PARTHIBAN CHINNATHAMBI
****, **** ***, *** #*** Certified Six Sigma Green Belt- Industrial Engineer Mobile: 313-***-****
Detroit, MI- 48201 ******.****@*****.***
https://www.linkedin.com/in/parthiban-chinnathambi
SUMMARY
Pursuing Masters in Industrial Engineering.
2 years’ experience as Manufacturing and Quality Engineer in Pump Manufacturing industry.
Internship experience in an automotive assembly plant (TCF) - FORD.
Certified Six Sigma Green Belt.
Expertise in the problem-solving using six sigma DMAIC methodology.
Experienced in Lean and quality.
Experienced in CAD - Pro Engineering, CATIA V5.
EDUCATION
Master of Industrial Engineering, GPA: 3.83/4
Wayne State University, Michigan Aug 2015 – May 2017
Bachelor of Production Engineering, GPA: 8.36/10
PSG College of Technology, India. Aug 2010 – May 2015
SOFTWARE SKILLS
APPLICATION SKILL: Minitab, MS Office (Word, Excel- V look Ups/ Data Analysis, PowerPoint), MRP.
SIMULATION SKILLS: Pro- Engineering, CATIA V5, Ansys.
TECHNICAL SKILLS
Lean Tools (5S, Root cause analysis, Poke yoke, PDCA)
Quality tools (5 why, Control charts, FMEA, Pareto Chart)
Product design, Facility Development (Jig).
Statistical Process Control, MSA, MRP.
PROFESSIONAL EXPERIENCE
Quality and Manufacturing Engineer, Trainee. 2 YEARS
PSG Industrial Institute, India. Sep’13 – May’15
Underwent industrial training in Quality and Manufacturing systems engineering.
Exposed to Geometric dimension and Tolerance (GD&T).
Exposed to PFMEA, JSV (Job Setup Verification) and Control plans.
Trained in using quality inspection tools like gauges, dial indicator, calipers, micrometer, in process inspection, control charts.
Generated weekly rejection/scrap report of the pump casting, performed root cause analysis and presented to material review board.
Actively participated in problem solving teams and developed corrective actions for customer non- conformance.
Possess hands-on Experience in various machine tools such as Turning, Drilling, milling, finishing, Subtractive Rapid Prototyping.
Implemented lean tools including 5S, Wastage identification and Poka- Yoke.
Lead daily Gemba- walks to identify lean waste on daily basis.
Worked in a Cross Functional Team member involved in Identifying Root-cause using 5Why, Fishbone Analysis for Customer/internal concern.
Developed, and implemented new JIG (production tool) design using CATIA for pump manufacturing line.
Performed work instruction for the designed tools for easy understanding.
Trained in Modelling, Drawing creation.
Analyzed potential unsafe factors in major job shops and composed appropriate safety checklist which could effectively avoid the occurrence of accidents.
Industrial Engineer, Intern 3 MONTHS
Ford India Private Ltd, India. May’13 – Jul’13
Worked towards improving material flow to avoid assembly line stopping.
Collected cycle time data and identified bottlenecks along the assembly line.
Performed Root-cause analysis and identified the problem that contributed towards irregular material flow and long cycle time.
Generated Pareto chart to identify major problems so that resources can be focused to alleviate the problems.
Reduced line stop from 7 minutes to 2 minutes as a result of combined effort.
Designed Trolley for critical parts using CATIA.
Gained knowledge of 8D.
PROJECTS:
Six sigma project (DMAIC)
Implemented Six Sigma methodology of DMAIC to improve the machining process to reduce the rejection rate of pump casings.
Reduced defect rate from 25.27% to 2.158%.
Production Systems Project on MRP DSS
Forecasted the demand to create Master Production Schedule using regression analysis and linked it to MRP worksheet using VLOOKUP.
Determined the maximum net profit with minimized inventory cost using the MRP DSS tool.
Design and Development of Bookshelf
Developed sketches, four best concept were chosen and modelled using CATIA.
Two best concept were chosen based on Pugh chart, QFD, FMEA, Structural analysis (ANSYS) and developed Scaled prototype.
Design of JIG for Submersible Motor Base.
Studied the process and problem identified in manual machining of Submersible motor base.
Modelled JIG for the motor base using CATIA and manufactured the modelled JIG.
COURSEWORK
Deterministic Optimization
Applied Engineering Statistics
Production System
Fundamentals of Six Sigma
Project management
Lean Manufacturing
Metrology and Quality Control
Production and operation Management
Supply Chain Management
Product Development strategy