Post Job Free

Resume

Sign in

Plant System

Location:
Ploiești, PH, Romania
Salary:
1000
Posted:
January 11, 2017

Contact this candidate

Resume:

CURRICULUM VITAE

Name: Popescu Cristian Dragos

Nationality & Date of Birth: Romanian, 17.12.1968

Basic Profession & Studies: Engineer, Oil & Gas University Ploiesti, Romania

Mobile: +40.722 878 311; +968-****-****; +968-****-**** (Oman)

E-mail: acx7xd@r.postjobfree.com

Professional Experience:

10 December 2016 – Present - Commissioning Supervisor

Petrofac – Petroleum Development Oman (PDO Oman, Rabab Harweel Integrated Project (RHIP)

21 August 2014 – 19 September 2015 – Process Commissioning Utilities Supervisor

Chevron – China, Gaoqiao Site, Wellhead and Gas Gathering Facilities

Detail out and write commissioning procedures and involved in precommissioning, commissioning for following system: Fresh Water System, Instrument and Plant Air System, Fire Water System, Nitrogen System, Fuel Gas System, Flare System, TEG Dehydration, Chemical Injection, Fresh Water System, Jacket Heater System.

Carryout precommissioning/commissioning and startup activities such as system walk downs, punch list prioritization, PTW, LOTO, implement commissioning procedures

Create/review/inspect of correct equipment installation/running and SAT/FTP of the plant

Involved in completion, closeout and handover of system with required signoff of PSSR and handover documentation, responsible with documented records of daily activities and daily status reporting

22 May 2011 – 30 December 2013 – Lead Commissioning Technician

Imtech Bolashak – Agip KCO, Kazakhstan, Karabatan Field, Onshore Process Plant, Kashagan EP, Eskene West, Sulphur and TGT Unit Tranch 1/ 2

Part of Imtech Bolashak Commissioning and Start up team for two Sulphur Recovery and TGT Units

Performed all steps as per pre-commissioning, commissioning and start up procedures:

Punch list, air blowing and steam blowing of pipe system, dry out Reaction Furnace and Incinerator, boil out for Condensers and steam drums, run test for pumps, compressors, air cooler; cleaning and internal inspection for columns and vessels; catalyst loading, leak test, N2 purging / Inerting.

1 September 2010 – 30 September 2010 - Precommissioning Supervisor

Urea Casale - Poland, Zaklady Azotowe - Pulawy, Urea Plant Revamping Project

Part of Urea Casale team involved as technical assistance for the client in all precommissioning activities

Performing all activities required as: punch list, water flushing and air blowing, steam blowing.

16 January 2010 – 22 April 2010 - Precommissioning Supervisor

Tecnicas Reunidas - KSA, Al Jubail, Saudi Kayan Petrochemical Facilities - Phenolics Facilities

Part of Tecnicas Reunidas Precommissioning team involved in precommissiong activities in plants as Phenol

& Cunene Unit

Performed all steps as per pre-commissioning procedure: punch list, water flushing and air blowing, reinstatement, leak test, catalyst loading, steam blowing.

5 April 2009 – 30 June 2009 – Commissioning Utilities Superintendent

Yemgas (M.W.Kellogg) - Yemen, Balhaf, LNG Plant

- 4 x 22, 4 MW Gas Turbines by GE; 3 x 50t/h Auxiliary Boiler by Bono Energia

- 3 x 37,1 t/h Desalination by Entropie;

Part of Yemgas team involved in commissioning activities in various area of the plant as:

Boilers, Gas Turbines, Desalination Unit, Air Compressor, Potable Water System, Fire Fighting System,

Fuel Gas Station, Effluent Water Treatment.

Before to start up of equipment, routine check to be carried out to ensure that all systems are ready

to be operate. The connected system should be lined up as Chemical Dosing System, Boiler Feed Water System

LP and Condensate System, Polish Water System

17 January 2008 – 1 March 2009 - Process Instructor OJT

Agip IEOC - Egypt, Petrobel, Abu Madi, NGL Plant

On the job training (OJT) for Agip KCO, involved in training, assessment process assisted at Petrobel, Abu Madi,

NGL Plant (LTS Unit, LPG Unit, El Qar’a Unit)

1 October 2006 – 30 December 2007 - Shift Supervisor

Sirte Oil Company (SOC) - Libya, Atthaddy Gas Plant

Shift activity coordination and supervision for Attahaddy Gas Plant, including Production Gas Separator, AGR Unit, Dehydration Unit, MEG Regeneration, Heating Medium Generation, Mercury Removal Unit and Propane Compressor (by Nouvo Pignone).

