Yeon-Jae Kim
RESUME
NAME : Yeon-Jae Kim
DATE OF BIRTH : Jun. 3, 1955
EDUCATION : B.Sc.(1978) in Mechanical Engineering
Sungkyunkwan University
Seoul, Korea
NATIONALITY : Korean
HOME ADDRESS : 15-1101, Namsan town Apartment, 32 Dasan-ro, Joong-Gu
Seoul, 04595, Korea
PHONE Home : +82-2-393-1204
Mobile : +82-10-528*-****
E-Mail : ********@*****.***
SUMMARY
2011.05- 2016.04 GS Engineering & Construction Corp.
Vice President, Engineering Director for Power Engineering
2008.06- 2011.04 Hanwha Engineering & Construction Corp.
Vice President, Chief Engineer, Engineering Manager for Power Engineering
2005.07- 2008.06 Korea District Heating Engineering Co. Ltd.
General Manager, Chief Engineer for Combined Heat & Power Engineering
2002.01- 2003.09 SK Engineering & Construction Co., Ltd.
General Manager, Lead System Engineer for Kwangyang CCPP Project
1990.08- 2000.10 SK Engineering & Construction Co., Ltd.
General Manager, Lead Mechanical Engineer for Power Engineering
1982 .12- 1990.07 HYUNDAI Engineering Co., Ltd.
Manager, Responsible Engineer for Power Engineering
1980.07- 1982.11 SAMSUNG Shipbuilding Co., Ltd.
Engineer, Responsible Engineer for Ship Building Engineering
Resume_YJKim(20160502).doc 1 of 12
Yeon-Jae Kim
DETAILED EXPERIENCE
2011.05- 2016.04 GS Engineering & Construction Corp.
2014.02- 2016.04 Engineering Director for Basic and Detail Engineering of KAIS Combined
Cycle Power Plant (2+2+1 x 2 Blocks) of Sonelgaz, Kais, Algeria.
Gas Turbine : 217 MW x 4 units (GE 9FA.03)
HRSG : Triple Pressure, Reheat x 4 units
HP : 280 t/h, 130 bar(a), 566 Deg. C
Reheat + IP : 299 t/h, 27.6 bar(a), 566 Deg. C
LP : 24.8 t/h, 6.0 bar(a), 288 Deg. C
Steam Turbine : 243 MW x 2 units (GE)
Air Cooled Condenser : 2 units
Note : 50% : 50% Joint Venture operation with DAELIM, Korea
2013.02- 2014.02 Engineering Director for proposal of Rabigh 5&7 Add-On Power Plant (GE
7EA 7+7+1 4 Blocks) of Saudi Electricity Company, Rabigh, Kingdom of Saudi
Arabia. (Failed)
2012.10- 2014.02 Engineering Director for proposal of Six(6) Combined Cycle Power Plants (GE
9FA 2+2+1 2 Blocks each) of Sonelgaz, Algeria. (Awarded)
2012.05- 2013.02 Engineering Director for Basic and Detail Engineering of PP-12 Combined
Cycle Power Plant (4+4+1 2 Blocks) of Saudi Electricity Company, Riyadh,
Kingdom of Saudi Arabia.
Gas Turbine : 170 MW x 8 units (GE 7FA)
HRSG : Triple Pressure, Reheat x 8 units (Alstom)
HP : 201 t/h, 147 bar(a), 568 Deg. C
Reheat + IP : 231 t/h, 33.6 bar(a), 565 Deg. C
LP : 16.6 t/h, 6.9 bar(a), 248 Deg. C
Steam Turbine : 345 MW x 2 units (Alstom)
Air Cooled Condenser : 2 units
Note : 1. EPC price was 2nd lowest but including performance, we were the
lowest.
