Professional Biography

Personal Data :

Full Name : Mirwan Munir

Place / Date of Birth : Bengkulu / December 27th 1961

Nationality : Indonesia

Marital Status : Married

Identity card no. : 32.14.13.271-***-****

Passport number : T. 242009

Home Address : Jalan Raya Sadang – Ciwangi No. 17

RT. 29/06, Purwakarta-Jawa Barat,

Phone : HP:+62.821.14771930 / HP :+62.858.58302354

E-mail : acx35i@r.postjobfree.com

Education : Graduated from PROF. DR. MOESTOPO University 1985

Majoring Teknik Mesin (Technical Machine) Jakarta.

Language : Indonesia as My Native Language

English – Well ( Spoken and Written )

Courses : Supervisory Management

Mechanical Millwright Modules

Discipline Qualification : Construction Superintendent

Mechanical Inspector / QC Engineer

Training Safety

Safety training Chemical Biological is also provided for the SCAPE CBRN30 Emergency Escape Mask and Antidote Nerve Agent Auto injector (ATNAA) April 27th .2009(U.S. Embassy Baghdad).

Safety Training for Chemical Biological Weapon (OBO/IPCO Department Of State ) Baghdad Iraq( year,2006)

Basic Safety Training (BST )

Job Safety Analysis ( JSA )

Health, Safety and the Environment ( HSE )

Fire Watch Training (Gulf Resources (KAKAP) LTD-Field HSE Department)

at FPSO Kakap Natuna Offshore Platform. April 28th, 2001

Experience Summary

The past 25 years has been specifically dedicated to Oil and Gas Industry, with the reminder being associated with the Pipeline Project Onshore /Offshore Oil & Gas Plant and Platform, Refinery Project, Petro Chemical Engineering, Power Plant Project, Pulp Mill Industry and Building Construction. Experience industry has been gained in all aspect of Piping/ Mechanical Inspector activities with the emphasize on pipe Fabrication and compressing training of junior personal and all components of Production utility system high pressure testing and procedures also. Well versed in project procedure punch list, certification, equipments and documentation, planning and coordinating, commissioning, activities to ensure that milestone are achieved. Inspection of Buildings for Mechanical System included Electrical for Security System and Power Plant Project.

Employment Data & Field Experiences

FEB 2016 – Present : PT. EMKA Rekayasa Energy – Energy Consultant

Position : Mechanical/Boiler Engineer as Client

Project : Power Plant Project ( 2 X 25 MW ) Sambelia

CFSPP-PLTU Sambelia, Lombok Timur - NTB

Client : PT. LOMBOK ENERGI DINAMIC – IPP. East Lombok

Duties : Inspection & Monitoring of Boiler and especially Steam Turbine

Piping Erection all Mechanical Equipment, Belt Conveyor

Structural Steel Work, Chemica Plant and Commissioning

for Steam Turbine Project (2 X 25 MW) Jiangxi-Jiusheng.

JIANGXI Electric Power Design Institute – Equipment Co.Ltd

August 2015 – Des 2015 : PT. INDRA KARYA – Consulting Engineer

Position : Mechanical / QC Engineer as Client

Project : Hydro Power Project (2 X 10 MW) GENYEM

Client : PT. PLN ( Persero ) UIP – UPK 4 Jayapura – PAPUA

Duties : Inspection & Monitoring Mechanical Work Turbine /

Erection All Mechanical Equipment

Especially Turbine & Generator, Piping ( Penstock )

Structural Steel Work and Commissioning of Hydro

Power Project (2 X 10 MW) for Overseeing Contractor

Waskita – GXED Consortium (Guangxi Electric Power

Industry Investigation Design and Research Institute)

Dec 2013 – Nov 2014 : PT. AMYTHAS – Consulting Engineer

Position : Mechanical/Boiler Engineer as Client

Project : Power Plant Project ( 2 X 110 MW ) Meulaboh

CFSPP-PLTU Nagan Raya-NAD – ACEH

Client : PT.PLN(Persero) UIP-KITRING - NAD

Duties : Inspection & Monitoring of Boiler and Piping Installation

Erection all Mechanical Equipment especially Boiler&Turbine

Conveyor, Structural Steel Work and Commissioning

for Steam Turbine Project (2x110 MW) SINOHYDRO &

Zhejiang Electric Power Design Institute ( ZEPDI )

