BADERINWA MOJEED UCHE ****************@*****.***
BSS/TX Engineer ***************@*****.***
B.Tech Physics Electronics +234**********,070******** +229********
Federal University of Technology, Akure (FUTA) 2005 To 2010
Professional Profile:
Senior-level Telecommunication professional with comprehensive Technology
Management/Technical skill set and expertise in GSM, EDGE, QOS and
Transmission.
Customer-focused, highly organized self-starter with effective customer-service
Skills and demonstrated ability to manage customer solutions, build relationships,
Communicate solution strategy and product offerings, and provide technical
Expertise, support, and training to customers.
Objective:-To pursue excellent career with opportunities and development in all positions with a
focus on being the very best in whatever I do and to ensure high customer satisfaction so as to increase company profit while working with colleagues and subordinates with little or no supervision(Over 5 years Experience as an IT Support, Telecoms Installations Engineer, Networking & Engineering Activities).
Seminal/Training
BTS and D2U + RRH 3G (2G and 3G) installation and integration, Etisalat project, Training certified BY ALCATEL-LUCENT TELECOMMUNICATION NIGRRIA LIMITED- 2012.
Microwave installation and BBU 3900 and RRU installation (RTN 950 and 980 series) NODE B, HUAWEI Equipment for LTE (Long Time Evolution), certified Training BY HUAWEI TELECOMMUNICATION NIGERIA LIMITED-2013, 2015, 2016.
Microwave and Aviat Radio installation, RF installation and Ericsson RBS (2000 and 6000) installation and integration 2G and 3G, certified Training BY ERICSSON TELECOMMUNICATION NIGERIA LIMITED-2013.
PROFESSIONAL EXPERIENCE
®Freelance contractor SIMBA May 2016 till day
Responsibility,
Installation and configuration of RTN 950 radio and microwave pure Transmission on NTN project
®Freelance contractor MP Infrastructure LTD April 2016 Till date
Plot 25, Block 68 Bisola Durosinmi Etti Drive Lekki Phase 1 Lagos
Designation- Engineer and installer
Responsibility,
Installation of RF and Microwave with Huawei RTN radio and configuration with fiber MTN project
Installation of RF and Microwave and configuration, and Rectifier with battery back with NATCOM project
Alarms clearing on both RF and Transmission
®Freelance contractor VERVEBA TELECOMS LTD Sept 2015 till date
Aluminum Tower, Oba Akran Road, Ikeja Lagos.
Designation – Engineer and installer
Responsibilities,
RF and Transmission Installation of 2G/3G stand alone MTN project
RF and Transmission installation of LTE (4G) smile project
RF and Transmission installation on 2G/3G on Airtel project, sweep after finish installation
FINCON ENGINEERING NIGERIA LTD Feb - Aug 2015
2nd floor Catholic mission Street, Opposite Zenith Bank plc Lagos,
Designation- Project coordinator
Responsibilities
Active and passive maintenance for MTN Benin Republic, with alarms clearing both on RF and Transmission
Both power and Telecoms
Link monitoring, TCP/IP, remote site troubleshooting
Designation- Project Engineer July - Oct 2013
Responsibilities
Building of link for DOPC (Direct on PC) with Caragon Radio, (installation and integration of microwave and Caragon radio and RF, BTS both 3G/ 4G with fiber optic commissioning)
Clearing of alarms.
Ensure that records and documents are filed and managed in accordance with the standard procedures
Ensure that non conformances are being recorded and corrective actions taken as necessary
Ensure that only current plans / PL4 and documents are used for implementation
®Freelance contractor MYD TELECOMS 2014 till Date 2015
26 Ajasa Street, Onikan, Lagos Island Lagos.
Designation- Installer and Engineer
Responsibilities
Establish new link with microwave radio and Ericsson MMU both 1+0, 4+0 Xpic configuration, hub decongestion, and alarms clearing on both 2G/3G Airtel project
Airtel and MTN installation of 2G/3G, with Transmission
LM ERICSSON NIGERIA LIMITED July – Dec 2014
Plot 1391 Tiamiyu Savage Street, Victoria Island, Lagos.
Designation- Site Supervisor
Responsibilities
Supervise ASP onsite installation both RF, RBS, microwave antenna
Both installation and integration both 2G/3G, RF and RBS and Microwave with Aviat radio and Rectifier and battery back up on MTN project
Hub the congestion with Ericsson radio on Airtel project
Sign Site acceptance for ASP (ATP)
®Freelance contractor LINKINS LIMITED 2013 – July 2014.
Responsibilities
Establish new links with microwave and Huawei RTN 950 radio, installation and configuration.
Expansions both 3G and 2G, installation of RRU and BBU 3900 Airtel and MTN project with Huawei equipment both RF and fiber optic.
