CURRICULAM VITAE
Personnel:
Mohammad Nasir Khan
S/O-Mohammad Bashir
Nationality-Pakistani
Passport No-LU4104891
Marital Status-Married
Language-Urdu-English-Arabic
Tel No-009*-***-******
Mob No-0092-333-***-****)-300-***-****)-345-***-****)
E-mail *******-*************@*****.***
Permanent Address-Village-Shah Kahil Ghari-Distric-Mansehra N.W.F.P Pakistan.
Qualification:
Matriculation BISE Peshawar
SSC BISE Peshawar
Technical Qualification:
Diploma of Associate Engineer (Electrical). Technical Board Karachi
PROJECT:
ABB(sae sadlmi Italy) Jabel Ali Power/Desalination Plant in Dubai (U.A.E) as a
Electrical Forman in years 23-10-1995to22-10-1998.
JOB DESCRIPTION:
Cables Gladding &Termination,Power/Control &Instrument + Loop Testing Electrical & Control 33KV BLDG, 220KV BLDG, ADMIN BLDG, Firefighting BLDG Central Control Room,415V Sw Board 6.6Kv Sw Board, Gas Turbine Power Control Unit, Installation Cable Tray,G,I Conduit & Cable laying from C.C.R to Field.
PROJECT:
INSALDO (energia-Italy) Mirfa Power/Desalination Plant in Abu Dhabi (U.A.E)
As a Electrician in year26-10-1998to11-03-1999.
Electrical Forman in year 26-10-1998to11-03-1999.
JOB DESCRIPTION:
Cables Glanding & Termination, Power/Control & Instrument + Commissioning &Penal Erecting in Control Room.
PROJECT:
SNEF GROUPE(France)Cement Plant in Ras-al-Khaimah(U.A.E) as a Commissioning. Forman in year 15-03-1999 to 30-06-2000.
JOB DESCRIPTION:
Commissioning & Testing Control/Power Panel, Loop Testing, Use Mugger, Multi mater, Fire Alarm & Cables Loop Testing Substation to Field.
PROJECT:
METITO(Over Seas Limited) Waster Water Treatment Plant; Ruwas Abu Dhabi(U.A.E)
As a Electrician in year 01-08-2000 to 02-09-2001. Electrical Forman in year 01-08-2000to02-09-2001.
JOB DESCRIPTION:
Cable Glanding & Termination Power/Control; Panels Installation, Loop
Testing & Cables Laying Substation to Field.
PROJECT:BK GULF(LLC) Jable Ali Power/Desalination Plant in Dubai (U.A.E) as a Electrical
Forman in year 22-09-2001 to 15-10-2002.
JOB DESCRIPTION:
Sw, Gear / Control Panels Installation, Cables laying Power, Control &Instrument
From Substation to Field & C.C.R to Field. Cables Testing & Loop Testing. T/F Installation of 11KV.
PROJECT:
SAUDI ELECTRICITY COMPANY :Saudi Arabia (SHUT DOWN) in Bin Ladin (Saudi Serves) as a Electrician in Period 15-10-2004 to 02-03-2005. Electrical Forman for the Period,15-10-2004 to 02-03-2005.
JOB DESCRIPTION:
Supply Lighting in Project Maintenance in Sw. Gear Panel, Control Valve, Trans mater, Switches.