June 2013 – Nov 2013 : PT. REKAYASA INDUSTRY – Engineering & Construction

Position : Piping Superintendent

Project : SABAH AMMONIA UREA (SAMUR) PROJECT

Client : PETRONAS CHEMICALS FERTILISER SABAH SDN BHD

Duties : Responsibility of fabrication and Piping Erection. Construction All Mechanical Equipment,Structural Steel Work Organizing Punch List, Hydro Test 8 Commingsioning For Petronas Chemical Fertiliser Sabah SDN BHD – Sabah Ammonia Urea (Samur) Project of Sipitang, Sabah – Malaysia.

Description of Duties

Inspection of Construction, Coordinating Activities

Project including manpower support.

Prepare drawing layout for installation, data sheets

Calculation for mechanical equipment and piping installation Construction supervision of piping/mechanical installation

Pipe fitting and flow line system.

Review and approval for document Construction Procedure

Such as: Installation Procedure, Hydrotest Procedure,

Leak Test and Commissioning Procedure

Monitoring fabrication of piping support and pipe rack

At contractor workshop.

Monitoring Commissioning and start up activity,

Preparation of Project Report such as :

Daily report, Weekly Progress report and Completion report.

Sept 2012 – June 2013 : PT. INDRA KARYA – Consulting Engineer

Position : Mechanical/Piping Engineer as Client

Project : Power Plant Project ( 2 X 25 MW )

CFSPP-PLTU NTB – LOMBOK

Client : PT.PLN(Persero) UIP-KITRING NUSRA

Duties : Inspection of Fabrication & Piping Erection all Mechanical

Equipment, Conveyor, Structural Steel Work and Commissi

Oning for Power Plant Project (2x25 MW) Jiangxi Jianglian

Energy & Environment Co. Ltd

April 2011 – July 2012 : POSCO E&C – Engineering Consultant

Position : Mechanical Engineer / QC Engineer

Project : Indonesia Intergrated Steel Mill

Krakatau Posco – Cilegon West Java

Duties : Inspection of Fabrication & Piping Erection all Mechanical

Equipment, Conveyor, Structural Steel Work and Commissi

Oning for Krakatau Steel Mill Project in Cilegon Banten

Feb 2010 – Feb 2011 : PT. CITRA MEGAH KARYA GEMILANG

Position : Construction Superintendent

Project : Power Plant/Geo Thermal Project-Gunung Salak

Since Feb 2010 until Feb 2011

Duties : Inspection of Pipeline Installation, Conveyor, All Mechanical

Equipment, Pipe fitting, Commissioning and Hydro test for

Geothermal Project Chevron Field – Gunung Salak

Feb 2006 – July 2009 : OVERSEAS BUILDINGS OPERATIONS

United States Departement of State

Position : Mechanical Engineer / QC Engineer

Technical Site Security as Client

Project : OVERSEAS BUILDINGS OPERATIONS

NEW EMBASSY COMPOUND

Duties : Inspection of Buildings Construction and Site Observation of

Electrical System for Security System, Telecommunication & CATV and Responsible for Over Seeing contractor FIRST KUWAITI for Inspection of piping erection or Mechanical, structure & utility system and Hydrotest, organizing punch list and site Instruction for OVERSEAS BUILDINGS OPERATIONS and Iraq - Project Coordination Office for NEW EMBASSY COMPOUND at Green Zone Area in BAGHDAD IRAQ

Responsibility :

Coordination with other Department Engineer for the Facilities Management.

Takes field measurements and acquires required information to generate project details

Perform review of project and develops statements of work, details drawings (Interior and Exterior), Shop Drawing (Interior and Exterior) and specification for constructions.

