Post Job Free
Sign in

Engineer Mechanical

Location:
Posted:
January 11, 2017

Contact this candidate

Resume:

BRIAN GOODERHAM

Nationality: British • Date of Birth: 19th March 1958 (58)

+44(0)776-***-**** • **************@*****.***

Senior Commissioning Engineer/Manager ~ Mechanical Completions Engineer/ Operations Specialist

An astute and result-driven Professional working to the highest possible safety standards, offering 30+ years of comprehensive experience spanning across the broad range of Onshore/ Offshore Project Management, Oil and Gas: Construction, Mechanical Completions, Precommissioning, Commissioning, Technical Writing, ISSOW, SIMOPS and Operations. A proven expert offering specialties in Crude Units, CTU, Delayed Coker’s, Thermal and Naphtha Cracking, Olefin Extraction, Compression, FCC, Power Generation, Utilities, Sulphur Recovery, Ethylene and LD Polyethylene, Remote Oilfield Oil/Gas Production, LNG, FPSO, Floating Production Systems (FPS), LPG Caverns and LPG terminals. Poised for the next level of success as a Senior Commissioning Engineer / Manager within a reputable organisation to meet the Highest Safety Standards possible and progress the Project Objectives in a Timely Manner.

~ Areas Of Expertise ~

HSE / ISSOW

Leadership (Especially in difficult circumstances/locations)

Decision Making

Start Up / Bring to Steady State Operation

SIMOPS

Technical Writing

Risk Management

Management of Change

N2/He Leak Testing

PreComms/ Commissioning

Flange Management

Pipelines

Chemical Cleaning

Project Management Team

Team Management

Problem Resolution

Construction

Mechanical Completions

Hydro Testing

Steam Blowing

Professional Experience

BP LNG SITE, Tangguh, PNG Indonesia

Project: LNG Train 3 Expansion Project

Site Controller (Permitting), July 2013-Feb 2016

Organisation and Implementation of all Permits to Work I.e. Hot Work, Cold Work, Breaking Containment, Confined Space Entry, Ground Disturbance and others on construction areas. Authorise all mandatory formal procedures in support of the PTW Individual Activities. Participation in Level 2 Risk Assessments (L2RA); working closely with and mentoring of Indonesian Nationals.

Successfully control CoW Activities in Construction ISSOW / Permit to Work Activities during “Early Works” i.e. Condensate and Diesel Tanks for eventual Construction of LNG Train 3.

Working to the highest standards of company HSE requirements and standards including strict adherence of Company Golden Rules. Synchronising SIMOPS activities with other construction and process areas.

AMEC OFFICE, LONDON UK.

Project: BP Clair Ridge Project

Commissioning Engineer / GoC MECHANICAL COMPLETIONS, Jan 2013-July 2013

Part of a team to produce and review procedures related to the Platform System

Precommissioning and Commissioning activities; Attending Hazop /Hazid/FAT’s.

SHELL GUMUSUT KAKAP FPS MALAYSIA.

System Commissioning And Mechanical Completions Engineer, Jan 2012 - Jul 2012

Part of a team to produce, Turn Over and Commissioning test packs ready for Precommissioning and Commissioning activities; participate in system punch outs and categorisations of punch items. Worked closely with mechanical completions tracking system also liaising closely with Vender Personnel.

Maintained the highest standards of Shell /MMHE HSE requirements and standards including strict adherence of Golden Rules and PTW / ISSOW Systems including L2RA and TBTs.

Following contractor in witnessing Construction, Precommissioning, Commissioning and, vessel inspection activities to ensure Client Completions and hand over criteria are met.

BP RUMAILLA OIL / GAS FACILITIES IRAQ.

Operations Advisor, Jul 2011-Jan 2012

Endeavouring to bring Operations Department up to BP Standards including ISSOW and CoW; SIMOPS activities with other construction/process areas also advised on all Commissioning/ Operations Activities on CPF and CPF Satellite Sites including TAR and Wellhead Sites.

PETROFAC SGP (SHETLAND GAS PLANT).

commissioning site start-up, mechanical completions, leader engineering phase UAE,

Jan 2011-Apr 2011

Lead of Multi Discipline (including ICAPS) Commissioning Team on the Engineering Phase. Preparation of the Precommissioning/ Commissioning/ Mechanical Completions TCP’s for the handover of a 500MMscfd Gas Plant First Gas mid-2014. Writing Operations Procedures. Ensuring all deliverables are executed on time by acting as a close liaison with the Client TOTAL.

BP LNG PROJECT- TANGGUH, PNG INDONESIA.

Start Up Commissioning Engineer / Mechanical Completions / Operations Issow

Nov 2007- Oct 2010

Construction, Precommissioning, Commissioning, Mechanical completions and Operation of LNG Plant including Pipelines / Utilities / Gas and Condensate Receiving Facilities / AGRU / Dehydration / Mercury Removal / Gas Liquefaction and Fractionation / Refrigerant Circuit / MR and PR Nuovo Pignone Compressors and Frame 7 Gas Turbines / Steam Turbine “Helper’s” and all associated equipment / HRSG / Storage and Loading / BOG

Designated as Deputy Site Controller for the Management of Permits to Work I.e. Hot Work, Cold Work, Breaking Containment, Ground Disturbance and others on full Area of LNG Site

HESS GAS PLANT – SURABAYA INDONESIA.

