Pl. 419-***-****
Toledo, Ohio E-mail
***** **********@yahoo.
com
Michael D. Kookoothe
Objective To obtain a position as a Program manager performing such tasks
as process quality, and project engineering, to launch new
product lines. To train and implement Lean Manufacturing and
Continuous Improvement, to reduce cost and increase efficiencies.
To prepare and implement quality systems for new product launches
Summary of and current product production. Perform quality assurance
Qualification procedures and testing. Work with customers with regards to new
s part introduction and engineering changes. Direct programs to
meet cost and timing for new model launch. Work with customers
and company staff to deliver prototype part in timely order.
Manufacturing engineer with extensive launch experience.
Product Development Program Management experience during launch
of Superduty trucks
Experienced in Quality Control processes and manufacturing
procedures.
Quality implementation supervisor during new model launch and
current model production.
Skilled in tooling installations at multiple locations.
"Six Sigma Greenbelt" certified from Ford and Honeywell.
Developed lean manufacturing techniques for large-scale model
programs at 5 locations.
Experienced in developing PFMEAS and PPAP for new part
implementation.
Experienced in evaluating processes and procedures for new
tooling and older processes for cost reduction.
Subject matter expert in many lean functions such as Dock to
Dock, First Time Through, Current and Future State Mapping,
Reliability & Maintainability, Overall Equipment Effectiveness,
5S, Train the Trainer, Continuous Flow and Stability workshop
instructor, and Major Loss Analysis.
Experienced in the use of SPC, Design of Experiments
Experienced Chassis and Powertrain process engineering and
tooling installations
Experienced in implementation and instruction of JIT, 5S, Value
Stream Mapping
Experienced in instructing and implementation of the Ford
Production System.
Experienced in working with suppliers in PSW submisions.
Education
B.A Business / Finance and accounting
Lourdes College, Sylvania Oh 3.75 GPA
Associates / Finance and Accounting
Owens Community College 3.95 GPA
Ford Design Institute
B.A. Engineering School U of M Dearborn
GPA 3.5
Professional
Experience Ford Motor Company
Product Development Program Management
December 2015 to 11/23/2016
Lead product development teams for launch of P558 Superduty
Launch
Lead and direct quality actions on products for trim, chassis,
and powertrain
Coordinate efforts with sister plant in Kentucky on 2017 launch
Coordinate launch efforts with Vehicle Operations to ensure safe
launch at OHAP (Ohio Assembly Plant)
Lead Program teams to resolve design action for launch at Job 1
Lead Product development in required actions for supplier quality
actions
Quality Manager, Matsu Ohio
June 2015 to December 2015
Lead and direct all functions of the quality department in the
following areas:
TS/ISO audits
Launch programs
PFMEA APQP functions
Develop customer relationships with our customers
Train and develop quality improvements and systems
Prepare annual budgets
Senior Launch Engineer, Autoneum, Oregon, OH
March 2013 to May 2015
Develop safe launch systems for Ford, GM, and Chrysler new model
launched in 3 facilities
Perform tooling studies and buy off on new programs
Develop new model launch teams
Review PPAP and APQP requirements for new programs and deliver to
launch teams
PSW and program reviews per gate review
Supplier Quality Management Systems, Honeywell Aerospace, Tempe,
AZ
Aerospace Quality Systems Development
Nov 2012 to March 2013
Develop APQP quality systems within a supplier network
Present Lean Robust quality systems to supplier network
Deliver PFMEA/PSW programs to suppliers to conform to Honeywell
systems
Manufacturing Engineer Quality and Reliability Systems,
Caterpillar Corporation
Aurora, IL Facility, Construction Equipment Final Assembly,
April 2010 to October 2012
Audit PFMEA's to reduce risk in field defects
Develop proactive reliability matrix to increase reliability
Present matrix to plant and corporate offices to establish
effective quality systems in new model production and development
Ford Motor Company
October 1976 to April 2010
Manufacturing Engineer Quality Systems, February 2010 to April
2010
Dearborn Truck Plant
Audit in station process control systems
APQP audits for Raptor SVT trucks
Vehicle audits from end of line
Vehicle audit from customer acceptance line
Quality representative for PVT and Process Floor
Manufacturing Engineer, June 2008 to August 2008
Cleveland Engine Plant (Contract Assignment)
Develop robust manufacturing processes for new tooling
Identified Constraints in manufacturing systems
Coordinated process activities with production and quality
departments to increase output
Prepared job safety analysis for non-automated systems
Increase JPH on multiple systems of engine assembly
Created operator instructions sheets for new tooling
Implemented 5S for block line and head lines
Manufacturing Engineer, Feb. 2008 to May 2008
Monroe ACH (Contract Assignment)
Assisted production department in achieving phase out goals.