2. Dispatched to IDOM, Spain for Engineering (2012. 06. ~ 2012. 09)
3. 50% : 50% Joint Venture operation with Arabian Bemco, KSA
2011.05- 2012.04 Engineering Director for proposal of PP-12 Combined Cycle Power Plant (GE
7FA 4+4+1 2 Blocks) of Saudi Electricity Company, Riyadh, Kingdom of Saudi
Arabia. (Awarded)
2011.05- 2011.09 Engineering Director for proposal of Shoaiba II Combined Cycle Power Plant
(GE 7EA 5+5+1 2 Blocks) of Saudi Electricity Company, Shoaiba, Kingdom of
Saudi Arabia. (Failed)
Resume_YJKim(20160502).doc 2 of 12
Yeon-Jae Kim
2008.06- 2011.04 Hanwha Engineering & Construction Corp.
2009.08- 2011.04 Engineering Manager for Marafiq STG units 5 & 6 Project of Marafiq in Yanbu,
Kingdom of Saudi Arabia
Oil Boiler : 167 Bar(a) x 541 Deg. C x 888 t/h x 2 units
Steam Turbine : 275 MW x 2 units
Electrostatic Precipitator 2 units
Seawater Flue Gas Desulfurization System 2 units
Demineralized water plant
Fuel oil supply system
Note : 1. The winning strategy suggested by myself during proposal stage was
the key point. I and my team have received prizes and rewards from
the group chairman Mr. Seong-Yeon Kim.
2. PMC for Owner: JACOBS Engineering, USA
Engineering Company: The Kuljian Corporation, USA
3. During the Basic Design period (Sep. 23 2009 ~ Apr. 2, 2010), I have
dispatched to The Kuljian Corporation office with 5 engineers at the
beginning and 11 engineers at peak time.
2008.08- 2011.04 Chief Engineer of Power Engineering Team
Supervision of engineering work for various power projects and proposals
2008.06- 2009.07 Supervising Engineer for Kwang-Myung CES Plant of Samchully Co. Ltd.,
Korea.
Gas Turbine : 17.3 MW x 2 units (Kawasaki L20A)
HRSG : Dual Pressure x 2 units
Steam Turbine : 11.4 MW x 1 unit
District Heating : 42.3 Gcal/h
Electricity : 46 MW
2008.06- 2009.07 Engineering Manager for Maaden PDP Project of Maaden Phosphate
Company in Al-Khobar, Kingdom of Saudi Arabia
Steam Turbine : 75 MW x 2 units
Aux. Boiler : 65 bar(a) x 482 deg.C x 150 t/h x 1 unit
Desalination Plant : MED type, 13,400 m3/d x 4 units
2005.07- 2008.06 Korea District Heating Engineering Co. Ltd.
2008.01- 2008.06 Project Manager for Basic Engineering of Sindorim D-Cube City CES Plant of
DAESUNG COGEN, Korea
Gas Engine : 3 MW x 4 units
Resume_YJKim(20160502).doc 3 of 12
Yeon-Jae Kim
WHRB : 4 units
Boiler : 4 units
Chiller : 5 units
District Heating : 23 Gcal/h
Electricity : 12 MW
2007.12- 2008.06 Project Manager for Basic and Detail Engineering of Daejeon Hakha CES Plant
of Chungnam City Gas Co., Ltd., Korea
Gas Turbine : 15 MW x 2 units
HRSG : Dual Pressure x 2 units
Steam Turbine : 7 MW x 1 unit
District Heating : 113 Gcal/h
Electricity : 37 MW
2007.11- 2008.06 Project Manager for Basic Engineering of Homaesil CES Plant of HUCES Co.,
Ltd., Korea
Gas Turbine : 24 MW x 2 units
HRSG : Dual Pressure x 2 units
Steam Turbine : 14 MW x 1 unit
District Heating : 320 Gcal/h
Electricity : 62 MW
2007.07-2007.10 Lead Mechanical Engineer for Basic Engineering of Sangam2 CES Plant of
Korea District Heating Corporation, Korea
Duel Fuel Engine : 3000 kW x 2 units
Waste Heat Boiler : 20 t/h x 2 units
Chilled Water/Hot Water Supply System
2007.01- 2007.10 Lead Mechanical Engineer for Basic Engineering of Gwangju Suwan Combined
Heat & Power Plant of Suwan Energy Ltd., Korea
Gas Turbine : 45 MW x 2 units (Siemens SGT-800)
HRSG : Dual Pressure x 2 units
HP : 60 t/h, 75 kg/cm2(a), 514 Deg. C
LP : 10 t/h, 7 kg/cm2(a), 230 Deg. C
Steam Turbine : 40 MW x 1 unit
District Heating : 185 Gcal/h
2007.01-2007.10 Chief Engineer of CHP Engineering Team #2
Supervision of various power projects and proposals.
