Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Medina, Al Madinah Province, Saudi Arabia
Posted:
January 07, 2017

Contact this candidate

Resume:

Page * of *

MAMDOUH MAKRAM AHMED

PROJECT DIRECTOR

PERSONAL INFORMATION

EMAIL ADDRESS : acx5vq@r.postjobfree.com

MOBILE PHONE : +966********* / +20-100-*******

ADDRESS : Saudi Arabia, Madina, King Fahd district, 3003.

: Egypt, Cairo - Maadi - Kornaish elnile st.

Elmohandseen towers - Tower # 5

NATIONALITY : Egyptian

BIRTH DATE : 28/11/1958

MARITAL STATUS : Married

DRIVING LICENSE

ISSUED FROM

: Egypt & KSA

OBJECTIVES

Seeking a higher Senior Management position in competitive construction company where I could prove my expertise and vast experience gained in the construction field. QUALIFICATION:

o Certified Consultant Engineer, Saudi Council Of Engineers, 2014. o Certified Project Manager (IPMA) May 2000 .

o Certified Consultant Engineer, Egyptian Syndicate for Engineers. 1998. o Diploma of higher studies in Construction Engineering, Cairo University 1997 o B.Sc. Civil Engineering, Assuit University, 1981. CAREER SUMMARY:

o Project Director, Abdullah A. M. Al-Khodari Sons Co. Saudi Arabia. o Director-Projects, GTC (Giza for Trading & Contracting) Co. Egypt. o Director-Projects, Osash for Construction and Decoration Co. Egypt. o Project manager, Sun set hills Co. Egypt.

o Project manager, Osash for Construction and Decoration Co. Egypt. MEMBERSHIP:

o The Saudi Council of Engineers

o The Egyptian Management Engineering Society (MES). o The Egyptian Society of Engineers.

o The Egyptian Syndicate for Engineers.

o The Federation of Arab Engineers.

TRAINING COURSES:

o Site Management, 40 Training hours, was trained by Alamar Consulting Group SA., from February 2014 till April 2014.

o Project Management Professional, 35 Training hours, was trained by Emak International Academy

(Registered Education Provider of PMI), August 2009. o Primavera Project Management (P6) (level II), 36 Training hours, was trained by Engineering and Science Services of the American University in Cairo, July 2009. o FIDIC training program, 15 Training hours, was trained by Arab Center for arbitration, March 2009. Page 2 of 9

o Qualification training program for IPMA Certificate, 160 Training hours, was trained by (EMEND) under Supervision of The Egyptian Federation of Construction & Building Contractors, from November 1999 till April 2000.

o Application of computer in construction management (Primavera), 40 Training hours, was trained by

(AMAC) Al-Ahram Management and Computer Center, from September till October 1996. o Construction management, 18 Training hours, was trained by EPM Consultancy under Supervision of The Egyptian Syndicate of Engineers at December 1994. o Engineering survey styles and judging constructions safety, 15 Training hours, was trained by a group of professional specialists under Supervision of The Egyptian Syndicate of Engineers at April 1993. o Concrete structure faults, repair, 18 Training hours, was trained by a group of professional specialists under Supervision of The Egyptian Syndicate of Engineers at November 1992. COMPUTER SKILLS:

o Microsoft office (word – excel - power point).

o Microsoft Project.

o Primavera (P6).

o AutoCAD.

PROFESSIONAL EXPERIENCE

Has good experience in the following:

- Project Management: well experience with managing project from the early beginning of the projects till handing over to client as well as preparing and studying contracts, project time schedules, managing and handling meetings, dealing with clients and contractors as well, tender evaluation, project cost estimate and cash flow and project progress reports, etc.

- Project Coordination: Coordinate between all trades, architecture, structure, electrical and mechanical as well during different design stages and construction period.

- Site Supervision and Site Management: supervising works, review contractor workshop drawing, prepare / review monthly invoices as per progress, coordinate in between all trades during construction, coordinate between different contractors in site.

- Strong organizational, technical and analytical skills; attention to detail.

- Accuracy in input/output data and ability to meet deadlines.

- Strong interpersonal, communication skills.

- Flexibility and creativity.

Page 3 of 9

WORK EXPERIENCE:

May 2014 till Sep. 2016 :

Abdullah A. M. Al-Khodari Sons Co. (Contracting Company) Saudi Arabia. Position: Project Director

Report to: COO

Responsibilities:

Ensure assigned project are completed within budgets and schedules while meeting client needs, business objectives and design guidelines.

Manage program of project and project managers within a region to ensure successful completion and coordination of all efforts.