Coordinating the operation of the plants, shift activity coordination and supervision, ensuring start-up, normal operation, normal and emergency shutdown program, involved in overhauling activities preparing the static and rotating equipment within the plant for repairs and revision operations.

15 March 2005 – 1 August 2006 – Commissioning Panel Operator

Toshiba - U.A.E, Jebel Ali, Power Plant Phase No.1

- 3 x 184 MW Gas Turbines by GE

- 3 X 350 t/h (unfired), 3 X 720 t/h (With Duct Burner) HRSG by Dossan

- 2 X 165.95 MW Steam Turbines

- 2 x 550 t/h Auxiliary Boiler

Involving in Start-up, Commissioning & continuous operation in various areas of the plant such as: Boilers,

GasTurbine, SteamTurbines, Fuel Gas Station and Balance of Plant equipment

Before start-up of the equipments such as Auxiliary Boilers, Waste Heat Recovery Boilers,

Gas Turbine & Back Pressure Steam Turbines routine check to be carried out to ensure that all

Systems are ready to operate and the connected system must be lined up such as Feed Water, Make-up Water,

Close Cooling Water, Chemical Dosing System, HP, MP and LP steam.

Lube oil, cooling water, ventilation system for Steam Gas Turbine.

Performed all steps as per Pre-commissioning, Commissioning and Start-up team procedure:

Punch list; steam blowing for pipe system; equipment simulation test runs; functional test.

29 March 2004 – 29 October 2004 – Precommissioning Gas Process Plant Supervisor

Snamprogetti - KSA, Qatif North GOSP -1

Part of Snamprogetti Precommissioning team performed all steps as per pre-commissioning procedure:

Punch list, water flushing, air blowing and steam blowing for pipe system, chemical cleaning and degreasing,

equipment simulations runs, loop checking, functional test, tightness test, inerting

7 November 2003 – 7 February 2004 – Panel Operator (Shift Supervisor)

Sices Spa. - Egypt, Idku Gas Hub, MEG Recovery Unit

Part of Sices commissioning and Start-up team for two MEG Recovery Units shift activity coordination and supervision, ensuring start-up and normal operation.

11 May 2002 – 30 March 2003 – Commissioning Gas Process Plant Operator

Snamprogetti - Qatar, Mesaieed, NGL - 4 Project

Part of Snammpogetti Precommissioning, Commissioning and Start-up team.

Performed all steps as per pre-commissioning, commissioning and start-up procedure:

Punch list, flushing & blowing pipe system, commissioning static and dynamic equipments, commissioning utilities plant, leak test, heaters dry-out.

Follow procedures for Start-up and ensure performance test and handover.

31 May 2001 – 7 September 2001 – Commissioning Gas Process Plant Operator

Technip - U.A.E, Habshan, Onshore Gas Development (OGD - Phase 2)

Part of Technip Precommissioning, Commissioning and Start-up group for two Sulphur Recovery Units.

Performed all steps as per pre-commissioning, commissioning and start-up procedure:

Punch list, air blowing of pipe steam, steam blowing, dry out / boil out for Reaction Furnace and Condensers, catalyst loading, leaking test, N2 purging / Inerting.

Follow procedures for start-up and ensure performance test and handover.

25 July 1999 – 29 January 2001 – Commissioning Process Area Plant Supervisor

Snamprogetti - U.A.E, Ruwais - Refinery Expansion Project

Part of Snamprogetti Commissioning, Precommissioning and Start-up group for two Condensate Distillations and Naphtha Stabilizer Units, Kerosene Sweetening and LPG Sweetening and Dehydration Units.

Performed all steps as per: punch list, flushing and blowing pipe system, heaters dry-out, leak test, commissioning utilities plant, commissioning static and dynamic equipment.

Follow procedures for start-up: steam-out; gas-in, flushing oil and condensate-in and ensure performance test and handover.

1994 – 1999, Petrotel Lukoil Refinery - Shift Supervisor

Shift activity coordination and supervision for Crude and Vacuum Units, Naphtha Hydrotreater and UOP Semi-Regeneration Reformer

Coordinating the operation of the plants, ensuring start-up, normal operation, normal and emergency shutdown program

1993 – 1994 - Rompetrol R.A. Bucharest

Turkmenistan, Soviet - Abad site (NGL Plant), P&I Department

QA/QC specialist for pipe systems for isometrics, welding, stress releasing issued of Technical Documentation



Contact this candidate