CURRICULUM VITAE
POSITION APPLIED FOR : PIPING SUPERVISOR
I. PERSONAL INFORMATION :
NAME : DELA ROCA Cesario B.
ADDRESS : Blk.2,Lot 30, Camella Homes, Sambat
San Pascual Batangas, PHILIPPINES
EMAIL ADDRESS : ***************@*****.***
NATIONALITY : Filipino
DATE OF BIRTH : February 25, 1961
PASSPORT NO/VALIDITY : EB7544661/03MAR2018
BOSIET VALIDITY : March 2019
PHILIPPINES MOB. NO. : +639*********
EDUCATIONAL BACKGROUND:
COLLEGE : Pablo Borbon Mem. Inst. Of Technology
Bachelor of Science in Civil Engineering
B.S.C.E. Graduate 1983
II. SHORT DESCRIPTION OF MY SKILLS:
Over 18 years experience in the Piping Construction in Oil & Gas, Refineries, Petrochemical and Power Plants. I have also experience in FDPSO Commissioning Project as a Piping QA/QC and FPSO as a Piping Construction Supervisor.
As a Piping Supervisor, my major duty is to supervised the assigned job, to prepare all the requirements needed in successful project execution, which include but not limited in:
Monitor construction activities to ensure work efficiency and that quality and workmanship meet project standards and specifications. Supervised the activities of the sub contractors performing works and ensures compliance with project quality, safety, and security requirements. Schedule work activities and manpower requirements to meet stablished completion dates. Play an active role in development of the safety culture of the project, making safety a natural part of all work performed. Ensured that subordinates are trained and knowledgeable of specifications and work procedures and that work is being performed in comformance with specified quality requirements.
III
WORK EXPERIENCES:
1. COMPANY : BRUNEL TECHNICAL SERVICES
PROJECT : DEPLETION COMPRESSION PLATFORM PROJECT
CLIENT : MALAMPAYA SHELL PETROLEUM EXPLORATION (SPEX)
DATES : MARCH 27, 2015 UP MARCH 25, 2016
POSITION : PIPING SUPERVISOR
DUTIES
Perform the supervision of sub-contractors activity for pre-commissioning and commissioning
Works.
Supervised the installation of all piping around the compressor area.
Perform (Nitrogen Inerting)N2 testing for HP flare, Fuel Gas at (Depletion Compression Platform)DCP area.
Assist in the installation of Gas Turbine, Compressor, Gear Box skid alignment using Laser Alignment,Rota Ligned machine,adding and removing shims as required using hydraulic jack.
2. COMPANY : GAD BUILDERS & ENTERPRISES INC.
PROJECT : UPGRADING OF CABUYAO DIST. CENTER
CLIENT : PROCTOR & GAMBLE PHILIPPINES
DATES : DECEMBER 05, 2013 UP TO FEBRUARY 19, 2015
POSITION : PIPING SUPERVISOR/CIVIL
DUTIES
Supervised the installation of dual chamber machine
Incharge in the installation of 1.5”sanitary pipe from the storage tank to the dual chamber machine, including the pipe supports and bracings.
Supervised the fabrication and installation of compressed air piping.
Incharge for the installation of Waukesha Pump underneath the storage tank including the necessary piping.
3. COMPANY : CHIYODA SARAWAK SENDERIAN BERHAD
PROJECT : TOKUYAMA POLYSILICON PROJECT
CLIENT : TOKUYAMA
PERIOD : AUGUST 24, 2012 UP TO MAY 31, 2013
POSITION : PIPING SUPERVISOR/ CHECKER
DUTIES
Assigned in the main piperack and do all the pipework activity along 2R1 &2R2 resp.
Coordinate with the other discipline regarding piping clashing and recommend best . remedy to field engineering dept
Assigned in fabrication shop and do all fabrication activities regarding piping spools fabrication, (stainless steel, chrome, jacketed pipes,) structural supports, and controlling 4-5 groups of fabricators and welders as well as their supervisors and foreman.
