RESUME
MOHD. SABIR SHEIKH
MECHANICAL ENGINEER
MOB. : 963-***-****
HOME: 922-***-****
E-MAIL ID: acwves@r.postjobfree.com, acwves@r.postjobfree.com
PERMANENT ADDRESS : S/o. Dr. M. G. SHEIKH
AT – SAKARLA, POST – DAHEGAON (JOSHI)
TAH. – PARSHIVNI, DIST. – NAGPUR (M.S.)
PIN CODE – 441105.
EDUCATIONAL QUALIFICATION: B.E. (MECHANICAL ENGINEER)
DISCIPLINE
YEAR
UNIVERSITY
NAME OF SCHOOL
AGGREGATE
B.E. (FINAL YEAR)
S’2004
NAG. UNIV.
K.I.T.S., RAMTEK
76.66%
DIP. (FINAL YEAR)
S’2001
B.T.E.
G.P. SAKOLI
75.16%
H.S.S.C.
S’1997
PUNE
J.V. KHAPA
51.67%
S.S.C.
S’1995
PUNE
K.P.V. PARSHIVNI
72.41%
LANGUAGES KNOWN : ENGLISH, HINDI & MARATHI
COMPUTER KNOWLEDGE : BASIC, EXEL, WORD, INTERNET
HOBBIES : LISTENING MUSIC, READING, PLAYING CRICKET.
WORK EXPERIENCE : 4 YEARS IN REFRACTORY CEMENT
4 YEARS IN FABRICATION & ERECTION OF HYDRO
MECHANICAL ELEMENTS
CURRENT JOB – MAINTENANCE INCHARGE IN A TEXTILE MILL
1)SHANARK INDUSTRIAL PVT. LTD., BUTIBORI.
Details: I WAS WORKING AS A SHIFT ENGINEER FROM OCT. 2004 TO APRIL 2008. MAIN PRO DUCTION OF HIGH ALUMINA REFRACTORY CEMENT & CASTABLES. THERE ARE TWO ROTA RY KILNS, CONTINUOUS BALL MILL, and BATCH BALL MILLS & NODULISER MACHINE.
2)UNIVERSAL HYDROSTRUCTURE PVT LTD, NAGPUR HERE IS THE PRODUCTION OF M.S. PIPES, STRUCTURE AND FOOT BRIDGE FABRICATION WORK & GATES EMBEDDED PARTS FABRICATION. I AM WORKING HERE AS A SITE ENGG. SINCE FROM MAY 2008 TO JULY 2012.
3) PRESENTLY WORKING WITH: SURYAAMBA SPINNING MILLS LTD.,NAYAKUND
I AM WORKING AS A MAINTENANCE INCHARGE SINCE AUGUST 2012 TO TILL DATE.HERE POLYSTER YARN PRODUCTION IS CARRIED OUT.
VARIOUS MACHINES KNOWLEDGE-
B 6/1,MBO,MBO 3/6,B 5/6
LC 1/3,LC 100,LC 300,LC 300 AV3,LC 333,LC 361
DO 2S,DO 6,RSB 851,LD 2
LF 1400,LF 1400A,LF 1465
G 5/1,LR 6,LR 60A,LR 60AX,LR 9AX
MURATA 7V,21C,SCHILAPHORST 238,RJK CONE WINDING.
VERSA WINDER, TFO MACHINES.
MY RESPONSIBILITIES ARE:
TO PLAN MAINTENANCE SCHEDULE.
TO PLAN CONSUMABLES ITEMS.
TO MANAGE MANPOWER ACCORDING TO THEIR SKILL.
TO CHECK & INSPECT RAW MATERIAL PLAN, INVENTORY, STOCK,
TO COMPLETE MAINTENANCE SCHEDULE IN A STIPULATED TIME PERIOD.
FLEXIBLE AS PER REQUIREMENT.
TO INCREASE PRODUCTIVITY BY REDUCING BREAKDOWN.
. TO ATTEND & MAINTAIN THE ENTIRE MACHINES.
. AS PER PRIORITY WORK TO BE CARRY OUT.
. OPTIMUM UTILIZATION OF MAN, MACHINES & METHOD.
OBJECTIVES:
a)TO WORK IN A TECHNICALLY SOUND & INNOVATIVE ENVIRONMENT.
b)TO FORMULATE POLICY FOR INCREASING PRODUCTIVITY.
c)TO ACHIEVE ORGANIZATION GOAL.
d)TO LEARN VARIOUS PROCESS WHICH ENHANCE CAREER DEVELOPMENT.
e)TO MOTIVATE THE WORK FORCE TO GET WORK DONE.
LAST DRAWN SALARY : 20000 p.m. Plus Allowances
EXPECTED SALARY : NEGOTIABLE
DECLARATION:
I DECLARED THAT THE ABOVE INFORMATION IS TRUE & CORRECT TO THE BEST OF MY KNOWLEDGE.
PLACE: SAKARLA MOHD.SABIR SHEIKH