ assign to Central électrique from terga 3X400MW Ain Temouchent Algeria turbineKA26 combined Cycle; Mechanic /piping
1. Reassemble and disassemble the inlet blade valve of rotor and stator.
2. Good knowledge bolting machine like: ITH and Hi torque.
From 06/05/2015 to 09/06/2015: EGPS/assing to the pumping station has ZOTTI Hassi Messaoud (SONATRACH –AMERADAHESS) sonahess Mechanic repair a bridge roll
1-change the cable guide
2- Change the cable from the diamond grinding and lifting .
From 01/03/2016 to 10/04/2016: EGPS/assing to Central électrique from EL HAMMA
2 X280MW Algeria turbine AE94.3A1 Mechanic Hot section inspection
1.Reassemble and disassemble the inlet blade valve of rotor and stator.
2- Good knowledge bolting machine like: ITH
From 14/04/2016 to 22/04/2016: EGPS/assing to Central électrique from EL HAMMA
2 X280MW Algeria turbine AE94.3A1 Mechanic Hot section inspection
- response to a problem in the joint plane
From 10/07/2016 to 20/08/2016: Rotating machine /GE OIL ANS GAS / to the pumping station has MLN Hassi Messaoud mechanical turbine
-installation (change gas turbine 5002c to 5002 c power Cristal
From 19/09/2016 to 30/09/2016: TD service / GE OIL ANS GAS/ to the Hassi R’mel
Supervisor – Receptions Spare parts turbine 5002c – compressor
From 04/10/2016 to 15/11/2016: TD service / GE OIL ANS GAS/ to the Hassi R’mel
mechanical turbine MI (major inspection) turbine 5002 c
From 18/11/2016 to 30/112016: Granite international / GE Energie /to the koudiat
deraweche ( el kalla ) Algeria mechanical turbine HGPI turbine 9FB
From 01/12/2016 to 13/12/2016: Granite international / GE Energie /to the hajeret el
Nouss (Cherchel ) tepaza / Algeria mechanical turbine HGPI turbine 9FB
From 31/12/2016 to 15/01/2017 : Granite international/ GE Energie /to the Feriana
Tunisie mechanical turbine HGPI turbine 9FE
Language skillseraweche
Arab ic : Native.- French : very good - English : good
other
Good physical condition
Ready to work anywhere and everywhere.