Post Job Free
Sign in

Project Engineer, Piping Superintendent, Piping (Design/Site) Engineer

Location:
Singapore
Salary:
Negostiable
Posted:
September 24, 2016

Contact this candidate

Resume:

PROFESSIONAL CV

NAME* : SALVADOR J. ESPIA, JR. (BUDDY)

NRIC : S2736047E

TELEPHONE NO. : (+65) 9826-0277, +63-906-***-**** &

: +63-936-***-****

E-MAIL ADDRESS : **********@*****.***

DATE OF BIRTH : September 4, 1958

PLACE OF BIRTH : Iloilo City, Philippines

NATIONALITY : Filipino (Singapore PR)

PERMANENT ADDRESS : Block 49 Lot 3, PALAO, Kapayapaan Village Subdivision,

Canlubang, Calamba City Laguna 4028, Philippines

SINGAPORE ADDRESS : Block 214, Jurong East St. 21, #10 -419, Singapore 600214

JOB TITLE DESIRE : Project Engineer / Senior Piping Site Engineer / Senior Piping Design Engineer

HIGHEST EDUCATIONAL: Bachelor of Science in Mechanical Engineering (5 Yrs. Course)

ATTAINMENT Graduated in March 1979

Western Institute of Technology - Iloilo City, Philippines

GOVERNMENT LICENSE : Registered Mechanical Engineer (RME), Issued Oct 28, 1991

License Number: 0043695, Expire on Sept 2018

Professional Regulation Commission (PRC), Manila, Philippines

NATIONAL ORGANIZATION: The Philippine Society of Mechanical Engineers

MEMBERSHIP FULL MEMBER since February 1993 - Member No. F-93-21349

Professional Regulation Commission, Manila Philippines, Accredited

National Government Organization Cert. No. 004.

(http://www.psme.com.ph)

SOCIETY MEMBERSHIP: PHI BETA EPSILON FRATERNITY INTERNATIONAL

MEMBER since January 2005 - Member No. WIT1976 -0009 -2005 -0013 Organization

Registered in Utah, United State of America. (Website: http://www.betans.com)

PERSONAL QUALIFICATIONS:

1)Registered Mechanical Engineer.

2)Strong experience in Piping Engineering (Design & Review) and Piping Field Engineering, Construction Supervision & Coordination.

3)Ten (10) years hand on experience in Piping Field Engineering & Construction works.

4)Eleven (11) years design work experience in petrochemical and chemical industries.

5)Familiar with ANSI, API, ASME, Global Practice Standards.

6)Expertise in chemical process & piping design.

7)Expertise in organizing and planning project.

8)Familiar to operate computer, MS Office Excel, MS Office Word, MS Office Outlook & AutoCAD.

9)Hard working, committed, proactive and self-motivated person with team work spirit.

Page 2 - Professional CV: S. J. Espia, Jr. – [HP (+65) 9826-0277 – Email: **********@*****.***]:

PROFESSIONAL SKILLS:

1)Good communication in oral & writing Skill.

2)Computer Skill (MS Office Excel, MS Office Word, MS 0ffice Outlook.

3)Supervision & coordination works both Engineering Design & in Construction. Design & checking a Piping Drawings, Piping Detail/Support Standards and Piping Specifications.

4)Prepare/developed Mechanical or Piping Construction Procedure or Method Statement.

5)Hard working, committed, proactive and self-motivated person with team work spirit.

6)Have good comprehensions for written & verbal graphic instructions.

7)Have excellent problem solving skills.

8)Good team player and Client focused with excellent communication skills.

9)Able to work independently with minimum supervision.

10)Able to work under pressure.

PROFESSIONAL EXPERIENCES:

YEAR COMPANY LOCATION POSITION

July 29, 2014 to Oct. 24, 2014 PEC Ltd. Singapore Project Engineer /

Jurong Lube Expansion Project Iso Pack Checker/Reviewer

April 14, 2014 to July 4, 2014 PEC Ltd. Singapore Project Engineer /

Vopak_Evonik Methionine Project Lead Test Package

Sept. 3, 2012 to April 12, 2014 PEC Ltd. Singapore Project Engineer /

BOP SMUF Project@ Commissioning Engineer

Banyan, Jurong Island

Sept. 3, 2012 to April 2, 2014 PEC Ltd. Singapore Project Engineer /

Asia Specialty Polymer Line INVISTA Project System Engineer

July 3, 2009 to April 1, 2014 PEC Ltd. Singapore Project Engineer

PEC HQ Office – Engineering Dept.

