POWERTECH CO. LTD
NAME OF THE COMPANY…. SM POWERTECH CO.LTD-SAMSUNG C &T ENGINEERING
NAME OF PROJECT QURAYYAH INDEPENDENT POWER PLANT PROJECT, KSA
POSITION & CATEGORY….. ELECTRICAL LEADMAN FROM JULY 15, 2013 TO JULY 15, 2015
First thing to do request the permit to work to permit issuer.
Conduct joint site inspection to the permit issuer.
Discuss with permit issuer about the job scope involved hazard require precaution PPE Communication Emergency equipment.
After receiving the permit I have to conduct tool box talk with the crew and ensure work crew will sign the DTRA and PTW.
Ask my supervisor what I need to do so that I can request to him the tools and the material’s what I needed for my assignment.
Analyzing the drawing is very important so that I can avoid some mistake and error, followed the rule’s and regulation of my company .then proceed to my task
After checking all the drawings and legends of the plan, working started like, cable tray support fabrication and installation according to each given measurements and location.
Cable tray installation and fabrication it depend upon the correct size and location of the tray, also performing the…….
Setting of the panel and marshalling panel cabinet termination of instrument cable like analog and digital cables installation of various instruments termination of instrument cable from marshalling panel to field instrument.
Box setting of all the location of receptacle, switches, panel, telephone, cabinet and many others.
Glanding and termination of instrument cable both analog and digital cables also assigned in meggering and continuity testing installation of various types of instruments.
Wiring of all the circuits for lighting power/ receptacle, telephone, fire alarm and telecommunication line.
Panel installation according to each given measurements.
Fabricated elbow for cable trays including installation according to each measurement and scales.
Trouble shooting of all the wirings if there is some problems/ errors.
Checking of all the circuits.
Termination of all circuits according to the given circuit number.
Installation and fixing of all the devices in all area.
Energizing all the main supply and panels.
NAME OF THE COMPANY…. SM POWERTECH CO.LTD-SAMSUNG ENGINEERNG
NAME OF PROJECT SULB STEEL MILL PROJECT IN BAHRAIN
POSITION & CATEGORY….. ELECTRICAL TECHNICIAN FROM DECEMBER 20, 2011 UP OCT. 2012
First thing to do is to ask my foreman what I need to do so that I can request to him the tools and the material’s what I needed for my assignment.
Analyzing the drawing is very important so that I can avoid some mistake and error, followed the rule’s and regulation of my company .then proceed to my task
After checking all the drawings and legends of the plan, working started like, cable tray support fabrication and installation according to each given measurements and location.
Cable tray installation and fabrication it depend upon the correct size and location of the tray, also performing the…….
Setting of the panel and marshalling panel cabinet, termination of instrument cable like analog and digital cables installation of various instruments termination of instrument cable from marshalling panel to field instrument.
Box setting of all the location of receptacle, switches, panel, telephone, cabinet and many others.
Glanding and termination of instrument cable both analog and digital cables also assigned in meggering and continuity testing installation of various types of instruments.
Wiring of all the circuits for lighting power/ receptacle, telephone, fire alarm and telecommunication line.
Panel installation according to each given measurements.
Fabricated elbow for cable trays including installation according to each measurement and scales.
Trouble shooting of all the wirings if there is some problems/ errors.
Checking of all the circuits.
Termination of all circuits according to the given circuit number.
Installation and fixing of all the devices in all area.
Energizing all the main supply and panels.
.
DUTIES AND RESPONSIBILITIES
NAME OF THE COMPANY…. GS ENGINEERING & CONSTRUCTION CO.
NAME OF PROJECT GREEN DEISEL PROJECT, TAKREER (UAE)
POSITION & CATEGORY….. ELECTRICAL TECHNICIAN FROM APRIL 18, 2010 UP TO APRIL 13, 2011
*First thing to do is to ask my foreman what I need to do so that I can request to him the tools and the material’s what I needed for my assignment.
*Analyzing the drawing is very important so that I can avoid some mistake and error, followed the rule’s and regulation of my company .then proceed to my task
*After checking all the drawings and legends of the plan, working started like, cable tray support fabrication and installation according to each given measurements and location.
*Cable tray installation and fabrication it depend upon the correct size and location of the tray, also performing the…….