In cooperation with Regional Client Representative, develops program and annual budget for regional capital project program.

Monitor progress, provides financial control and ensures quality of project.

Responsible for ensuring that project managers:

Manage the project team including architects, engineers, workplace consultants, construction managers and administrative support.

Develop timelines and critical path scheduling of the different phases of the projects to facilitate performing ongoing activities

Approve payment request, initiate change order, and instruct project team.

Identify and evaluates alternative solutions to best meet program goals.

Works cooperatively with and ensures that project managers work cooperatively with the Client Representative to clarify specific needs and requirements and keep Client Representative up-to-date on project status throughout process.

Manage efforts of other corporate support functions such as Legal, Insurance and Loss Prevention, Security, and Systems.

Interacts with governmental branches and regulatory agencies as required to ensure that projects comply with all applicable legal requirements and regulations.

Coordinates with efforts of other departments such as Planning, Cost control, Engineering, HR and Finance.

Advise the COO if any financial, managerial and other resources are required for the project.

Advise the COO of all decisions and actions required from him or the Project Client, preferably giving dates related to the program for construction and taking over.

Motivate the program Team.

Develop the knowledge and skills of the program Team.

Keep the system of control of construction under review and make changes that appear to be needed to achieve the program objectives.

Report to the COO on the progress, cost, quality and predicted results of the construction. Achievements:

Taibah University, – Madinah, Saudi Arabia

Faculty of Finance & Administration Science B 22 (Female). The project Gross building Area is 28,513 m2 and the building composed of lower ground floor, Ground floor, First floor, Second floor and Roof floors:

Lower Ground Floor: Total built area 7,736 m2, composed of parking area, Students hall, Toilets & Washes, Machine rooms, Elevator lobby, Electrical rooms and Control rooms. Ground Floor: Total built area 7,639 m2, composed of Main entrance hall, Classrooms, Administrative offices and Seminar rooms.

First Floor: Total built area 6,323 m2, composed of Classrooms, Administrative offices, Seminar rooms, Computer sections and Meeting rooms.

Faculty of Computer Science - B 503 (Female).

The project Gross building Area is 44,141 m2 and the building composed of lower ground floor, Ground floor, First floor, Second floor and Roof floors:

Page 4 of 9

Lower Ground Floor: Total built area 12,872 m2, composed of parking area, Students hall, Toilets & Washes, Machine rooms, Elevator lobby, Electrical rooms and Control rooms. Ground Floor: Total built area 11,591 m2, composed of Main entrance hall, Classrooms Computer halls and Laboratories.

First Floor: Total built area 10,125 m2, composed of, Administrative offices, Computer halls, Laboratories, libraries and Meeting rooms.

Second Floor: Total built area 8,043 m2, composed of Administrative offices, Laboratories, libraries and Meeting rooms.

Roof Floor: Total built area 1,510 m2, Machine rooms, Electrical rooms. General Classrooms - B 26 (Female).

The project Gross building Area is 43,850 m2 and the building composed of Ground floor and First floor: Ground Floor: Total built area 25,572 m2, composed of Main entrance hall, Classrooms, Shared Classrooms, Lecture halls and Multi-purpose halls. First Floor: Total built area 18,278 m2, composed of, Classrooms, Lecture halls Supportive Deanship Building B 603.

The project Gross building Area is 41,198.00 m2 and the building composed of Basement, G.F., First Floor, Second Floor, Third Floor and Roof:

Basement floor: Total area (17,316 m2) contains Car Parking, Electrical & Communication rooms, Transformer & Generator Rooms.

Ground floor: Total area (8,967 m2) contains Waiting Lobby, Car Parking, Dean & Managers offices rooms, Employee hall, Conference rooms, Prayer hall. First floor: Total area (6,506 m2) contains Waiting Lobby, Dean & Managers offices rooms, Employee hall, Conference rooms, Prayer hall.

Second floor: Total area (5,835 m2) contains Waiting Lobby, Dean & Managers offices rooms, Employee hall, Conference rooms, Prayer hall, Accounting.

Third floor: Total area (2,574 m2) contains Waiting Lobby, Dean & Managers offices rooms, Employee hall, Conference rooms, Prayer hall, Accounting, Electrical Room, Electronic Library, Store.

June 2001 till April 2014

GTC - Giza for Trading & Contracting Co. (Contracting Company) Egypt . Position: Director-Projects

Report to: CEO

Responsibilities:

Write requests for qualification and requests for proposals.

Review and approve data submitted by staff for business development proposals, Provides direct input for proposals, strategic plans, presentations and contract negotiations.