Provided engineering specific data to ensure continual quality
improvements during planned phase out.
Coordinated engineering activities between production, quality,
and other associated engineering departments.
Collaborated with local union and management to optimize
initiation for production phase out.
Developed flow chart process for scrap and repair material in
order to maximize production efficiencies.
Prepared PPAP documentation to report the quality and job intent
on exhaust systems.
Provided PPAP analysis for parts implementation to multiple
plants with the same product line.
Increased "First Time Through" on 6 catalytic converter lines.
Developed "Future State Mapping" for 2 converter lines at a new
facility.
Redesigned line side layout for "5s" strategy on 4 converter
lines.
Manufacturing Engineer, Dearborn, MI, October 1999 to 2007
Managed tooling installations for power train and chassis systems
in 3 F-series truck plants.
Managed tooling buy-offs from outside suppliers.
Implemented lean cycle line lay out at each facility. (145 work
stations)
Coordinated tooling installations at Kentucky Truck Plant during
the 2008 Super Duty launch during shut down intervals.
Tested and reinstalled tooling for chassis body decking.
Coordinated consolidation of the Lorain and Ohio Assembly plants
for Econoline Van final assembly.
Installed and refurbished tooling in Body shop Avon Lake
consolidation.
Installed resistance robotic welders in body shop Avon Lake.
Ford Motor Company Continued...
Coordinated efforts between various stamping plants an assembly
plants
Collaborated with local union and salaried personnel to create
ergonomically feasible workstations.
Coordinated closure and movement of equipment from Wixom Assembly
to St Thomas for Wixom consolidation and closure.
Developed PPAP for power train parts for timely implementation
into production.
Prepared PPAP documentation to report the quality and job intent
on chassis products.
Provided assistance to Wayne Assembly Plant in determining
downtime issues in the body shop during 2008 Focus Launch.
Worked with the Monroe Visteon Plant during phase out of
catalytic converter operations to various suppliers. (3 month
program)
Provided manufacturing assistance to Cleveland Engine Plant 2
operations during phase out operations of 3.2L engine. Revealed
information on bottleneck constraints within the operations.
Production Supervisor, Maumee, OH, June 1996 to October 1999
Supervised production and skilled trades in all areas of
manufacturing of stamped and extruded parts for distribution to
all North American operations.
Facilitated small group activities for the implementation of the
Ford Production System (FPS) throughout the plant.
Supervised quality control personnel.
Supervised the Plastic Extrusion Process.
Supervised the Lean Implementations for the Ford Production
System.
Taught JIT, 5S, Value Stream Mapping, and Ford Production System
Responsible for the direct supervision of UAW employees.
Energy Management Coordinator and Production Line Team Leader
Maumee, Oh, October 1976-June 1996
Managed the implementation and installation of an energy
management system to reduce energy consumption.
Supervised and completed more than 40 energy saving projects in
less than five years with cost savings of over 1 million dollars.
Supervised the installation of new boiler system.
Production Line Team Leader.
Conducted Die Set operations.
Lean Manufacturing instructor and implementation leader.