*Piping layout for (G.I.) conduit pipe, PVC Pipe and Others.
*Box setting of all the location of receptacle, switches, panel, telephone, cabinet and many others.
*Wiring of all the circuits for lighting power/ receptacle, telephone, fire alarm and telecommunication line.
*Panel installation according to each given measurements.
*Fabricated elbow for cable trays including installation according to each measurement and scales.
*Trouble shooting of all the wirings if there is some problems/ errors.
*Checking of all the circuits.
*Termination of all circuits according to the given circuit number.
*Installation and fixing of all the devices in all area.
*Energizing all the main supply and panels.
DUTIES AND RESPONSIBILITIES
NAME OF THE COMPANY…. VOLTAGE ELECTRICAL CONTRACTOR CORPORATION
NAME OF PROJECT ST.LUKE HOSPITAL GLOBAL TAGUIG CITY M.M
POSITION & CATEGORY….. ELECTRICAL TECHNICIAN FROM AUGOST, 2 2008 TO 2009
*First thing to do is to ask my foreman what I need to do so that I can request to him the tools and . Analyzing the drawing is very important so that I can avoid some mistake and error, followed the rule’s and regulation of my company .then proceed to my task
*After checking all the drawings and legends of the plan, working started like, cable tray support fabrication and installation according to each given measurements and location.
*Cable tray installation and fabrication it depend upon the correct size and location of the tray, also performing the…….
*Piping layout for (G.I.) conduit pipe, PVC Pipe and Others.
*Box setting of all the location of receptacle, switches, panel, telephone, cabinet and many others.
*Wiring of all the circuits for lighting power/ receptacle, telephone, fire alarm and telecommunication line.
*Panel installation according to each given measurements.
*Fabricated elbow for cable trays including installation according to each measurement and scales.
*Trouble shooting of all the wirings if there is some problems/ errors.
*Checking of all the circuits.
*Termination of all circuits according to the given circuit number.
*Installation and fixing of all the devices in all area.
*Energizing all the main supply and panels
* Layout of Pipe 1/2, 3/
* Wiring of Smoke Detector
* Wiring of lighting system
* Wiring of Power and socket system
* Wiring of Speaker and paging system
* Termination of Distribution Board
* Termination of Power Panel Termination of Lightings, Fabricate of Cable Tray
* Wiring of 3 way and 4 way switch
.
EDUCATIONAL ATTAINMENT
PRIMARY
SECONDARY
TERTIARY
SR. C. RITA ELEM. SCHOOL
SURIGAO DEL SUR INSTITUTE OF TECH.
SURIGAO DEL SUR POLYTECHNIC STATE COLLEGE
SKILLS
CONSTRUCTION :
ELECTRICAL WORK’S
WELDER
INSTRUMENT INSTALLATION
TERMINATION LOW VOLTAGE
LANGUAGE :
Can SPEAK, WRITE and READ in, ENGLISH and FILIPINO fluently.
PERSONAL DATA
Nickname : BRYAN
Civil Status : MARRIED
Birthday : APRIL 22, 1983
Height : 169 cm
Birthplace: SASA DAVAO CITY
Weight : 56 Kilogram
Religion : ROMAN CATHOLIC
Nationality : FILIPINO
Passport : EC3734031
Exp. Date : MARCH 18, 2020
REFERENCE
MR.BOK LEE SITE MANAGER
SM POWERTECH CO.LTD.
MR.JIN YOUNG KIM GENERAL MANAGER
SM POWERTECTH CO.LTD.
E-MAIL: ********@*****.***
MR.SAN GU ADMINISTRATION MANAGER
SM POWERTECH CO.LTD.
E-MAIL: *****@***********.**.**
MR.JANG WANG NAM ELECTRICAL SUPERVISOR
SM POWERTECTH E&I
MR.JONG HOI CHOI ELECTRICAL SUPERVISOR
DAEWOO E&I COMPANY
MR.FROILAN TENA
ELECTRICAL SUPERVISOR
DAEWOO E&I COMPANY
Tel # +974-*******
MR. EUCLID S. SUMO
ELECTRICAL SUPERVISOR
SM POWER TEC E&I COMPANY
I hereby certify that the above information are true and correct to the best of my knowledge
MR. BRYAN VINCENT G. ORZALES