Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Pakistan
Posted:
January 10, 2017

Contact this candidate

Resume:

MOHAMMAD JAVED AKHTAR

House # *** street # ** safari

Villas bahria Town, Lahore.

CURRICULUM VITAE

Object: To Seek Challenging Carrier as a Control Room operator

Offers 20 years+ of commissioning/start up and operation of power plants. A self starter with excellent technical know how, leadership and interpersonal skills. Highly motivated and always strive for excellence with beat the schedule attitude.

Father's Name: Barkat Ali.

Date of Birth: 18th Jan 1971.

Nationality: Pakistani.

Religion: Islam.

N.I.C No.: 31303-2732779-3

Passport No.: DK1347791

Martial Status: Married

Contact Tel. No: +920**********, +92-300-*******

e-mail acx69u@r.postjobfree.com / acx69u@r.postjobfree.com

Education

Diploma of Associate Engineer in Electrical Technology from Punjab Board of Technical Lahore, Pakistan in 1991.

Associated Member of Institute of Engineer Lahore, Pakistan.

Pass certificate of English language course from National Institute of Modern Language Islamabad Pakistan (Lahore campus)

Computer: Well known about MS office and other software’s.

Trainings:

.

ECMS training from Hanwa (Korea) at Marafiq training center Yanbu (KSA).

3 weeks DCS training from YOKOGAWA (Japan) on Mark 6E at Yokogawa training center Yanbu (KSA).

3 weeks DCS training from YOKOGAWA (Japan) on Centum VP Yokogawa from Yokogawa training center Yanbu (KSA).

FGD training from Gec Alstom at Marafiq training center Yanbu (KSA).

SCR training from Gec Alstom at Marafiq training center Yanbu (KSA).

Four weeks training on BTG + Utilities operation from B&W at Saba Power Plant, Shaikhupura, Pakistan.

Two weeks training on DCS Bailey Infi 90 with Symphony from DESCON at Saba Power Plant, Shaikhupura, Pakistan

Safety and work permit & first aid orientation / training from Hasseb Habib group at Saba Power Plant.

02 week training of switch gears & switch yard from Wapda engineering academy Fad, Pakistan.

Work Shop on Energy efficiency in Steam Distribution System at Muzaffar Garh, Pakistan

Safety and work permit orientation for supervisory training at AES Lal Pir and AES Pak Gen Power Project from Nichimen safety department.

Six months Steam turbine operator training from Chinese Engineers at 210 MW unit T.P.S. Muzaffar Garh.

Six weeks simulator (210MW) training at T.P.S. Muzffar Garh.

Three-month basic operator course training from Natural Gas Power Station, Multan.

Experience

Feb 2015 to date

Worked as Shift Supervisor with Orient Operating Ltd. (Former ELPASO Technology & COSTAL technology) Pakistan at SABA POWER PLANT Sheikhupura, Pakistan.

September 10, 2011 to 02 Feb,2015

Working as Control room operator with Marafiq at 1300 MW complex in Yanbu KSA involve in commissioning /start up of the new 2 x 275 MW Oil Fired Steam Power plant. Responsible in review of pre-commissioning and commissioning procedures and witnessing of Boiler and Turbine and its Auxiliaries and Ancillaries commissioning activities. Including but not limited to flushing, motor solo run test, equipment initial run, Chemical Cleaning/Preservation, Boiler Initial Firing, Steam Blowing, Vacuum Pulling, Initial Turbine Rolling, Synchronization, Load Test, Reliability Test and Plant Performance and Commercial Operation. Knowledgeable in QMS execution, CEMS monitoring and Safety implementation during plant operation such as PTW and LOTTO.

Dec 98 to til1 September.2011

Worked as Shift Supervisor with Orient Operating Ltd. (Former ELPASO Technology & COSTAL technology) Pakistan at SABA POWER PLANT Sheikhupura, Punjab, Pakistan, which consists 134 MW TOSHIBA steam turbine and BWI boiler of 410 t/h capacity, 132 KV switch yard by Siemens, DCS control system by Elsag Bailey Infi 90 with Symphony, ESP (electro static precipitator), BOP consists of water treatment plant (demineralization plant by ECODINE), waist water system, fuel additive system, fuel station, turbine auxiliaries with its control system and cooling towers

I deeply involved in commissioning, pre-commissioning, start-up activities and COD with BWI (EPC contractor).

oResponsibilities:

Co-ordinate with Operation Manager to run the plant, operation & maintenance in safe and efficient manner both normal and emergency situation.

Plant Startup / Shutdown activities as per standard operation procedure.

Fully responsible to take corrective measure during emergency situation.

To maintain chorological log book.

Involve to prepared or revised SOP (Standard Operation Procedure).

LOTO (Lock out & Tag out) the system for safe maintenance operation.

To take plant data and evaluation the parameters for improve plant efficiency.

Prepared daily reports, like plant heat rate & efficiency.

Maintain and keep the technical & administrative record.

Strictly follow the safety roles and regulation for self & plant safety.

Keep the close watch, “System behavior” and took corrective measures to run the plant on efficient manner.

August 05, 97 to APRIL 98

Worked with ANSALDO ENERGIA as a Plant Operator (Operation) at their site Liberty Power Plant 225 MW Combined Cycle Power Project Mir Pure Mathelo Sind, Pakistan.

Responsibilities:

Commissioning activities of units

(Mechanical side) 150 MW Gas Turbine Frame 9 type V94.2 manufactured by Ansaldo Energia Italy, DCS control System by Bailey Infi 90,, H.R.S.G. Boiler & auxiliary, Steam Turbine 75 MW and Auxiliary, Demin Water Plant, Fire Fighting System.

(Electrical side) Look after the electrical system 380 V, 6.6 kV, 132 kV breakers protection battery system, UPS system, weekly test run of emergency diesel generator (500 KV A), weekly test run of black start diesel generator capacity 2500 KV A /6.3 KV.

March 05, 97 to July 31, 97

Worked as a Commissioning CCR Operator with Nichimen Corporation (Mitsubishi Heavy Industries, Japan) at their site AES Lal Pir & AES Pak Gen 2x362 MW Power Plant Project, near Mehmood Kot, Tehsil Kat Addu, Dist. Muzaffargarh, Punjab.

April 95 to March 97

Worked as a Sub Engineer Operation with WAPDA at WAPDA 1370 MW Thermal Power Station (TPS) Muzaffargarh, Punjab.

April 94 to March 95

Completed the job as a Commissioning Engineer with Alsthom Export France at WAPDA 2x110 Unit No. 11 & 12 MW Combine Cycle Power Project Kot Addu.

August 92 to March 94

Worked as an Electrical Technician with Zelin (Pvt.) Limited at WAPDA 600 MW Combined Cycle Power Plant Project Guddu.

January 92 to July 92

Worked as an Electrical Supervisor with SIEMEN’S 1992 at WAPDA 415 MW Combined Cycle Power Project Guddu.



Contact this candidate