MALCOLM CORTNER
**** **** ******** ******, ****** Arrow, OK 74012 H: 918-***-**** C: 918-***-**** ****************@*****.*** 25 years experience in field construction, piping and structural erection. 20 years code pipe welding. Stick, Tig, Fluxcored, Mig. Carbon steel, all non ferrous alloys. 5 years in the manufacturing industry. Pressure vessel, heat exchangers. Willing to travel.
20Years Strict code welding/ fabrication. Carbon steel, non ferrous alloys. Operate most forms of shop
equipment. Petrochemical, marine, environments. . Works well alone or under supervision. Highly motivated, strong communication skills. Code piping, structural fabrication. Operate most forms of field equipment related to
structural erection and piping installation. Skytrack, scissor lift, JLG lifts. Experienced rigger, high climber. Team liaison
Self-motivated
Strong verbal communication
Certified tube / structural welder, 06/2014 to 09/2016 Kelvion Thermal Solutions – Catoosa, Ok
Code welding. Tube and structural. Tig, spray. Carbon steel. Pipe welds conform to A.W.S. B31.3 section 9. Radiographic testing. Structural welds conform to Canadian standards. Spray arc, radiographic testing. Achieved [revenue or departmental objective] by [actions taken]. Fabricator, Welder, Erector, 09/2010 to 01/2014
Curtis Kelsey Construction – Tulsa, Ok.
Structural fabrication, welding and erection. Carpentry, concrete, plumbing. Achieved [revenue or departmental objective] by [actions taken]. Welder, 05/2010 to 08/2010
Ref- Chem Inc. – Houston Tx.
Fabrication and installation of supports, guides, shoes for process piping systems. Carbon steel, stick. 7018/ 7010. Achieved [revenue or departmental objective] by [actions taken]. Code welder/fabricator, 06/2009 to 04/2010
Bliss Industries – Ponca City, Ok.
Code welding and fabrication. Carbon steel, stainless steel. Tig, Mig, Stick. Operate most forms of shop equipment. Saws, drill press, forklifts, cranes, plate rollers. Achieved [revenue or departmental objective] by [actions taken]. Fabricator, welder, erector, 01/2007 to 06/2009
Curtis Kelsey – Tulsa, OK
Code fabrication, welding, erection, concrete, carpentry, and plumbing. Achieved [revenue or departmental objective] by [actions taken]. pipe welder, 08/2006 to 12/2006
Rattlif Construction – Ponca City, OK
Code welding of high pressure piping systems. Carbon steel, Mig, Fluxcored. Roll out on pinwheel. All work conformed to A. W. S. B 31.3 section 9. 100% Radiographic testing. Achieved [revenue or departmental objective] by [actions taken]. Pipe Welder, 04/2006 to 08/2006
LBJ Mechanical Contractors – Ponca City, Ok.
Fabrication and welding of high pressure code piping systems. Carbon steel, stainless steels. Stick, tig, fluxcored. All work conformed to A.W.S. B31.3 section 9. 100% radiographic testing. PROFESSIONAL SUMMARY
SKILLS
WORK HISTORY
Achieved [revenue or departmental objective] by [actions taken]. Pipe Welder, 12/2005 to 02/2006
Shaw Constructors – Baton Rouge La.
Fabricate weld and install high pressure code piping systems. Carbon steel. Stick, tig. All work conformed to A.W.S. B 31.3 section 9. 100% Radiographic testing. Achieved [revenue or departmental objective] by [actions taken]. Iron Worker/ Welder, 11/1995 to 11/2005
Braden Construction Services – Tuksa, Ok.
Fabrication, welding, erection. Structural steel and code piping systems. Carbon steel, stainless steels. Stick, tig, fluxcored, orbital tig. All pipe welds conformed to A.W.S. B 31.3 section 9. 100% Radiographic testing. Achieved [revenue or departmental objective] by [actions taken]. Iron Worker/ Erector, 02/1995 to 10/1995
Milco Constructors – Long Beach, Ca.
Field erection of wind turbines for electrical generation. Heavy rigging for high lifting, bolt up and hydraulic torqueing of all bolted components.
Achieved [revenue or departmental objective] by [actions taken]. Pipe / Instrumentation fitter / welder, 02/1991 to 12/1993 Control Center LLC – Winter Park Fla.
Fabrication, welding, of various types of process skids. Carbon steel, stainless steels. Bend and install stainless tubing to required machinery on skids. 1/2 to 1 1/2 inch tubing. Proficient in hand and hydraulic bending, mechanical and hydraulic swage processes. Parker and Swagelock systems. Warranty/Repair crew welder, instrumentation tuber supervisor. Travelled the U.S. doing and supervising warranty/repair work to our clients. Achieved [revenue or departmental objective] by [actions taken]. N/A: Environmental Sciences, N.A.
University of Northern Arizona - Flagstaff, Az.
High School Diploma: 1975
American Welding School & Testing Laboratory - Tulsa, OK EDUCATION