Intend to build a career with leading corporate of hi-tech environment with committed & dedicated people, which will help me to explore myself fully and realize my potential.Willing to work as a key player in challenging & creative environment.
EDUCATION
ØB.Tech in Electrical & Electronics Engineering
Sree Narayana Mangalam Institute Of Management & Technology
MG University
ØDiploma in Electrical & Electronics Engineering
Sree Rama Poly technique college,
Tripyar
Autocad& Primavera
WORK EXPERIENCE : - Total 3 .5 years
COMPANY : - Venus General Maintenance Contracting LLc, Ajman
2016 April - Present
Position : Electrical Engineer
oChecking, studying of site drawings, arrange materials required, Managing labour .
oArrange required work permits, gate passes, temporary connections .
oRequesting and arranging materials time to time.
oConducting Tool box meeting among workers.
oSupervise all electrical maintenance works, checking all works done by works regularly.
oArrange and manage technicians and helper different locations, areas and sites according to the work priority .
oConsult and clear doubts in clear from senior.
oInform all work obstructions in sites to the Senior and take immediate action .
oCalculation of Total Man hour and extra works done .
oAssist senior in billing, tender quoting .
oVisit new site with senior and assist and follow his commands In new work site.
Company : Reshmi Engineers
Position : Electrical Field Engineer
oSupervision of Electrical Installation works of Various Buildings, Schools and High rise buildings.
oHigh Rise buildings electrical wiring, all electrical and communication systems installations .
oThorough knowledge of Electrical wiring, Panel erection, Installation, Earthing installations, Control wirings, Cable laying and Installation of Low current systems.
oChecking, studying of site drawings, arrange materials required, Managing labour .
oArrange required work permits, gate passes, temporary connections .
oRequesting and arranging materials time to time.
oPreparation of bill of quantities and Calculation of Total Man Hour in the weekend.
oCo- ordinate with client and consultant, make changes according to the comment drawing from consultant.
oSupervising and Installation of Transformers, Generators, HV & LV Panels according to drawings and erection manuals.
oSupervising and Installation of cable tray, laying of H.T & L.T cables.
oInstallation of conduits, electrical wiring of flats, industries and lighting works.
oSupervision of HT & LT Cable Joining (Splicing) & Termination.
oSupervision in erection of foundations, trenches, fencing including roof for transformers, panels, RMUS etc.
oPreparation of measurement and verification at site with client.
oEarthing and lightening arrestor Installations.
oInstallation of LV panels and Distribution Panels.
oDP Structures and Transformer Installations.
oStreet lighting and poles installations.
oInstallation of power sockets, RJ45, all electrical and communication accessories required in flats.
oSupervising of fire alarm system works, telecom and communication works.
oMaintenance of Electrical accessories.
oPreparation of as built drawing and documents for the projects .
oEvaluate materials used and total man hour and communicate with senior .
oPreparation of measurement and verification at site with client.
oLighting system installations Power & Telephone System installations.
oMV control panels,DBs, Switch Board installation
oMaterial review and take off.
oPreparation of Material submittals and specification.
oSupervision in erection of foundationsof Transformers
Company : SFO Technologies Pvt Ltd, Kakkanad
Position : Trainee – Cable & Wire Harness Division.
Good Hands on experience in following activities
Perform –Insulation Stripping, Crimping,Soldering, Heat shrinking, Wire forming, Jacket stripping,labeling, House Insertion, Tie wrapping, Tinning, Packing
SKILLS:
.Computer Skills : MS Office, AutoCAD, Primavera
Language Skills : English, Hindi, Malayalam
(Read, Write & Speak)
PROJECT:
A PROJECT ON ENERGY CONSUMPTION-
As a part of energy saving we decided to provide energy audit in light and power fittings of our institution.we divided the whole institution into different blocks and calculated energy consumption .then we suggested new measures to improve illumination by providing new fittings or replacing old ones with energy star rated power saving equipments to reduced energy consumption.
SMART POWER DISTRIBUTION SYSTEM
Smart power distribution system monitor the electric energy consumed by customers, cut off heavy loads during peak hours if demand exceeds allowed maximum demand. This system is designed to be used in single phase domestic connections.
References
P F Antony
Reshmi Engineers
Kattikkaran Road, Cochin 682018
Ph. :048*-*******
DECLARATION
I hereby declare that the data furnished above are true and correct to the best of my knowledge and understanding.
Place: Thanking You
Date: NIMESH THOMAS K