Over 9 years of experience in the Oil and Gas/Construction Industry. Detailed oriented and highly motivated Estimator/Cost Analyst with a solid track record of successfully Estimating and Budget Managing construction projects. Backed with a degree in Construction Science.

Education

Graduated 2006 with BS Construction Science, Prairie View A&M University

Professional Experience

Baker Concrete Construction – Project Engineer/Project Controls 06/15 - Present

Tenaris Pipe Mill $60MM

Processed Change Orders and T&M Ticket Work.

Scheduled daily concrete pours through meetings with Concrete Supplier and Client.

Requisitioned/Procured all embedded material per concrete schedule.

Processed and submitted timesheets for 300 plus employees. Monitored usage of cost codes per crews.

Managed Payroll and issued pay checks weekly

Utilized Procore to submit RFIs, Concrete Requests, Change Orders, and Daily Reports.

Utilized Box, Bluebeam, MS Excel, and MS Word.

Submitted weekly Change Order Reports

JE Dunn Construction Company – Project Engineer 2 03/14 – 09/15

Sovereign Luxury Apartments $66MM

Processed over $350K of external Change Orders and T&M Ticket Work.

Back charged contractors over $125K for damages.

Generated meeting minutes and agendas for subcontractor progress weekly meetings and Owner/Architecture meetings.

Managed multiple subcontractors and scopes of work at one time.

Processed change documents and submittals.

Assisted project managers with closeout and ensured that all documentation was submitted to the client per the specifications.

Worked closely with Owner, Architect, and Subcontractors daily.

Utilized CMiC to generate change orders, create reports, and to create meeting minutes and agendas.

Utilized Bluebeam to markup drawings and estimate/takeoff various assignments.

Designed and suggested ideas for problems in the field that required a RFI (Request for Information) from the Architect.

Worked closely with the Chief Estimator for proposals.

Created and issued safety orientation letters to subcontractors per JE Dunn’s Contract and OSHA’s requirements.

Cameron Subsea Manifolds – Sr. Cost Analyst 10/11 – 12/13

BP Angola $47MM

Petrobel Deka 28.5MM

Plant Cost Analyst assigned to $30 million plus projects.

Analyzed actual labor, material, and overhead cost against Standard/Budget.

Provided monthly Man Hours, Material (MEL), and Travel & Expense reports for projects.

Forecasted Man Hours/Cost, Travel & Expenses, and provide Estimate at Completion (EAC) for Equipment. Forecasted within 15% of Actuals.

Created Historical Data for the Manifold Cost Analyst Group.

Processed Management of Change (MOC) which includes writing the narrative and calculating hours/cost.

Created MOCs with both Ecosys software and Microsoft Excel program.

Utilized SAP (CADO, KSBT, KSB1, ME23N, CJI3) to gather project information.

Utilized Sharepoint to submit monthly reports and to send MOCs Approvals through Workflow to upper management.

Worked closely with Procurement and Schedulers

Followed-up with Procurement Dept. and end users to obtain commercial information required and/or needed to complete the projects.

Analyzed invoices against purchase order and user requests and resolves discrepancies with Procurement Dept.

Performed tasks outside of my job description to support the team.

Worked closely with the Client, Subcontractors, and Site Team.

City of Houston – Field Supervisor 02/10 – 10/11

Supervised utility maintenance workers.

Q/A completed work out in the field such as service line, water meter, and fire hydrant repairs/installations.

Updated daily reports using IMS software and Microsoft excel.

Monitored and review charge codes and timesheets.

Coordinated and schedule repairs/installations in the field.

Generated work orders and change orders for jobs.

Customer Service to ensure that their needs were being met by the City of Houston.

Ensured crews worked in a safe environment per COH and OSHA requirements.

MUSTANG ENGINEERING - Estimator 02/07 – 11/09

Provided cost for equipment and labor for grassroots and revamp projects.

Prepared estimates using Excel, Access, and Filemaker Pro databases.

Utilized extensive usage of historical data and procedures related to various projects.

Performed estimate reviews with Executive Management and key personnel.

Development of conceptual estimates and estimate validations ranging from $10MM - $65MM.

Gained onsite/field experience through continuous onsite reviews and walk downs.

Estimated piping, civil/structural, and electrical projects.

Read P&IDs for material take-offs.

Performed tasks outside of my job description to support the team.