2005.09- 2006.12 Lead Mechanical Engineer for Basic Engineering of Pangyo Combined Heat &
Power Plant of Korea District Heating Corporation, Korea
Gas Turbine : 120 MW x 1 unit (Siemens W501D5A)
HRSG : Dual Pressure x 1 unit
Resume_YJKim(20160502).doc 4 of 12
Yeon-Jae Kim
HP : 164 t/h, 72 kg/cm2(a), 514 Deg. C
LP : 46 t/h, 6.14 kg/cm2(a), 230 Deg. C
Steam Turbine : 39.3 MW x 1 unit
District Heating : 135.5 Gcal/h
Responsible for
Preparation of Study Reports
Preparation of Design Criteria
Preparation of System Description
Review of Heat Balance Diagram prepared by EKONO
P & I Diagram Development
Review & Comment on General Arrangement Drawings
Preparation of ITB
Preparation of Bid Evaluation Criteria
2005.07- 2005.12 Responsible Mechanical Engineer for Supervision of Detail Engineering of
Hwaseong Combined Heat & Power Plant of Korea District Heating
Corporation, Korea
Gas Turbine : 190 MW x 2 units (Mitsubishi M501F)
HRSG : Triple Pressure, Reheat x 2 units
HP : 208.5 t/h, 133.1 kg/cm2(a), 529.8 Deg. C
Reheat + IP : 241.1 t/h, 28.9 kg/cm2(a), 557.8 Deg. C
LP : 19.7 t/h, 6.5 kg/cm2(a), 236.5 Deg. C
Steam Turbine : 197.9 MW x 1 unit (Mitsubishi)
District Heating : 360 Gcal/h
Responsible for
Review and Comment on Heat Balance Diagram
Review and Comment on P & I Diagram
Review and Comment on Equipment sizing calculation sheet
2004.11- 2005.06 TOYO Engineering Korea Ltd.
2005.02- 2005.06 Responsible Mechanical Engineer for Front End Engineering & Design of BPA
and PC Plant of KAZANORGSINTEZ, Kazan, Republic of Tatarstan, Russia
(02.17~05.28: Dispatched to Toyo Engineering Corp. in Japan for co-work)
BPA Plant : 70,000 t/y
PC Plant : 65,000 t/y
Responsible for Equipment Specification, Requisition, Evaluation and Vendor
Print Review of rotating machinery
2004.11- 2005.02 Responsible Mechanical Engineer for Basic and Detail Engineering of Photo
Mask Plant for HOYA Electronics Korea Limited, Hyunkok, Korea
Responsible for Requisition, Evaluation and Vendor Print Review of
Resume_YJKim(20160502).doc 5 of 12
Yeon-Jae Kim
Ultra Pure Water supply system
Waste Water Treatment System
Dry Air Supply System
H2SO4, H2O2 Supply system
Utility Boiler
2004.08- 2004.11 SAMSUNG Corporation (Engineering & Construction)
2004.08- 2004.11 Responsible Mechanical Engineer for Basic and Detail Engineering for proposal
of Hwaseong Combined Heat & Power Plant of Korea District Heating
Corporation, Korea (Not submitted)
Gas Turbine : 173 MW x 2 units (ALSTOM GT24)
HRSG : Triple Pressure, Reheat x 2 units
HP : 235.87 t/h, 139.3 kg/cm2(a), 555.6 Deg. C
Reheat + IP : 256.72 t/h, 28.94 kg/cm2(a), 498.8 Deg. C
LP : 9.65 t/h, 5.942 kg/cm2(a), 288.9 Deg. C
Steam Turbine : 203 MW x 1 unit (ALSTOM)
District Heating : 360 Gcal/h
Responsible for
ITB Review
Review and Comment on Heat Balance Diagram
P & ID Development
Requisition & Evaluation of HRSG, Condenser, Deaerator,
DH Heater, Tube Cleaning System and Vacuum pumps
Review & Comment on General Arrangement Drawings
Preparation of Proposal Document
2002.01- 2003.09 SK Engineering & Construction Co., Ltd.