Participates in final pricing of proposals by providing counsel and information pertaining to the Construction Management aspects of the projects.

Coordinate selection of subcontractors or project managers.

Review contracts and agreement documents.

Develop full-scale project execution plans and related communication documents.

Review and approve timelines and critical path scheduling of the different phases of the projects to facilitate performing ongoing activities.

Ensure coordination with projects controls to develop cost estimates, quantity takeoffs and manpower requirements for proposals, forecasts and change orders on assigned projects.

Directs the overall Construction Management, organization, and operations of all projects and related construction activities for the department.

Attend construction job site meetings and communicate progress reports.

Provide periodic construction progress reports for CEO and Board of directors.

Review payment applications and change order requests and present recommendations.

Resolve disputes and conflicts related to projects and Clients. Page 5 of 9

Demonstrate an expertise relative to constructability as applied to construction methods and materials, and the economics involved.

Assist in development of punch lists and oversee successful completion.

Facilitate building start-up and commissioning.

Coordinate training of building users and maintenance staff on use of building systems.

Coordinate project completion, collection of close-out documents, and processing final payments.

Coordinate warranty administration.

Develops annual operating plan and budget for the Department.

Develop training programs for the department staff.

Conduct annual evaluations of the department staff. Achievements:

Grand Resort -122 km on the North Coast Route to Matrouh It is a residential beach resort, It has a 600m front directly facing the sea and composed of : Villa type A, Composed of 105 villas each one is composed of one floor, with built up area of 285 m2 in addition to 410 m2 garden area.

Villa type B, Composed of 122 villas each one is composed of two floors and roof, with areas built up area of 360 m2 in addition to 450 m2 garden area and 85 m2 roof. Villa type C, Composed of 122 villas each one is composed of two chalets; a ground floor chalet with a built up area of 225 m2 in addition to 220 m2 of garden area and first floor chalet with a built up area of 235 m2 in addition to 94 m2 of roof area.

Chalet type D, Composed of 18 buildings, each one is composed of 9 residential units with built up areas between 135 - 240 m2.

In addition to clubhouse, marina and infrastructure. Faculty of Arts, Minya University - Minya City

The project Gross building Area is 20,200 m2 and the building composed of ground floor and four typical floors:

Ground Floor: Main library and administrative offices in addition to classrooms for students, Electrical room and control room.

First Floor: (2) Lecture rooms with area of 850 m 2 in addition to administrative offices and classrooms for students.

Second Floor: Offices of Dean and Vice Dean and professors. Third Floor: (2) Lecture rooms with area of 850 m 2 in addition to administrative offices and classrooms for students.

Fourth Floor: Administrative Offices.

Arabian Nights Resort – Cairo Al Fayiom Road

Composed of 112 studies, area starting from 55 m2 to 75 m2, 33 villas each villa include swimming pool and garden, Building’s area starting from 360 m2 to 430 m2, Mall with building’ area 7500 m2, Composed of Ground, First and Second floor and Recreations area include swimming pools, camels and horses track an beach buggies in addition to restaurants . Capella Resort – Sharm El Sheikh

Composed of 212 residential units that start from 55 m2 up to 113 m2, in addition to a Main building composed of a group of restaurants, shopping areas and international healthy center. AlsoThe Project includes swimming pools and infrastructure.

Alkatan Resort – Cairo Alex. Dessert road

composed of Palace with total building area 5100 m2,includes basement, Ground and first floors, Guest building with total area 750 m2, utility building with area 350 m2, labor’s housing and sport & spa building

. The project also includes swimming pools and infrastructure. Doppio Ritorto factory for weaving and textile - Badr city Page 6 of 9

The buildingۥs area is 8000 m2 and it includes ground and first floor. Alkotb factory for weaving and textile – El Asher City The buildingۥs area is 1800 m2 and it includes ground and first floors. REXAM Beverage Can Factory – 6th of October city

Composed of Steel construction Building with height of 12m to 16 m include Production area and warehouse, the whole building area is 16000 m2. In addition to the EMP networks and roads. Eltabakh villas - El sheikh Zaied city

Composed of 6 Villas, The building area of each villa is (450m2 – 550 m2), Every villa Include a basement, ground and first floors.