4. COMPANY : SAMSUNG ENGINEERING
PROJECT : SHAH GAS DEVELOPMENT PROJECT
CLIENT : AL HOSN GAS/FLOUR
PERIOD : January 9, 2012 up to July 25, 2012
POSITION : PIPING SUPERVISOR
DUTIES
Incharge for the installation of underground Utility Piping,such as WD,CWR,CWS,UW,PW,IW, and SE lines (All GRE Pipes)
Incharge also for the installation of AOC and OD lines.(GRP Pipes)
5. COMPANY : WARTSILA AUTOMATION/SBM
PROJECT : FPSO OKHA
SINGAPORE : KEPPEL SHIPYARD, TUAS, SINGAPORE
CLIENT : WOODSIDE
PERIOD : September 8, 2010 up to December 30,2010
POSITION : PIPING SUPERVISOR
DUTIES
Walk with Client Conduct Line and sub contractor prior for different kinds of testing
Supervised piping installations and arrange work schedule base on priority
Preparation of pre functional check, tri- party walkdown & punchlist, developing an enhanced initial start-up and system functional check out plan, operational test procedures.
Pre-commissioning preparation activities water flushing, air blowing, re-instatement, tightess test, inserting, fire water, deluge system functional test, flare hreader in service.
Continuously monitor & inspect the installation of piping works for conformity ensuring correct configuration set-up, weld preparation & accurate alignment to equipment.
Ensure that all are carried out in accordance with approved drawing & specification as regards in material grade, welding, dimensional, visual appearance & NDE examination.
Monitor construction work activities to ensure adherence to safety and quality standard.
6. COMPANY : CTJV CHIYODA TECHNIP JOINT VENTURE
PROJECT : QATAR GAS 3 & 4 LNG ONSHORE FACILITIES
CLIENT : QATAR GAS
PERIOD : Nov.20,2009 up to April 15, 2010
POSITION : PIPING SUPERVISOR / LINE CHECKER
Perform supervision for the sub contractor (GAMA) and Line Checking activities @ the utility area at Qatar Gas III (QCS) project
Perform backcheck of punchwork and confirmations.
7. COMPANY : CAPE EAST PHILIPPINES - OFFSHORE
PROJECT : MALAMPAYA INTEGRITY/HOOK-UP & COMMISSIONING
CLIENT : SHELL PHILIPPINES EXPLORATION
PERIOD : May 4, 2009 up to July 30, 2009
POSITION : PIPING SUPERVISOR
DUTIES
In charge in supervision for hook- up and tie- in works activities at the Malampaya
Platform, for Piping and Structural works.
Inspect the site for unsafe conditions and practices and take appropriate corrective action to correct all observed problems.
8. COMPANY : WARTSILA/PROSAFE
PROJECT : FDPSO AZURITE
SINGAPORE : BENOI SHIPYARD
CLIENT : MURPHY - Singapore
PERIOD : November 3, 2008 up to February 3, 2009
POSITION : QA/QC/PIPING SUPERVISOR
DUTIES :
Construction/fabrication/installation of mechanical/piping component of individual product line from marine to topside.
Assigned at the main engine room, hull area and do the erection of pipespool and the commissioning activities of all ongoing equipments,(main engine, auxiliary engines, generators,boilers, compressors pumps purifiers, hydrophore vaccum condensate and etc.
Responsible for the workpack distribution/instruction to the assigned technician as per
commissioning manager instruction.
Review and verify Mechanical Completion (ITR) Inspection Test record has been associated with equipment completed.
Confirm final coupling alignment, earth bonding, mechanical seal/ gland packing and free to rotate prior to motor solo run test.
9. COMPANY : GAD BUILDERS & ENTERPRISES INC.
PROJECT : UPGRADING OF CABUYAO DISTRIBUTION CENTER
CLIENT : PROCTOR & GAMBLE PHILIPPINES
PERIOD : February 4, 2008 up to October 10, 2008
POSITION : PIPING SUPERVISOR
DUTIES
In-charge on the fabrication of piping for the fire protection of new CDC warehouse.
Supervise the installation of main header as well as the branch line, including the riser
and pipe supports.
Maintain good relationship between plant owners by getting the schedules on time.
