Post Job Free

Resume

Sign in

Piping Site Engineer

Location:
Lipa, CALABARZON, 4217, Philippines
Posted:
September 26, 2016

Contact this candidate

Resume:

Antonio R. Delmo

Piping Lead Engineer

Summary: Over twenty two (22) years of experience in the field of engineering such as Front End Engineering Design, Detailed Engineering and Construction of Refineries, Petrochemical Plant, Pharmaceutical, Semi-conductor Industries, Water Treatment, Power and Industrial Plant. With wide knowledge in using international codes and standard. Capable of using different software such as Micro Station, PDS, SP3D, PDMS, Smart Sketch, Navis Work and Optimeyes. Specializes in the following:

Preparation of Piping Procedure.

Unit Plot Plan, Equipment Layout, Pipe Rack Layout

Nozzle Orientation

Pipe Support and Basic Stress Analysis

Piping Study and Preparation of Piping General Arrangement

PDS generated Isometric Sketch and Drawing Preparation

SP3D generated Isometric sketch and Drawing Preparation

Technical Bid Evaluation and Vendor Drawing Review

Specific Experience

FLUOR DANIEL, INC. (Dec. 5, 2007 to present)

Asian Star Building. Alabang, Muntinlupa City

Piping Lead Engineer PTTGC AMERICA Feed Project

Nov. 04, 2015-Present Petro Chemical Complex

Dilles Bottom Ohio

Primary function is to lead the Pre FEED Phase of the Project using Optimeyes software.

Responsible to deliver high quality of MTO since this is a competitive bidding project and in consideration of a Lump Sump project. One of the strategy implemented to the project is modelling all lines to avoid manual manipulation vs CWP & Modular index. Do the man-hour estimate for the engineering Hrs required based on on the current Optimeyes model.

Ensure that all deliverables are submitted on time. Do the coordination for the issues and concern of the project to the client. Responsible for the cost saving analysis for the piping related cost of labor and materials of the project.

Piping Lead Engineer Lemongrass Menthol Project

Nov. 25, 2013 – Sept 30, 2015 Kuantan Integrated Site

Kuantan, Malaysia

Primary function is to lead the FEED and Detailed Engineering design of piping works. Do the man-hour estimate and control the budget hour of the project. Ensure that all deliverables are submitted on time. Do the coordination for the issues and concern of the project to the client. Responsible for the cost saving analysis for the piping related cost of

labor and materials of the project. Responsible for all piping related activities of the project including support for the construction.

Area Lead /Lead Checker SADARA PROJECT – CHEM II

July 9, 2012 – Nov. 22, 2013 Al-Jubail, Saudi Arabia

Primary function is to improve design from feed to detailed engineering design in accordance to project standard and licensor requirements. Supervision and mentoring designer’s daily activities.Responsible for the preparation and actual model review with the client. Managed the Model review comment resolution in coordination with other discipline. Ensure that all model tags have been approved prior to issuance of isometric. Responsible for the technical issues arises during the isometric checking.

Area Lead SUPER ABSORBENT POLYMER PROJECT

April 04, 2011 –July 6, 2012 Al-Jubail, Saudi Arabia

Primary function is to improve design of the area of responsibility in accordance to project, client and licensor requirements. Supervision and mentoring designer modelling of piping system. Do the communication about issues and changes to meet the process requirements. Resolving all review comments that will satisfy client requirements. Work interface with all discipline. Monitoring of work progress of the designer on a weekly basis. Checking of SPR to verify if line had been routed base on code and standard. Pink off - Yellow off P&ID.

Area Lead/Checker SATAH AL RAZBOOT (SARB)

(Sept. 6, 2010 - March 2, 2011) Artificial Island Field Development Project

Abu Dhabi, UAE (Offshore)

Primary function is to prepare feed stage transposition with a total of 86 Well Heads from two Artificial Island. Checking of plot plan base on codes and standards. Supervision of piping modelling using optimeyes as per given info such as P&ID’s, plot plan and some sketches from client as reference. Do the communication about issues and changes to meet the process requirements. Resolving all review comments that will satisfy client requirements. Work interface with all discipline. Monitoring of work progress of the designer on a weekly basis. Checking of SPR to verify if line had been routed base on code and standard. Pink off - Yellow off P&ID. Do the manual sketching of small bore for MTO purposes as part of scope of work..

Checker/Senior Designer LDK Polysilicon Project

(Aug. 11,2010 – Aug. 31, 2010) Xinyu City, Jiangxi, China

Primary function is to label the Piping Plan prepared by the designer and do the first check.

Coordinate with the designer regarding some changes for the drawing index and elevation during the process of doing the piping plan. Do back check for final checking prior to issuance of the piping plan.

