Resume

Sign in

AutoCAD 2016 - Revit 2017

Location:
Manchester, Connecticut, United States
Posted:
January 06, 2017

Contact this candidate

Waseem Khoury Abd Alah

Mobile: (860) *** ****

Email: acx5d5@r.postjobfree.com

Residency: Green Card, Recently relocated to CT and open to relocation in Northeast or east coast

Profile:

Seeking a challenging position to utilize my high level of skills in:

-HVAC

-Firefighting

-Fire Alarm

-Fabrication

-Ducting and piping

-Mechanical Maintenance

-Water pumping station

-Troubleshooting

Professional Summary:

Ten years of HVAC designing experience. Created cutting-edge designs that met deadlines, budget restrictions, and product specifications. Team leader able to complete multiphase projects, from plan development to oversight of costs, schedules, quality, information, team management and contracts. Expertise in CAD software for preparing drafts, sketches, specs and 2D/3D design concepts.

Core Strength:

- Problem Solver, able to identify problems and implement corrective processes.

- Hard worker can get my work done even in the face of difficult obstacles.

Technical Skills

CAD Programs: AutoCAD 2016 (10 years)

Revit 2017 (3 years)

SolidWorks 2015 (8 years)

HVAC Programs: HAP 4.6 (Carrier) (5 years)

LATS-Psy (LG) (10 years)

Fire Alarm Programming: Loop manager (Mavigrade) (3 years)

Other Programs: MS Office (Word, Excel, PowerPoint) (15 years)

Professional Experience:

1.Trade Links Company, Erbil, Iraq

Executive Manager / Engineering department Mar. 2013 until present

-Provided engineering consulting services in residential and commercial building design in accordance with ASHRAE and NFPA standards.

-Performed heating and cooling load calculations and psychometric analysis using HAP Software to meet building requirements.

-Selected and laid out HVAC, Fire Protection and Fire Alarm equipment based on in-person site inspections and fieldwork.

-Designed ductwork system in accordance with SMACNA standard.

-Collaborated with architects, engineers, and clients to achieve quality-building designs.

-Generated HVAC and fire protection plans on Revit and AutoCAD to meet client’s requirements.

-Involved in HVAC system design to comply with Green Building Criteria.

-Scheduled 65 employees to fabricate and install individual projects.

-Supervised the execution of the works.

Projects

HVAC Systems:

-7 floors show building.

-Eye Clinic.

-Maternity Clinic.

-Autism Center.

-Develda Restaurant.

-Petro Alliance Offices.

-Carrefour Supermarket.

-Saint Paul Church

Firefighting systems:

-Water suppression system (sprinklers and hose reel)

Control Building of KAR Group petroleum refinery.

Swiss Supermarket.

Mega Mall.

-FM200 suppression systems

2 rooms in the Control Building of KAR Group petroleum refinery.

6 rooms in fransaBank

-Wet chemical system / Quiznos Restaurant

Fire Alarm Systems:

-Eye Clinic

-Maternity Clinic

-Autism Center

-9 buildings each one 8 floors, Atlantic City, Claremont Company.

Achievement:

By leading the team with integrity, building trust in relationship with customer, and setting the goals. I grew customer base by 40%, cut running cost by 10%, and boosted earnings by 30%.

2.Smart Solutions Company, Latakia, Syria. (Self-Employed)

Managing Director Feb. 2009 – Dec. 2012

-Supervised the execution of HVAC system for Orange Mall and Aljghnoun Restaurant.

-Operated and maintained four water pumping station with capacities from 26K to 105K [GPM]. Replaced packing rings, calibrated coupling using dial indicator, regulated butterfly valves, gate valves, check valves, level indicators, and water hummer tanks to be connected with PLC.

-Managed mechanical drawing from chalets blocks - Porto Tartous project and coordinated 40 employees to:

Install water suppression system (Hose reel).

Install air conditioning systems

-Designed and executed HVAC System for many residents and restaurants.

3.TEG (Technical Engineering Group), Latakia, Syria.

Executive Manager Sep. 2005 - May. 2007

-Managed engineering design proposal, design drawings and specifications, performed shop drawings, recommended improvements, and coordinated 40 employees to:

Add five additional pumps to an existing pump stations. The capacities of the pumps were from 800 to 1300 [GPM].

Install several generator sets with their ATS panels at many pumping stations, their powers were from 17 to 365 [KVA].

Install electrical and mechanical equipment at 3 pumping stations, their capacities were from 2200 to 6600 [GPM].

Install electrical and mechanical equipment for 25 refrigerating rooms in biological control building.

-Maintained three water pumping stations, their capacities were from 4.4K to 13.2K [GPM].

4.BEMCO, Latakia, Syria

Site Manager Jul. 2004 - Aug. 2005

Project: ROTANA Hotel

-Managed tender drawings and specifications, performed shop drawings, and recommended improvements.

-Took off quantities for HVAC.

-Supervised the execution of HVAC systems, firefighting systems, sanitary network, and water supply network

-Scheduled 60 employees to fabricate and install individual drawings.

-Tracked the progress.

-Reported activities and progress to management.

-Elaborated as-built drawing.

5.Prof. Johny Takla, Latakia, Syria

HVAC Design Engineer Jul. 2007 – Feb. 2011

Calculated Heating and cooling loads, created mechanical designs and prepared BOQs for the following projects:

-10 floors residential building

-Orange Mall.

-Al-Benshi Mall.

-Dar Al-Shefaa Hospital.

6.Faculty of Mechanical and Electrical Engineering, Tishreen University, Latakia, Syria.

Academic Assistant, Teaching staff 1/6/2005 – 1/12/2012

Publications:

Wrote three books that published by RAY Publishing & Science.

AutoCAD2009 Classroom in a Book / AutoCAD2010 Classroom in a Book / AutoCAD2012 Classroom in a Book

Education:

Degrees evaluated by NCEES:

Bachelors in Mechanical Engineering – Power / Tishreen University, Syria – 2004

Total Semester Credit Hours Earned: 161

Training Courses:

-Potash production from dead sea, by Arab Potash Company-Jordan



Contact this candidate