10. COMPANY : CTJV CHIYODA TECHNIP JOINT VENTURE
PROJECT : QATAR GAS II LNG ONSHORE FACILITIES CLIENT : QATAR GAS
PERIOD : August 05, 2007 up to December 22, 2007
POSITION : PIPING SUPERVISOR / LINE CHECKER
DUTIES
Supervised the installation and erection of pipe spools at the slug catcher area.
Conduct test package joint line checking activity (walkdown) together with the client and sub-contractor.
Coordinates with the client & sub-contractor regarding problems a rising on the field
11. COMPANY : S.A. KENT CO. LTD.
PROJECT : SCP / Jubail Chevron Proj. 607 (Brownfield) KSA
CLIENT : SCP
PERIOD : March 20, 2006 up to March 20, 2007
POSITION : PIPING SUPERVISOR
DUTIES
Monitor and assist on the smooth flow of fabricated spools from fabrication shop to sand blasting and painting shop for immediate release of pipes spool to site.
Responsible for controlling and supervision of fabrication, installation, and erection as required by the clients spec’s and governed codes, also manpower distribution.
Handle fabrication shop and supervised the fabrication of supports for electrical and
instrumentation activities. Prepare daily and weekly report
12. COMPANY : RAYTHEON EBASCO OVERSEAS LTD.
PROJECT : ILIJAN 1200 COMBINED CYCLE POWER PLANT
CLIENT : KIELCO
PERIOD : October 18, 2001 to February 22, 2004
POSITION : PIPING SUPERVISOR / FOREMAN
DUTIES
Responsible for supervision of on-going construction works for a/g piping.
Monitor, update, prepare daily construction activities / prepare schedule plans, equipment and daily manpower requirement.
Resolve some simple query arising at site, comply with the company standard
13. COMPANY : SNC-LAVALIN INTERNATIONAL INC.
PROJECT : PROJECT RHOURDE NOUSS, PHASE B (GPL Plant)
C.P. 023, POSTE AMIROUCHE, HASSI-MESSAOUD,ALGERIA
CLIENT : SONATRACH
PERIOD : March 24, 1998 up to December 19, 1999
POSITION : QUANTITY SURVEYOR (Piping / Mech’l)
DUTIES
Responsible for the supervision to the sub-contractors performance, coordinates problems arising on field situation to the client.
Conduct coordination meeting to the subcontractors regarding the fab’n and erect’n.
Assist in resolving any clashing at site between piping and other discipline.
14. COMPANY : KHARAFI NATIONAL CO.
PROJECT : EQUATE INFRASTRUCTURE AL SHUIBAH
PETROCHEMICAL COMPLEX PROJECT, KUWAIT
UNDERGROUND, OFFSITE PIPELINE & AIR SEPARATION
CLIENT : KNPC / SNAMPROGETTI/FLOUR INTERNATIONAL LTD
PERIOD : June 15, 1996 – June 30, 1997
POSITION : QUANTITY SURVEYOR (Piping/Mech’l)
DUTIES
Review all relevant drawings and specs received such as Piping General Arrangement, P & ID’s, Isometrics, and Pipe Support details (if in latest revision)
Ensure matls,fab’n and instlln are in accordance with the drawing and specification.
Coordinates with the clients regarding the problems arising on the field.
15. COMPANY : COGENT CONSOLIDATED CONTRACTORS (CCC)
PROJECT : AMOCO CHEMICALS PLANT
LOT 116, KAWASAN INDUSTRIAL GEBENG
26080 KUANTAN, MALAYSIAN
CLIENT : TECHNIPETROL
PERIOD : December 09, 1995 – March 09, 1996
POSITION : QUANTITY SURVEYOR (Piping, Mechanical)
DUTIES
Monitor, prepare monthly progress reports of fab’n installations & erection of pipe spools, pipe random, pipe supports and all mechanical equipment aligned erected for monthly billing purpose.
Prepare mat’l qty. take off (BOM) for all piping and mech. Works for the entire project.
Assist planning engineer in the preparation of project construction schedule by estimating the volume of pipe dia-in pipe length and their corresponding weight.