®Freelance contractor HORPE_NET LIMITED Date-2013 Till 2015
38 Lanre Awolokun street Gbagada Phase 2 Lagos.
Designation-Transmission Engineer
Establish new links with microwave and Ericsson AMM radio, installation and integration on Airtel project in Lagos.
Ensure that only current plans / PL4 and documents are used for implementation.
Installation of 3G with RRU and Transmission with Ericsson equipment
Alarms clearing on both 2G/3G and Transmission
®Freelance contractor NOVAS SYSTEM LTD Date- till 2013
No. 17B Emmanuel high School Street, Ogudu Road Ojota, Lagos.
Responsibilities
Microwave and Aviat, Caragon, Radio installation and integration for MTN, and RF and BTS installation and commissioning .
Link monitoring, TCP/IP, remote site troubleshooting.
Carryout Technical Site Survey (TSS) of proposed projects.
Carryout Line o site LOS
Bluechip Telecommunication May 2011- Jun 2013
Designation-Support field engineer
Monitoring in the Hub room, performing data backups and monitoring network server performance, Customer oriented communication/call escalations/support
Responsible to plan, implement and maintain daily Hub Room smooth functionality
Monitoring the Power backup and hybrid
Coordinating Field Engineers to resolve Transmission, Power & Bts problems on, Etisalat, Corrective Maintenance Project, Lagos region.
Troubleshooting transmission problems and resolving them like ODUs, IDUs, LOS, AIS, and Link fluctuations.
Maintenance of Hub, link and backup site
Clearing of VSWR alarms on BTS
Clearing of in path balance alarms
HUAWEI project on LTE project, Lagos/Ibadan region May to Aug 2013
Designation-BSS engineer
Responsibilities
Microwave installation and BTS 3900 installation (RTN 900 and 910 series) for LTE (Long Time Evolution)
1+0 now protection configuration
1+1 protection configuration, hot standby backup (HSB) and space diversity (SD)
Implement project on LOS survey for point to point and point to multi-point digital microwave links
Develop scope of work for special projects and monitor workflow within the project
ERICSSON project on MTN and AIRTEL project, Lagos, Ogun region Jun 2013 - Dec 2013
Designation-Transmission, installation and integration (microwave and BTS)
Responsibilities
ERICSSON RBS 6000 installations and integration 2G/3G
RBS 6201 integration in GSM network & RBS 6000 integration in WCDMA network
Supervising the installation of gen set, ATS, battery backup and hybrid control
GSM Technology Planning & Deployment
Building of site with Microwave and Aviat Radio installation, RF installation, gen set, ATS, hybrid and backup and Ericsson RBS 6000 installation and integration 2G/ 3G, project, Ericsson - MTN and AIRTEL Nigeria, Lagos/ogun state region.
Installation, configuration/Commissioning and Troubleshooting PMP, and microwave installation (Eclipse and Avait)
Carry-out Beat Error Rate (BER) Test and Sweep Test on completed links to check the integrity of the link.
Responsible for network rehabilitation and link re-routing
ALCATEL-LUCENT NIGERIA Jan 2008 - July 2009
No 3 Muri Okunola Street, V.I, Lagos
Department-Operations
Designation-BSS Field Support Engineer
Responsibilities
Monitoring in the Hub room, performing data backups and monitoring network server performance, Customer oriented communication/call escalations/support
Responsible to plan, implement and maintain daily Hub Room smooth functionality
Monitoring the Power backup and hybrid
Coordinating Field Engineers to resolve Transmission, Power & Bts problems on, Etisalat, Corrective Maintenance Project, Lagos region.
Troubleshooting transmission problems and resolving them like ODUs, IDUs, LOS, AIS, and Link fluctuations.
Maintenance of Hub, link and backup site
Clearing of VSWR alarms on BTS
SKILL SUMMARY/PROJECTS COMPLETED
Project Management : Supervised and achieved excellent result on Ericsson FY13,FY14,FY15 project Lagos and Ogun state, Enterprise all over Nigeria through MTN and Glo Nigeria Limited, Automation of Clearing Operations for RF,BTS and TRANSMISSION both CALL NETWORK, Deployment & Management of Installation of Bank enterprise Wema Bank Plc, Heritage Bank Plc Nationwide.
Also work on Transmission with different radio like Alcatel, Avait, Ericsson, Huawei, Nera, and Caragon, both E1 and IP link.
PROJECT /SEMINAR ATTENDED
-Effort has been made to design and construct a 3kVA Energy Usage Pack (EUP) which operates on the principle of a solar inverter with the incorporation of certain distinct features of automation and projection.
-Radio Wave Prorogation.
-Youth and the challenges of exemplary leadership by exemplary leadership foundation (NYSC)
REFEREES:
Prof. Babatunde Rabiu Engr Saheed Baderinwa
Department of Physics RNO Engineer
Federal University of Technology, Akure, Ondo State. Huawei Technologies
Phone: 080********* Oriental Hotels, Lekki
Phone: 080********