Brian Moreno’s resume *
**** ***** ****** ****** ***** Lane
Katy, TX 77494
rbmoreno@713-***-**** hotmail.mobile com
Profile Professional with expertise in fabrication and project management that safely delivers on- time quality subsea equipment. Delivers results by executing against demanding timelines, objectives and complex project challenges. Acts decisively by applying business rigor and judgment to make tough decisions by applying experienced engineering practices. Highly motivated, eager to learn, driven for success and adapts well to change in any environment.
Career History
1/14-9/15 BP America – Houston, TX
GPO GoM Subsea Fabrication Team Lead
Led a team of two BP staff and five agency contractors, to safely deliver and remained off of critical path of subsea equipment. Accountable of a $10MM annual fabrication budget, that spanned across (4) four projects. Developed the strategy with cost justification and executed the plan to sunset the fabrication site in Port Fourchon and relocate to Omega Natchiq in New Iberia, LA. Worked with Omega’s leadership team to transition BP managing the build of jumpers to Omega taking on more accountability by providing more quality and cost controls.
8/11-12/13 BP America – Houston, TX
GPO GoM Subsea Fabrication Jumper Lead
Managed a team of one BP staff, eight agency contractors, eleven third party vendors that delivered over 75 jumpers and installation equipment aides at BP influenced fabrication yard ( Fourchon Fabrication Site) in Port Fourchon, LA. Delivered a Total Recordable Incident Rate (TRIR) of 0.0, in which the site also was utilized as a shore base, marshalling site and emerging scopes of work.
7/05-8/11 Technip Offshore, Inc. – Houston, TX
Senior Project Specialist
BP Macondo, MC252 Incident
Macondo Close-Out Project Product Lead
Accountable for equipment cost evaluations, product guides and the physical handover of the manifolds, connector systems, goosenecks, choke assemblies, burst disc assemblies, adapter flanges, and flexible pipes to the Marine Well Containment Consortium
(MWCC). Managed cross company team, six suppliers and eleven contractors. Macondo Deconstruction Project (MDP) Product Lead
Decontaminated, refurbished and re-test the manifolds, connector systems, goosenecks, choke assemblies, burst disc assemblies, adapter flanges, and flexible pipes after the equipment was brought up to the shore base in Port Fourchon, LA. Managed cross company team, six suppliers and seven contractors. Knowledgeable of BP GoM Safe Practices Manual and referenced during HAZID sessions, Job Safety Environmental Analysis and risk associated with work tasks.
Containment and Disposal Project (CDP) Manifold Delivery Engineer
Safely designed, manufactured, tested and installed offshore a six hub manifold with hydraulic and chemical injection circuits and six ancillary pieces of equipment (fabricated by Cameron-Berwick, LA) in less than one month. Created a manifold ancillary equipment manual, Lessons Learned document, Offshore Work Plans, Operation Notes and deconstruction plans. Managed cross company team, two suppliers and two contractors.
Brian Moreno’s resume 2
BP Atlantis
Project Engineer for the Cross-Over (XO) PLEM
A manifold with electrical and hydraulic controls, and chemical injection. Coordinated the design and scope of work for nine vendors, as well as managed tasks, resources and dependencies.
Offshore experience as a Challenger (college graduate) Mentor for the North Flank, PLET pin pile jetting installation campaign on board Transocean’s Drill Developer II- GoM Green Canyon 743
Drafted FMC bid packages for SS-2 manifolds and TP PLEM, which consisted of functional specifications and scope of work
Lead Site Engineer in New Iberia, LA for fabrication and Factory Acceptance Testing (FAT) of PLETs and PLEMs
Expedited PLET components from OEMs by explaining Lean Manufacturing, one piece flow techniques
Wrote bid package specifications for 10ksi subsea swing check valve and the insulation shrouds for MAX-8 and MAX-14 connectors
Participated in System Integration Testing (SIT) for the subsea architecture, FAT of the PLET Subsea Pull In System (PSPS), Subsea Pig Launcher/Receiver and Long Term Pressure Caps (LTPC), manifold deck pressure testing, HAZIDs and HAZOPs for the manifold preservation
Created Functional, Fabrication, and FAT Specifications for PLETs, PLEMs, manifolds, flowline jumpers and well jumpers
Assist the Manifold Tie In System (ManTIS) BP Lead in all aspects of the manifolds, PLETs, PLEMs, jumpers and PSPS including review and approval of documentation and coordinating contractor efforts
BP Dorado
Produced Scope of Work document for the well jumpers to be manufactured and tested in Port Fourchon, LA. Completed this task in one week and began fabrication before scheduled commencement.