El rowas mosque - El sayda Zienab, Cairo

The buildingۥs area is 1200 m2 and it includes ground, first and second floors . Nasser Abdoul Latief Palace - El Haram, Giza

The buildingۥs area is (615 m2). It has a basement (garage and office), ground and first floor (residential), second floor (guest rooms), and a roof (sitting area and service activities). Dr.Emadۥs villa - Eleboor City

The villa’s area is 615 m2 and it includes a basement, ground and first floors. Dr.Ahmed Yehiaۥs villa - Alshrok City

The villa’s area is 350 m2 and it includes a basement, ground and first floors. Al kotb villas - New Cairo City

The project composed of 2 Villas, Area of every villa is 450 m2 and it includes a basement, ground, first and second floors.

El Bous villas - New Cairo City

The project composed of 2 Villas, Area of every villa is 330 m2 and it includes a basement, ground, first and second floors.

August 1999 till May 2001:

Osash for Construction and Decoration Co. (real state company) Egypt. Position: Director-Projects

Report to: CEO

Responsibilities:

Review projects scope and assist in developing projects budget.

Coordinate architect, engineer, and construction consultant selection according to district policies.

Write requests for qualification and requests for proposals.

Review and negotiate professional services contracts.

Participate in planning meetings with design professionals.

Develop timelines and critical path scheduling of the different phases of the projects to facilitate performing ongoing activities.

Coordinate selection of general contractor or project manager.

Review contracts and agreement documents.

Develop full-scale project execution plans and related communication documents

Review insurance certificates and insure compliance with state law.

Coordinate pre-construction planning with design team, contractors.

Attend construction job site meetings and communicate progress reports.

Provide periodic construction progress reports for CEO and Board of directors.

Review payment applications and change order requests and present recommendations.

Verify architect’s recommendation for substantial completion and submit to the Superintendent.

Coordinate walk-through inspections for CEO and Board of directors.

Assist in development of punch lists and oversee successful completion.

Facilitate building start-up and commissioning.

Page 7 of 9

Coordinate training of building users and maintenance staff on use of building systems.

Coordinate project completion, collection of close-out documents, and processing final payments.

Coordinate warranty administration.

Develop training programs for the department staff.

Conduct annual evaluations of the department staff. Achievements:

El Mansourya compound – Mansoureya, Giza

Composed of villas divided into two phases

The First Phase:

Constructed on 168,000 m2, and composed of 29 villa, each one of the villa’s area is in between 500 -800 m2,the villa and the landscape are built on area 4,200 m2 including the gardens, joined with each villa a swimming pool .

The Second Phase:

Constructed on 126,000 m2, Composed of 28 villa, each villa’s area is in between 500 - 800 m2,the villa and the landscape are constructed on area 4,200 m2 include the gardens, joined with each villa a swimming pool, in addition to club house, mosque and infrastructure of both phases. Dina Beach - Zaafarana, Red Sea

Constructed on 134,000 m2 and Composed of two Sector. Touristic:

Touristic center having a lot of touristic activities, such as bowling lanes, billiards room, entertainment games for children. Also, it has tennis and squash courts, big shops, dressing rooms, cafeteria, different kinds of restaurants and diving center .

Real state:

Composed of 230 units for different areas starts from 100 m2 to 250 m2 contains different types for chalets and villas one or two floor and huge lagoons with swimming pools. ElShorok Villas ( La Colina ) - ElSorook City:

Composed of 15 villas on a unique hill with total area of 32000 m2. Each villa has 1400- 1700 m2 as a total area with 400- 600 m2 as a built area. In addition to infrastructures.

January 1997 till July. 1999:

Sun set hills Co. (real state company) Egypt.

Position: Project Manager

Report to: Director-Projects

Responsibilities:

Develop timelines and critical path scheduling of the different phases of the projects to facilitate performing ongoing activities.

Approve payment request, initiate change order, and instruct project team.

Approval of shop drawings.

Approval of material submittals in charge of ensuring inspections and casting structural concrete and architectural elements.

Approve site clarification requests.

Issue change orders approved by client.

Manage the project objectives, costs and progress and advice the Director-Projects of any changes to the project brief, budgets or program are necessary.

Advise the Director-Projects if any financial, managerial and other resources are required for the project.

Advise the Director-Projects of all decisions and actions required from him or the Project Promoter/Employer, preferably giving dates related to the program for design, construction and taking over.

Assist the Director-Projects to appoint the Project Team, define their authority and responsibilities.

Write to the Project Team and all interested parties, and keep these appointments under review. Page 8 of 9

Motivate the Project Team.

Develop the knowledge and skills of the Project Team.

Instruct the Project Team on the project brief.

Keep the system of control of construction under review and make changes that appear to be needed to achieve the project objectives.