Review Master Plan

Prepare Material for Approval

Checked Drawing for Construction

Inspection with Owner’s

Quality Control and Quality Assurance

Dec 2004 - Nov 2005 PT. CITRA MEGAH KARYA GEMILANG

Position : Mechanical Inspector / QC

Project : Betara Complex Development / Gas Plant Project

Client : PetroChina International Jabung Ltd.

Duties : Supervision of Fabrication, Construction, and Mechanical/Conveyor Structural Steel Work, Organizing Punch List, Hydro test and Commissioning for PetroChina International Jabung Ltd. – Gas Plant Project – JAMBI.

March 2004 - August 2004 : PT. TRUBA JURONG ENGINEERING

Position : Mechanical Inspector / QC

Project : Power Plant Project 150 MW GFCC, Palembang Timur

Client : CNCEC CHINES

Duties : Responsibility of Fabrication and Piping erection all mechanical equipment, Conveyor, structural steel work and commissioning for power plant project 150 MW GFCC (CNCEC CHINES) at

Palembang Timur.

March2002 – Dec 2002 : TOTALFINAELF

Position : QC Mechanical Inspector/Supervisor as Client

Project : Tunu Field Development Project TP 8 EPSC 1

Duties : Inspection of construction and installation jacket, process deck of NCP Plat form for Tunu Field Development Project and responsible for overseeing contractor PT.Gunanusa Utama Fabricators and PT. Mc. Connell Dowell for Supervise pile & fender filling activity project TP 8 EPSC I/ Post trenching GTS/L to GTS/I and tie in and string positioning 24” Pipe Line TP 8 EPSC 3 for Total Finaelf E & P Indonesie

offshore platform – East of Kalimantan

June 2000 - Nov 2002 : PT. Petrosa-Kakap Offshore-Natuna-South China Sea

Position : Piping/Construction Supervisor.

Client : Gulf Resource Petroleum.

Duties : Responsible for Pipe installation on the KF platform connecting on skid and off skid spools organizing shutdowns and solving problems arising during installation.

June 2000 - Nov 2000 : PT. Petrosea - Jakarta

Position : Piping/ Construction Supervisor

Client : Gulf Resource Petroleum

Project : Offshore and onshore Kakap Gas Compression project at South China Sea

Duties : Inspection of Fabrication, Construction And Piping Erection the following Modules for the Gulf Petroleum/ Kakap Gas Compression project and responsible for over Seeing Sub contractor PT.Profab – Batam Island Installation of pipe spools, pressure vessel and Structural steel work, organizing Punch-list And site Instruction for Re-work, Coordinating Shutdown Job for Gulf Resources Off Shores Platform.

Sept 1999 - Nov 1999 : PT. Komaritim – Jakarta

Position : Construction Supervisor

Client : ARCO – ARII

Project : PGG Project Pagerungan Island Arco field Since September until November 1999

Duties : Supervision of Erection Piping, Pipe line Installation and Structure work done by Arco field, offshores Gas Plan Project at Pagerungan Island.

July 1998 - July 1999 : PT. Truba Jurong Engineering – Jakarta

Position : Mechanical Inspector / QC

Client : Klockner/ PT. TEL Pulp & Paper

Project : Musi Pulp Mill Project – Tanjung Enim lestari Pulp & Paper Pulp Machine (Flat Dryer) Desa Dalam Prabumulih – South Sumatera since July 1998 until July 1999.

Duties : Supervision of Piping Erection, Structure Mechanical Construction at Pulp Machine (Flat Dryer), Conveyor and Joint Operation with ABB Drying at Musi Pulp Mill Project for Klocner and PT.TEL Pulp & Paper at Desa Dalam Prabumulih – South Sumatera.

August 1997 - Dec 1997 : PT.Truba Jurong Engineering - Jakarta

Position : Piping Supervisor

Client : PT.Riau Andalan Pulp & Paper

Project : Power Plant (Recovery Boiler) 2 Units at Pangkalan Kerinci – Riau since August until December 1997

Duties : Responsibility of fabrication and Piping Erection all Mechanical Equipment Conveyor, Structural steel, Hydro Test and Commissioning for RAPP Project – Power Plant Recovery Boiler at Pangkalan Kerinci – Riau.