START UP AND MECHANICAL COMPLETIONS /COMMISSIONING AND OPERATIONS PLANT MANAGER

Mar 2006 –Oct 2007

Led an Ex Pat and National Team for the recruiting, organization, training and instigation of logistic requirements for a Gas Plant and Offshore Workforce. Including Operations, Maintenance, Laboratory and Support Departments.

Prepared and executed Pre and Post Operations Plan Onshore and Offshore including Mechanical Completions. Coordinated SIMOPS Activities with other Construction and Process Areas

Controlled Start Up Team and PMT to provide Operational Support for Phase 1 Flawless Start Up and Commissioning and Operations of the CPF (Including Buildings), Pipelines and Offshore Facilities after “Handover” from EPC Contractors to provide Gas for a local Power Station.

BP LPG PLANT – IN AMENAS PROJECT- ALGERIA.

Start Up Mechanical Completions / Commissioning-Coordinator

July 2005 – March 2006

Liaised very closely and gave support to pipeline vendors including writing tie in procedures and verifying Precommissioning and Commissioning procedures for Offsite locations. Ensured that works are adequately planned and resourced to support the work plans.

Engaged in the Mechanical Completions / checked system isolations to support Phased handovers to ensure that all isolations are marked, controlled and registered. Organised SIMOPS Activities with other Construction and Process Areas and Provided hands on experience for Operational Support during Start Up and progress to Steady State Operational Phase of CPF.

PTT EXPLORATION AND PRODUCTION – THAILAND.

HSE Specialist And Technical Writer, Nov 2004 – July 2005

Wrote and implemented HSE guidelines, policies and plans, for facility engineering, construction and projects departments for safety, security, health and environment (HSE) department.

Combined existing HSE Standing Instructions with PTTEP Overall Policies and Procedures to incorporate near future offshore Organisation and Operating Changes. Rewrote PTTEP HSE Management System Corporate “Standards” and Offshore Permit to Work System.

BP GAS PLANT –IN SALAH PROJECT- ALGERIA.

Mechanical Completions / Commissioning/ Completions Engineer

Nov 2003 – Oct 2004

Monitored Construction/ Precommissioning/ Mechanical Completions activities on CPF and pipelines to ensure all client procedures and guidelines are adhered to. Part of Operations Team during First Gas and Start up and eventual Steady State Operations on CPF. Coordinated SIMOPS activities with other construction and process areas.

BP LD POLYETHYLENE PLANT - PHILIPPINES.

BP Project Management Team Decommissioning Engineer

Apr 2003 – Nov 2003

Ensured safe shutdown of LD Polyethylene Plant followed by plant “make safe” procedures. Including all isolations and removal of hydrocarbons/ chemicals/ catalysts from site and instigating short term preservation plan. Wrote procedures for the jetty offloading of hydrocarbons and preservation of pipelines.

Career Note

SAIPEM / EXXON MOBIL EHRA FPSO PROJECT – PARIS

Senior Lead Mechanical Completions / Commissioning Engineer, Sep 2002 – Mar 2003

BP LNG PLANT VUNG TAU - VIETNAM

CPF Permit To Work Coordinator, Aug 2002 – Sep 2002

BP LNG / LPG TERMINAL NINGBO - CHINA

CPF Senior Commissioning/ Completions Engineer, Operations Mar 2002 – Aug 2002

ODL ZADCO ZIRKU ISLAND - UAE

Ops Engineer / Technical Writer, Nov 2001 – Mar 2002

OPTIMAL OLEFINS ETHYLENE PLANT MALAYSIA

Completions Engineer, May 1999 - Jan 2001

BP LD POLYETHYLENE PLANT, BATAAN - PHILIPPINES

CPF Operations Shift Commissioning Team Leader, May 1999 - Jan 2001

SERVOIL SERVICE COMPANY - TURKMENISTAN

Servoil Superintendent – Remote Oilfield Site, Feb 1998 - March 1999

CHEVROIL TENGIZ - KAZAKHSTAN

CPF Operations Representative / Consultant, May 1996 - Dec 1997

BECHTEL HABSHAN NGL PLANT – UAE

CPF Senior Operations Start-Up Supervisor, Oct.1995 - Feb 1996

BP LD POLYETHYLENE/ETHYLENE PLANT - MALAYSIA

CPF Senior Start-Up Operations Supervisor, Jan 1995 – Sep 1995

CHEVROIL - KAZAKHSTAN

Completions Engineer, April 1994 - Oct. 1994

CHEVROIL - KAZAKHSTAN

Pre-Commissioning and Start Up Operations Supervisor, Aug. 1993 - Apr 1994

CONOCO UK HUMBER REFINERY AND NORTH SEA- UK

Refinery and Offshore Senior Operations Supervisor, Jan 1979 – Aug 1993

Educational Background

City Guilds Certificate in Process Operations

GRIMBY COLLAGE OF FURTHER EDUCATION 1982

O Levels

WALTHAM TOLL BAR SCHOOL GRIMSBY 1974



Contact this candidate