2002.01- 2003.09 Lead System Engineer for Basic and Detail Engineering of Kwangyang
Combined Cycle Power Plant of SK Power Co., Ltd., Kwangyang, Korea
Gas Turbine : 170 MW x 4 units (GE 7FA)
HRSG : Triple Pressure, Reheat x 4 units (N/E)
HP : 185.45 t/h, 132.5 kg/cm2(a), 566.6 Deg. C
Reheat + IP : 217.65 t/h, 25 kg/cm2(a), 566.6 Deg. C
LP : 19 t/h, 7 kg/cm2(a), 321.2 Deg. C
Steam Turbine : 200.9 MW x 2 units (MHI)
Responsible for
Design Criteria
System Description
Heat Balance Diagram
Water Balance Diagram
Resume_YJKim(20160502).doc 6 of 12
Yeon-Jae Kim
P & ID
Supervising of Steam Turbine/Generator Package
Performance Guarantee
Plant Start-up Procedure
1990.08- 2000.10 SK Engineering & Construction Co., Ltd.
1999.11- 2000.10 Lead Mechanical Engineer for Proposal of a Diesel Power Plant for Union
Fenosa (Spain) at Tema, Ghana. (Failed)
Duel Fuel Engine : 2000 kW x 4 units
Waste Heat Boiler : 25 t/h x 4 units
1999.07- 1999.12 Lead Mechanical Engineer for Proposal of a Combined Cycle Power Plant of
NPC Power Expansion Project for National Petrochemical Public Company
Limited, Rayong, Thailand. (Failed)
Gas Turbine : 37.017 MW x 2 units(GE 6561B)
HRSG : Dual Pressure x 2 units
HP : 65.7 t/h, 71.8 kg/cm2(a), 517 Deg. C
LP : 13.4 t/h, 5.1 kg/cm2(a), 209 Deg. C
Steam Turbine : 41.195 MW x 1 unit
1998.09- 1999.06 Lead Mechanical Engineer for Proposal of a Combined Cycle Power Plant for
Ghana Industries Power Project of KMR Power Corporation (USA), Tema,
Ghana. (Awarded but project itself has been canceled)
Gas Turbine : 141.465 MW x 1 unit (Siemens V94.2)
HRSG : Dual Pressure x 1 unit
HP : 237.37 t/h, 81.46 bar(a), 534.7 Deg. C
LP : 20.185 t/h, 5.94 bar(a), 233.6 Deg. C
Steam Turbine : 80.955 MW x 1 unit
Note : The plant was supposed to supply electricity to a Gold Mine and the
main fuel was light crude oil. But at that time crude oil price had
increased rapidly to more than double, and the gold price had been
decreased sharply. That made the Power Plant not feasible.
1998.01- 1998.08 Lead Mechanical Engineer for Proposal of Sulfur Handling Expansion Phase II
for Abu Dhabi National Oil Company, UAE. (Awarded)
Capacity Expansion from 4250 TPD to 7650 TPD
Processing liquid sulfur to granule
Handling sulfur granule up to ship loading
1997.02- 1997.12 Lead Mechanical Engineer for Proposal of a Combined Cycle Power Plant of
Daegu IPP Project, Daegu, Korea (Awarded but delayed due to an economic
crisis in Korea. In 2002, the project has been restarted with location change to
Resume_YJKim(20160502).doc 7 of 12
Yeon-Jae Kim
Kwangyang.)