March 1997- August 1997 : Fluor Daniel - Jakarta

Position : Construction Supervisor

Client : UNOCAL

Project : Power Plant / Geo Thermal Project,Gunung Salak- Sukabumi

Since March 1977 until August 1977

Duties : Responsibility of fabrication and piping erection, all mechanical

Equipment, pipe fitting, structural steel work, commissioning

And Hydrotest for Geo Thermal Project – UNOCAL Field

Gunung Salak - Sukabumi

Jan 1994 - August 1996 : PT.Riau Andalan Pulp & Paper

Position : Piping Engineer

Pangkalan Kerinci – Pekanbaru - Riau

Assigned as Piping Supervisor for Installation, construction Pulp Mill Project RAPP since January 21, 1994 until August31, 1996.

Duties : Field Piping Engineering Inspection of Piping Erection and Supervising of

Contractor within Power Plant, Fiber Line and Turbine house pressure piping,Conveyor Include Arranging for materials, and then Supervising of Maintenance especially Fiber Line & Power Plant.

June 1993 - Dec 1993 : PT.Petrohan Tri Tunggal

Position : Piping Inspector /QC Contract O.P.I Ltd (Off-Shore PipeLine International Ltd Barge DLB 264 for Unocal Field off Shores Project since June 1993 until December 1993.

Duties : Pipe Line Installation & Piping Erection and Structure for Unocal field

Offshore Project.

June 1992 - Oct 1992 : PT. Kartika Reka Utama

Position : Piping Supervisor Assigned as Piping Supervisor on Contract at Cirata Hydro Electric Project West Java for Installation Construction Project since June 03, 1992 until October 17, 1992.

Duties : Supervisor of Erection Piping Structure Work done by Cirata Hydro Electric Power Plant Project- West Java.

May 1991 - June 1991 : PT. Indo Marine

Position : Pipe Fitter Foreman

Assigned as Piping Foreman Contract to Indo Rayon

PT.Indo Rayon Utama – North Sumatra

For Revision Boiler – Shut down Project

Since May 01, 1991 until June 30, 1991

Duties : Revision piping & Tubing (in Recovery Boiler) for Shut down Job

Project at Porsea, Medan.

July 1990 - Dec 1990 : PT. Mc Dermott Indonesia DB29

Position : Assigned as Fitter Foreman for Maxus Field (Off Shore Process deck Widuri Platform at South East Sumatra from July 1990 up to December 1990.

Duties : Installation Jacket, Process Deck Widuri Platform and Erection Piping for Maxus Field – Off Shore Project.

Nov 1989 - April 1990 : PT.AZIL (Engineering Corporation)

Position : Assigned as Piping Foreman for Marathon Petroleum Ltd. off Shore Flow Line Project at China Sea from November 1989 up to April 1990

Duties : Installation & Erection Piping for Marathon Petroleum Ltd. – Off Shore Flow Line Project at China Sea.

July 1988 - Oct 1988 : PT. Trans Bakrie

Position : Piping Supervisor Assigned as Piping supervisor Contract PT.Monterando Mas Mining (Kalimantan Barat) For Installation Construction Project since July 1988 until October 1988.

Duties : Responsibilities in Supervising of Piping Erection, All Mchanical Equipment Conveyor,Structure Steel for Installation Construction Project, for PT. Monterando Mas Mining Kalimantan – Barat.

Feb 1986 - August 1986 : PT. Mc Dermott Indonesia

Position : Assigned as Fitter Foreman for Derrick Barge Project at Batam and Singapore Jurong Shipyard/floating dock from February 28, 1986 until August 29, 1986

Duties : Installation, Structural steel construction vessel, pipeline station/revision. Erection pipes spool and pressure vessel/ compressor at Batam Island-Singapore Jurong Shipyard. Piping and structure for Derrick Barge

Off Shore Project at Batam and Singapore-Jurong Shipyard

All above Information is true and correct to the best of knowledge, and it is understood that the above Curriculum Vitae, maybe used as record of my post Education job experience and reference.

Purwakarta, August, 2016

Very truly yours,

Mirwan Munir