BP Mardi Gras Transportation System
Hydrate Remediation Team, Pressure Testing Lead, New Iberia, LA. Member of a five man team that designed, fabricated, tested and delivered a pipe line hydrate by-pass system in one month. Utilized resources from Omega, FMC, Oil States, and Oceaneering to successfully obtain First Oil for Atlantis in October of 2006. 12/03-7/05 Ameri-Forge Group Inc. – Houston, TX
Manufacturing Engineer
Performed Cost Analysis and created justifications on purchasing $1.5 million worth of CNC production machinery
Project Manager for NYC Subway Project
Quoted machining times for potential projects
Determined speeds and feeds and tooling packages for special projects
Reduced set-up times and increased through put by incorporating a Lean Plant layout Powell Electrical Manufacturing Company - Houston, TX 1/01-5/03 Project Manager - Sales
Manage multiple million-dollar projects simultaneously
Sole Project Manager for BP America Deepwater Development Programs
Adhered to contractual terms and conditions and customer technical specifications
Quoted project change orders and negotiated commercial issues with customers
Coordinated project budgeting, scheduling, manufacturing and post shipment inquires
Committed to meeting the expectations of the customer’s requirements and being responsive to their varying needs
Secured the customer relationships to maximize profits for the company 1/98-1/01 Manufacturing Engineer
Project Engineer Coordinator for Pratt and Whitney Power System Brian Moreno’s resume 3
Responsible for copper fabrication, PVC process, vacuum circuit breaker assembly, Power Control Room assembly, and bus duct assembly departments.
Member of a ten-month competitive bidding team resulting in savings of $1.3 million
Participated in Kaizen Events both in and outside my areas of responsibilities
Experience with CNC bus bar fabricators, CNC press brakes and mechanical punches
Facilitated numerous productivity improvement teams
Kept various Environmental and Safety records
Drafted process procedures per ISO 9001 standards
Created Capital Budgets for responsible departments
Accountable for part routing and costing
Education
Texas A&M University- College Station, TX
Bachelor of Science - Manufacturing Engineering
December 1997
Professional Development
BP Houston Citizen Action Program Council- Co-Chair, 2013-2015
Transportation Security Administration, Transportation Worker Identification Credential 2008-Present
SafeGulf - Safety Awareness Orientation, 2007
Society for Underwater Technology Subsea Seminar, Key Elements of Subsea Tiebacks, 2007
BP GoM License To Go Offshore Orientation; 2005
Texas A&M University System, Sea Survival, Helicopter Safety & Egress; 2005- Present
Kennametal University, Comprehensive Application Engineering Course; 2004
Society of Manufacturing Engineers, President’s Circle; 2003
Baker Communications, Win Win Negotiations; 2002
Society of Manufacturing Engineers, Lean Manufacturing Challenge, 2002
Society of Manufacturing Engineers, HOUTEX Exhibitor Advisory Committee, 2002
Society of Manufacturing Engineers, Past Chair- Houston Chapter 29; 1999-Present
Recipient of SME Student Chapter 99 Alumni Certificate of Appreciation; 1998
Association for Manufacturing Excellence, Member number- 44020; 1998
Continuing Education Credits SME Fab-Tech Classes1998, Advanced Project 98/2000- 2001