Area Lead/Checker Lubrizol Additives

(Jan. 19, 2010 – July 18, 2010)) Tianjin China Plant

Zhuhai, Guanqdong, China

Primary function is to prepare feed stage transposition of two Area of responsibility including DA PIBSA Area and Utility Area. Supervision of piping modelling as per P&ID’s . Do the communication about issues and changes to be done to meet the process requirements. Resolving all review comments that will satisfy client requirements. Checking Plot Plan arrangements based on codes and standards. Monitoring and reporting progress of work done by the designer on weekly basis. Work interface with all discipline. Line to line checking of model based on P&ID and line list. Update P&ID and Line list for all the changes made. Pink off- yellow off P&ID.

Checker/Senior Designer Dow Corning

( Feb. 26, 2009 to Jan. 18, 2010) Third Pillar Project

190 kt/a Seloxane

Zhangjiagang (Phase 2), China

Primary function is to do the first check of isometric produced by the designer based in Shanghai, China and ensure that all codes and standards, categories, client regulation, requirements and procedure such as annotation, supports, instruments, spacing, master P&ID check, material specs, clearance compliance, specialty items, support and stress, vents and drains, MTO check, mark number, isometric continuation, SPR check and the design practices have been met. NavisWork Model had been used also for isometric checking as reference.

Checker/Senior Designer IPS 2 Expansion Project

( Jan. 26, 2009 to Feb. 16, 2009) BASF YPC Company Ltd.

Nanjing, China

Primary function is to provide sketch of the line routing base on Area and Line requirements as reference of the designer to do the optimeyes layout for estimate.

Checker/Senior Designer Marathon Garyville Major Expansion Project

( Jan. 3, 2008 to Jan. 23, 2009) Marathon Refining Company

Louisiana, USA

Primary function is to check isometric produced by the designer to ensure that all codes and standards, categories, client regulation, requirements and procedure such as annotation, supports, instruments, spacing, master P&ID check, material specs, clearance compliance, specialty items, support and stress, vents and drains, MTO check, mark number, isometric continuation, SPR check and the design practices have been met.

BIO SOURCE INC.

October 1999 – August 2005

Project Supervisor

PROJECT HANDLED:

Stephan Philippines

-Installation of piping system of ammonia lines, controls and instruments,

Including testing and commissioning.

-Upgrading of PLC controller for the operation of Water Treatment Plant and Ammonia System.

- Rehabilitation of Dryer and installation of additional steam tracing.

St. Thomas Square Mall

- Installation of water system and fire fighting system.

Wyeth Philippines

- Supply and installation of additional Demineralized Water Treatment Plant

including supply and distribution line for boiler feed.

-Rehabilitation of waste treatment plant including installation of UV, Ultra Sonic level transmitter, chemical feed pump and Diffusers.

-Re-piping of water lines from Galvanized pipes to Stainless pipes.

United Laboratories

-Turn key Project of Automatic Deionizer for Liquid Department.

-Turn key project for Neutralization process for Waste Treatment Plant

AQUA TECHNOLOGIES, INC.

1501 Sto. Sepulcro Street, Paco, Manila

May 1992 – Aug 1999

Project Supervisor

Projects Handled:

-Mc Donald’s water treatment

-Batangas Power Plant (ENRON PROJECT) supply of Skid Deionizer for water cooling system flashing.

RCM CONSTRUCTION

In-house Contractor

Shell Tabangao, Batangas

Project Engineer

Project Handled:

- Fabrication of Flat-form for Satellite Antenna at Shell Housing.

- Rehabilitation of piping system at Clark power plant.

ISLAND GAS AIR PRODUCT

Project Engineer

-Installation of LPG supply lines to clients.

TIGER CEMENT MANUFACTURING COMPANY

- Raw and Finish Mill Supervisor.

Training:

1.Health and Safety (DTI)

2.Phase III – Piping Engineering Checking – Isometric ( Fluor Daniel Inc, Philippines )

3.Smart Plant Review ( Fluor Daniel Inc, Philippines)

4.Phase III – Plot Plan Layout ( Fluor Daniel Inc, Philippines)

5.Smart Sketch Training ( Fluor Daniel Inc, Philippines)

6.PDMS Training ( Fluor Daniel Inc, Philippines)

7.3rd Generation Modular Execution (Fluor Daniel Inc. Philippines)

8.Fluor’s Quality Management System and Internal Quality Audit (FDIP)

9.Lead Office Mindset Training

10.DDI Leadership Training

Personal Data:

Date of Birth : June 13, 1968

Place of Birth : Bauan, Batangas

Sex : Male

Height : 1.70M

Weight : 100kgs

Civil Status : Married

Citizenship : Filipino

Religion : Roman Catholic

Home Address : B2L1 San Antonio Village

Bolbok, Lipa City

Batangas, Philippines

4217

Email Address` : acwrxm@r.postjobfree.com

Mobile Phone : 063**********



Contact this candidate