Gas Turbine : 177.65 MW x 4 units (GE 7FA)
HRSG : Triple Pressure, Reheat x 4 units (Hanjung)
HP : 183.8 t/h, 133.8 kg/cm2(a), 567.7 Deg. C
Reheat : 214.2 t/h, 25 kg/cm2(a), 566.5 Deg. C
IP : 37.2 t/h, 28 kg/cm2(a), 329.8 Deg. C
LP : 19 t/h, 4.83 kg/cm2(a), 275 Deg. C
Steam Turbine : 193.68 MW x 2 units (GE)
1996.12- 1998.09 Mechanical Supervising Engineer for Detail Engineering of Ilwon Total Energy
Supply System, Seoul, Korea
Main Steam : Form Ilwon MSW Incineration Plant
Aux. Boiler : 11 kg/cm2(a), 183.2 Deg. C, 200 t/h x 2 units
Steam Turbine : 13.3 MW x 1 unit
District Heating
System : 240 Gcal/h
1996.02- 1996.12 Lead Mechanical Engineer for Proposal of a Conversion Project of Existing
Simple Cycle Power Plant to a Combined Cycle Power Plant for Takoradi
Power Plant, Takoradi, Ghana (Failed)
HRSG : 82.4 Bar(a) x 502 Deg. C x 188t/h x 2 units
(for GE9171E)
Steam Turbine : 112 MW x 1 unit
Note : The client had selected General Electric as a successful bidder though
SKEC had been recommended by the consultant engineer (Ewbank
Preece, U.K.) both in technical and commercial wise. It was understood
that the Volta River Authority (Ghana government) made a political
decision because G.E. had supplied combustion turbine/generator and
executing construction work at that time.
1994.11- 1996.11 Lead Mechanical Engineer for Basic and Detail Engineering of Tema Oil
Refinery (TOR) Revamping Project, Tema, Ghana
Capacity Upgrading : Form 28,000 to 45,000 BPSD
1993.10- 1996.05 Lead Mechanical Engineer for Basic and Detail Engineering of Nowon Co-
Generation Plant, Seoul, Korea
Power Boiler : 41 kg/cm2(a), 400 Deg. C, 150 t/h x 1 unit
Aux. Boiler : 13 kg/cm2(a), 190.7 Deg. C, 150 t/h x 4 units
Steam Turbine : 37 MW x 1 unit
District Heating
System : 390 Gcal/h
1994.10- 1995.03 Lead Mechanical Engineer for Proposal of a Combined Cycle Power Plant for
Resume_YJKim(20160502).doc 8 of 12
Yeon-Jae Kim
Thai Co-Generation Company, Reyong, Thailand (Failed)
Gas Turbine : 35 MW x 3 units(GE Frame 6)
HRSG : Dual Pressure x 3 units
HP : 55.7 Bar(a), 427 Deg. C, 64 t/h
LP : 21 Bar(a), 252 Deg. C, 45.6 t/h
Steam Turbine : 49.7 MW x 1 unit
1994.02- 1994.10 Lead Mechanical Engineer for Proposal of a Coal Fired Power Plant for TNB,
Malaysia (Failed)
Coal Boiler : 174 Bar(a) x 541 Deg. C x 1656 t/h x 2 units
Steam Turbine : 500 MW x 2 units
1993.01- 1994.01 Lead Mechanical Engineer for Proposal for Conversion Project of Existing
Simple Cycle Power Plants for Paka Power Plant and Pasir-Gudang Power Plant
for TNB, Malaysia (Failed)
HRSG : 80 Bar(a) x 510 Deg. C x 165 t/h x 2 units Per
Site (for GE Frame 9E)
Steam Turbine : 85 MW x 1 unit Per Site
1993.01- 1995.10 Lead Mechanical Engineer for Basic and Detail Engineering of Mokdong MSW
Incineration Plant, Seoul, Korea
Refuse Incinerator : 200 t/day x 2 units
Waste Heat Boiler : 15 kg/cm2(a) x 197 Deg. C x 26 t/h x 2 units
Steam Turbine : 4.5 MW x 1 unit
Flue Gas Treatment System
1990.08-1992.12 Mechanical Responsible Engineer for Detail Engineering for Urethane Plant of
Hanyang-BASF Urethane Ltd., Yeochon, Korea
Responsible for Requisition, Bid evaluation and Vendor print review of
Air Compressor package
Gas Compressor package
Refrigerator package
1982 .12- 1990.07 HYUNDAI Engineering Co., Ltd.
