REX R. ROBISO
Tel No. 925-***-****
Mobile No. +192*-***-****
Walnut Creek CA 94598
********@*****.***
Date of Birth ; April 3, 1972
PROFESSIONAL EXPERIENCES;
Plant Operator; Feb. 2016 to July 2016
PP 12 Power Plant Project
Riyadh, Saudi Arabia
Shanahan Engineering LTD.
Responsible for the operation of HRSG and Steam Turbine during the period of commissioning
Operation on the field.
Plant Operator Nov. 2014 to SEPTEMBER 2015
Yanbu II Power and Water Project
Shanahan Engineering LTD.
Responsible in the Field Operation, Start – up/ Shut-down of GE Steam Turbine.
Assist the start up of steam generator with an oil fired burner in field.
Start up the BOP equipment in the field.
Maintain daily log report on equipment running on the field.
Shift Charge Engineer : June 2012 to Dec. 2013
YTL Power Services Sdn Bhd, Malaysia
Secondment of Commissioning projects YTL Employment.
Shift Charge Engineer : June 2012 to Dec. 2013
Nyaganskaya – Russia
SSC5 – 4000F – 1S X 3
Start – up and shut down of Combined Cycle Power Plant.
Operating the plant during load operation.
Monitoring of plant condition.
Supporting the commissioning team during test and reliability run.
Mechanical Commissioning Engineer : Nov. 2011 to April 2012
HYUNDAI HEAVY INDUSTRIES CO. LTD
AL Dur Independent Water and Power Project ( IWPP )
Kingdom of Bahrain
Attend daily routine meeting for commissioning staff.
Review commissioning procedures, list of equipment to be commissioned.
Make actual inspection and preparation on the site for the mechanical equipment.
Inform; Client and Owner Side to witness the Commissioning of equipment.
Conduct checking of Vibration, Bearing Temperatures, Noise Level, Starting Current of Motors
for solo run test.
Responsible for preparation of Air Blowing of steam line.
Check and Collect Result of Testing Result in Control Room.
Responsible for preparation and water flushing of the condenser.
Responsible for commissioning of chemical dossing equipment of HRSG.
Involve on steam blowing and flushing of HRSG Units.
Responsible for mechanical commissioning of cooling towers.
Prepare for water line flushing of closed circuit system.
Assist the vendor for commissioning of duct burners and its auxiliaries.
Mechanical Commissioning Engineer : June 2010 to Aug. 2011
Societe Internationale de Dessalement (SIDEM) RAS LAFAN,QATAR
Prepare and review commissioning procedures.
Responsible for preparation of list of equipment’s to be commissioned.
Responsible for conducting testing on site such as;
Motor Solo Run Test
Checking Vibration, Bearing Temperature, Ambience Temperature, Noise Level.
Responsible for preparation of evaporator for Vacuum decay Test.
Perform functional testing in control room such as open and close loop of valves.
Involve in preparation of flushing the condensate system.
Mechanical Commissioning Engineer : April 2009 to May 2010
Societe Internationale de Dessalement (SIDEM) Jubail, Kingdom of Saudi Arabia
Prepare and review commissioning procedures.
Responsible for preparation of list of equipment’s to be commissioned.
Responsible for conducting testing on site such as;
Motor Solo Run Test
Checking Vibration, Bearing Temperature, Ambience Temperature, Noise Level.
Responsible for preparation of evaporator for Vacuum decay Test.
Perform functional testing in control room such as open and close loop of valves.
Involve in preparation of flushing the condensate system.
Prepare procedure and check outside the preparation of vacuum decay test of evaporator.
Conduct commissioning testing of chemical injection system of MED units.
Responsible for commissioning of Dump Condensers and its auxiliaries.
Prepare and assist for steam line air blowing.
Plant Operator : Oct. 2007 to June 2008
North American Energy Services
Chowchilla/ El Niddo Biomass Plant
California, USA
•Responsible for the support of Company Safety, environment and Quality policies and programs, and carrying out specific duties and responsibilities related to his job as spelled out in Management Systems Manual, Safety Manual and other related documents.
•Compliance with the Safety Management System and the Emergency response plan of the company.
•Applies process isolation under the direction of Area Authority and as per the standards procedure.
•Communicating observed operational problems to the Plant Manager.
•Initiating unit, train and emergency shutdown of process and utility system during abnormal operation, or as a result of an emergency situation on the installation.
Initiating appropriate action in the event of process and utility system alarms and trips.
Mechanical Commissioning Engineer May 2004 to Jan. 2006
Toshiba Corporation
Abu Dhabi, United Arab Emirates
Attend daily routine meeting for commissioning staff.
Review commissioning procedures, list of equipment to be commissioned.
Make actual inspection and preparation on the site for the mechanical equipment.
Inform; Client and Owner Side to witness the Commissioning of equipment.
Conduct checking of Vibration, Bearing Temperatures, Noise Level, Starting Current of Motors
for solo run test.
Responsible for preparation of Air Blowing of steam line.
Check and Collect Result of Testing Result in Control Room.
Responsible for preparation and water flushing of the condenser.
Responsible for commissioning of chemical dossing equipment of HRSG.
Mechanical Commissioning Engineer Nov. 2001 to April 2004
Babcock Borsig Power Energie
Taweelah A1 Power Plant ( 1,500 MEGAWATT, IWPP)
Abu Dhabi, United Arab Emirates
Responsible for planning, scheduling and tracking project time lines and miles stones using appropriate tools.
Defining project success criteria and disseminate them to involve parties throughout the project life cycle.
Developing best practices and tools for project execution and management.
Responsible for developing requirements documentation and technical representation.
Responsible for checking quality assurance, documentation, testing and inspection of equipment on site.
Mechanical Commissioning Engineer December 2000 to September 2001
Korea Heavy Industries & Const. Co.
Al Taweelah A2 Power & Desalination Plant(720 MEGAWATT)
Check commissioning procedures, permits, drawings for systems to be commissioned.
Make actual inspection on site and preparation for equipment be ready for commissioning.
Responsible for performing test in local side such as;
Motor Solo Run Test
Vibration Checking
Bearing Temperature ( NDE/ DE )
Noise Level
Responsible for doing testing in control room for function test of equipment together with the client.
Responsible for doing Vacuum Decay test of evaporator.
Perform air blowing for the steam line together with some commissioning staff.
Prepare and Line up the HRSG unit for Flushing.
Involve on steam blowing preparation of HRSG.
Control Room Operator April 1999 to October 2000
Hitachi Zosen Corporation
Al Khobar, K S A
•Monitors and coordinates the designated operation from Control Panel, ensuring safe and efficient operations. Includes maintaining continuous contact with various areas of the entire Plant to keep them informed of overall operating conditions.
•Communicates with the Local Operator of other areas to coordinate operations that may affect the operation and/or production of any unit within the Plant. Includes informing each other of changes and synchronizing activities to minimize loss of production.
Plant Operator May 1998 to March 1999
National Power Corporation
Manila, Philippines
Education:
Bachelor of Science in Mechanical Engineering
(Technological Institute of the Philippines) 1989 to 1998