16. COMPANY : CONSOLIDATED CONSTRACTORS INTERNATIONAL CO.
PROJECT : QATARGAS LNG PLANT
P.O. Box 22056, Ras Laffan, QATAR
CLIENT : QGPC/CHIYODA CORPORATION
PERIOD : March 01, 1995 – September 01, 1995
POSITION : QUANTITY SURVEYOR (Piping, Mechanical)
DUTIES
Prepare weekly and monthly Progress reports for the erection installation accomplishment for monthly billing purposes
Prepare quantity take-off for all mechanical / piping works(piping dia-in pipe supports equipment weights)base on approved construction isometric drawings.
Monitor, update and prepare daily construction activities/ prepare schedule plans equipment and daily manpower requirements.
17. COMPANY : HYUNDAI ENGINEERING AND CONST. CO., LTD
PROJECT : SHELL MDS PROJECT
BINTULU SARAWAK MALAYSIA
CLIENT : SHELL MALAYSIA / JAPAN GAS CORPORATION
PERIOD : May 30, 1992 to Aug. 30, 1992
POSITION : PIPEFITTER
DUTIES
Assigned in hydro-testing sec. & do some necessary steps in hydro-testing preparation.
Follow test packages in their isometric in different areas in preparation for actual inspection
Supervised punch listing activities prior to hydro-testing and commissioning.
18. COMPANY : ADININ WORKS AND ENGINEERING (SDN.BHD)
PROJECT : RC PROJECT
CLIENT : K.B. 6000, BRUNEI, DARRUSSALAM
OWNER : BRUNEI SHELL PETROLEUM CO.
PERIOD : January 15, 1991 - May 30, 1991
POSITION : MARKER / PIPEFITTER
DUTIES
Assigned in piping fabrication to prepare all piping and structural works needed for field installation
Preparation of materials, fittings, structural as per drawing specification and requirements Check and consult spool deliveries at site.
Supervised the fabrication / installation and erection of pipe spool and pipe supports.
19. COMPANY : MOHAMMED AL-MOJIL EST.
PROJECT : MAXIMUM CAPACITY EXPANSION PROJ.
CLIENT : YANBU PERTROCHEMICALS SAUDI ARABIA
OWNER : YANPET/MOBIL JOINT VENTURE
PERIOD : Feb. 08, 1989 – Feb. 16, 1990
POSITION : QUANTITY TRACKER
DUTIES
Assigned in progress monitoring during shutdown work that includes but not limited to the modification of exchangers, drums steam separators, piping tie-ins, and other related activities in ethylene plant.
Do dome office like quantity estimation, materials take-off, billing computation and as built drawings.
Assigned in erection work of remaining piping and structural attachment of additional heater, in ethylene plant, installation of diverted valves, aluminum piping spools, and modified pellet water tank in extruder area of the polymer plant.
20. COMPANY : ENGINEERING EQUIPMENT INC. / BTC
PROJECT : MINA ABDULLAH REFINERY (KNPC) KUWAIT
CLIENT : KNPC / BRAUN TRANSWORLD CORPORATION
PERIOD : October 02, 1985 – October 28, 1987
POSITION : PIPEFITTER
DUTIES
Assigned in pipe fabrication shop and do all works like cutting and grinding of different kinds of pipes (Stainless steel, Carbon Steel, Chromoly etc.)
Lead the fit-up, alignment of pipes to different fittings as per drawing specification.
Conduct hydro-testing and flushing of newly installed piping.
21.. SEMINARS AND TRAININGS ATTENDED/CERTIFICATIONS AND ACHIEVEMENTS:
CERTIFICATES FOR SAFETY EXCELLENCE & SHE’S PASSPORTS which consist of:
1. Lock Out/Tag Out 6. Hazard Identification 11. BOSIET validity-March 2019
2. Accident/Incident Investigation and Reporting 7. Waste Management
3. Confined Space Entry 8. Height Safety
4. Permit to Work (PTW) 9. S.A.F.E.
5. Method Statements and JSA’S 10. Defensive Driving