1989.07- 1990.07 Mechanical Responsible Engineer for Basic and Detail Engineering of Cibinong
Cement Plant, Cibinong, Indonesia
Capacity : Portland Cement 4,600 MTPD x 1 Line
Responsible for
Resume_YJKim(20160502).doc 9 of 12
Yeon-Jae Kim
Flow Diagram
Equipment sizing
Requisition, Bid evaluation and Vendor print review for Crusher, Ball
mill and Rotary kiln
1989.04- 1989.06 Mechanical Responsible Engineer for Proposal of Daegu Municipal Solid Waste
Incineration Plant, Daegu, Korea (Failed)
Refuse Incinerator : 300 t/day x 2 units
Waste Heat Boiler : 15 kg/cm2(a) x 200 Deg. C x 38 t/h x 2 units
Steam Turbine : 6 MW x 1 unit
Flue Gas Treatment System
1988.10- 1989.03 Responsible Engineer for Feasibility Study of New Co-Generation Power Plant
for Daegu Dyeing Complex, Daegu, Korea
Boiler : 93 kg/cm2(a) x 485 Deg. C x 372 t/h x 1 unit
Steam Turbine : 50 MW x 1 unit (Back Press. 9 kg/cm2(a))
Utility Steam Supply System
Responsible for
Heat Balance Calculation
Steam and electricity Load analysis
Planning Energy production & distribution
Note : For the execution of above job, I have developed a Computer Program
which include Heat Balance calculation function to decide Boiler Load
and steam by-pass flow depending on the required steam and electricity
load of the Dying Complex. The program also has a function to plan
energy production and distribution at parallel operation modes with the
existing Co-Generation Power Plant.
1987.09-1988.12 Lead Mechanical Engineer for Basic and Detail Engineering Including
Feasibility Study of Diesel Engine Co-Generation Plant for Hotel
Intercontinental Seoul, Korea
Duel Fuel Engine : 2000 kW x 2 units
Waste Heat Boiler : 25 t/h x 1 unit
Chilled Water/Hot Water Supply System
1986.09- 1987.12 Project Engineer for educational equipment (Lathe 28 Sets) procurement and
supply for Bangladesh Technical Education Project of International Labor
Office
1982.12- 1986.12 Mechanical Responsible Engineer for Basic and Detail Engineering of Misurata
Power and Desalination Plant, Misurata, Libya
Oil/Gas Boiler : 90 Bar(a) x 510 Deg. C x 317 t/h x 6 units
Steam Turbine : 84.65 MW x 6 units
Resume_YJKim(20160502).doc 10 of 12
Yeon-Jae Kim
Gas Turbine : 12 MW x 1 unit
Desalination Plant : 10,500 MTPD x 3 units
Responsible for
P & ID Development for Steam Turbine system, Main steam By-pass
system and Auxiliary steam system
Equipment Sizing
Vendor print review for Steam Turbine/ Generator with related
equipment
O & M Manuals
Operator Training
1980.07- 1982.11 SAMSUNG Shipbuilding Co., Ltd.
1980.07- 1982.11 Mechanical Responsible Engineer for Basic and Detail Engineering of Cargo
Handling System, Ventilation System, Anchor Handling/Mooring System and
Steering System for various Cargo Ships
Ship No. 1005/06 : 4,000 HP Pusher/5,000 DWT Barge
Ship No. 1014/15 : 34,000 DWT Chemical Carrier
Ship No. 1016/17 : 60,000 DWT Bulk Carrier
Ship No. 1018 : 60,000 DWT Bulk Carrier
Ship No. 1021/22 : 38,000 DWT Semi-Submergible Deck
Cargo/Chemical Carrier
Ship No. 1023/24 : 34,000 DWT Ref. Container Carrier
Responsible for
System Design
Equipment Sizing
Requisition, Bid evaluation and Vendor print review
O & M Manuals
Inspection and Test Procedure
Trial Run...