Report to the Director-Projects on the progress, cost, quality and predicted results of the construction, at intervals specified by the Director-Projects. Achievements:

Sun set hills city (City View) - km 19 Cairo- Alex. Desert road. Constructed on 537,600 m2 divided into 14 % for buildings and the rest for the green areas. Club house:

constructed on (2,500 m2), it is a social,entertaining,servicing club having main restaurant,children gardens,health club, billiards room, bridge room, ballroom,meeting room,bowling lanes and services center

Villas:

Constructed on (205,000 m2) consists of (85) villa their areas between (400-850 m2) each villa built on land between (1200-2000 m2) each one has a swimming pool . Condominium:

Constructed on 160,000 m2, composed of 6 groups contains 420 units, their areas in between (150-310 m2)

- Added to that the under ground garage and with servicing room for each building. The Village :

Constructed on 50,000 m2, contains on 140 chalets and studios has the same style of all the building added to that an open stage and cafeteria.

November 1992 to Dec. 1996:

Osash for Construction and Decoration Co. (real state company) Egypt. Position: Project Manager

Report to: Director-Projects

Responsibilities:

Develop timelines and critical path scheduling of the different phases of the projects to facilitate performing ongoing activities.

Approve payment request, initiate change order, and instruct project team.

Approval of shop drawings.

Approval of material submittals in charge of ensuring inspections and casting structural concrete and architectural elements.

Approve site clarification requests.

Issue change orders approved by client.

Manage the project objectives, costs and progress and advise the Director-Projects of any changes to the project brief, budgets or program are necessary.

Advise the Director-Projects if any financial, managerial and other resources are required for the project.

Advise the Director-Projects of all decisions and actions required from him or the Project Promoter/Employer, preferably giving dates related to the program for design, construction and taking over.

Assist the Director-Projects to appoint the Project Team, define their authority and responsibilities.

Write to the Project Team and all interested parties, and keep these appointments under review.

Motivate the Project Team.

Develop the knowledge and skills of the Project Team.

Instruct the Project Team on the project brief.

Keep the system of control of construction under review and make changes that appear to be needed to achieve the project objectives.

Page 9 of 9

Report to the Director-Projects on the progress, cost, quality and predicted results of the construction, at intervals specified by the Director-Projects.

Report to the Director-Projects on the progress, cost, quality and predicted results of the construction, at intervals specified by the Director-Projects. Achievements:

- Lebanon housing building – Mohandiseen, Giza:

The tower consists of a basement, ground and 10 floors, it has 18 units.

- El Nour buildings - El Haram, Giza:

They are 9 buildings; each one consists of a basement, ground and 9 floors. all buildings are connected horizontally over the whole project area in the basement, ground and first floor. The basement is garage; the ground and the first floor are shopping center besides 8 floors with 288 unit.

August 1985 to October 1992:

EL- Said for trading and construction Co. (Contracting Company) Egypt. Position: Site engineer .

Report to: Project Manager

Responsibilities:

Setting out (marking the position of structures) and leveling the site.

Checking drawings and quantities and ensuring that the calculations are accurate for the work;

Liaising with any consultants, sub-contractors, supervisors, planners, quantity surveyors and the general workforce involved in the project.

Day-to-day management of the site, including supervising and monitoring the site labor force and monitoring the work of any subcontractors.

Writing detailed daily reports to the Project manager.

Overseeing quality control and safety matters on the site, and ensuring that regulations are adhered to.

Resolving any unexpected technical difficulties, and other problems. Achievements:

- Doctors buildings – El Mokatam, Cairo: consists of 60 units in 5 floors.

- Housing buildings - El Mokatam, Cairo : for labors of General Organization for petroleum: Consists of 8 buildings contain 324 units; each has a basement, ground and 7 floors.

Aug 1983 to July 1985:

International Contrajet Co. (Contracting Company) Egypt. Position: Site Engineer

Report to: Project Manager

Responsibilities:

Setting out (marking the position of structures) and leveling the site.

Checking drawings and quantities and ensuring that the calculations are accurate for the work;

Liaising with any consultants, sub-contractors, supervisors, planners, quantity surveyors and the general workforce involved in the project.

Day-to-day management of the site, including supervising and monitoring the site labor force and monitoring the work of any subcontractors.

Writing detailed daily reports to the Project manager.

Overseeing quality control and safety matters on the site, and ensuring that regulations are adhered to.

Resolving any unexpected technical difficulties, and other problems. Achievements:

- Development of Raswa water station - Port Said : owned by Suez Canal Organization.

- Fire fighting and storage building – Ismailia : owned by Suez Canal Organization.



Contact this candidate