June 21, 2004 to July 2, 2009 Plant Eng’g Construction Pte Ltd./ Singapore Engr’g Design Engineer Supervisor HQ Office – Engineering Dept. Supervisor

Dec. 6, 2001 to May 16 2004 Plant Eng’g Cont’n Ptd Ltd./ Singapore Engr’g Design Engineer

ExxonMobil Chemical Plant Supervisor

May 2 2001 to Aug. 13, 2001 Lummus Alireza Ltd Company Saudi Arabia Senior Piping Engineer

Aug. 6, 1997 to Aug. 5, 1998 Bugshan Stone & Webster / Saudi Arabia Piping Design Engineer

Arabia Consulting Eng’g. Centre

Sept. 8, 1995 to Feb. 28, 1997 JGC Corporation Singapore Bill Qty Checker Mech’l

Aug. 2, 1991 to Nov/ 30, 1993 Fluor Daniel Arabia Ltd. Saudi Arabia Piping Design Engineer

Aug. 20, 1985 to May 1989 Braun Transworld Corporation / Kuwait Subcontractor Engineer

Engineering Equipment Incorporated

Sept. 1992 to Sept. 1993 Petrochemical Engineering Ltd Saudi Arabia Piping Material Engineer

Jan. 19, 1979 to Sept. 1982 Dynetics, Incorporated - Manila, Philippines Line Maintenance Technician

SUMMARY OF ACHIEVEMENTS FROM EMPLOYMMENT:

In year 2014 PEC Limited assigned me to Jurong Lube Expansion Project as project Field Engineer had achieved the review/checking on Iso Test Packages both shop and field weld for Pre-Shutdown, During Shutdown & After Shutdown Tie-in Spools for expansion project of existing refinery in ExxonMobil Lube Plant @ Jurong Refinery Singapore.

In year 2014 PEC Limited assigned me to Vopak_Evonik Methionine Project as Piping Field Engineer had achieved the construction of new pipelines that tie-ins from existing SembCorp oration Pte. Ltd Sembawang Utilities Terminal Division in Sakra Jurong Island and run thru new pipe rrack then connect to new SembCorp Multi-Utiity Facilities Plant @ Tembusu Jurong Island Singapore. And also had achieved the prrepration & hand-over of Piping Test Packages for all new pipeline systems.

Page 3 - Professional CV: S. J. Espia, Jr. – [HP (+65) 9826-0277 – Email: **********@*****.***]:

In year 2014 PEC Limited assigned me to SembCorp Multi-Utilities Facility Project as COMMISSIONING ENGINEER for Pumps had successfully achieved the commissioning of twenty Eight (28) units new Centrifugal Pumps including Piping Test package preparation and hand-over for different pipelines services such as Demineralized Water, Utility Water, Steam Condensate, Cooling Water and Fire Water at Jurong Island Singapore.

In year 2012 PEC Limited assigned me to INVISTA Asia Specialty Polymer Line (ASPL) Fiber Limited Project in Singapore as Tie-in In-Charge & System Engineer had successfully achieved the required numbers of tie-ins in forty eight (48) locations including preparation and hand-over of System Test Packages for the systems such as the “Chilled Water Supply & Return, Nitrogen, Plant Air, Instrument Air, Polymer Solution Supply (SK), Stabilizer Supply (STB), Stopper Supply (STP), Extender Supply (EDA), Co-Extender Supply (DYTEK), EM, MDI, DMAC, Capped Glycol Supply, Bright Polymer Solution (SK), STP, STK, Slurry A & B Supply and Steam Condensate Supply & Return” lines on this project.

In year 2011 PEC Limited assigned me to P.T. Chandra Ashri Petrochemical Tbk. Company as Material Engineer had successfully achieved MTO, checking/auditing and review of “CA MTD TAM Spare Parts/Materials including Equipment Work Test Package preparation & hand-over for their CA Petrochemical Maintenance Turn-around Management 2011 in Ciwandan Cilegon Banten Indonesia.

In year 2009 to 2004 assigned to PEC Limited Main Office Engineering Department as Project Engineer had achieved piping design and tendering works of various projects for following companies such as:

1.PROJECT DESIGN WORKS (details in Page 6 & 7):

a)BP Singapore Pte. Limited – Jurong Port Singapore

b)SembCorporation Pte. Ltd Sembawang Utilities Terminal Div., - Sakra Jurong Island Singapore

c)Horizon Terminal Pte. Ltd., Phase 1 to 4 Project – Jurong Island Singapore

d)Keppel Shipyard Limited – Jurong Port, Singapore

e)Yokogawa Engineering Asia Pte. Ltd / Trans Thai Malaysia Onshore Pipeline System Project Singapore

2.DWGS. AS-BUILT, UPDATING & TEST PACKAGES (details in Page 6 & 7):

a)Rohm & Hass Chemicals Singapore Limited – Jurong Island Singapore

b)Horizon Terminal Pte. Ltd., Phase 1 to 4 Project – Jurong Island Singapore

c)Vopak Banyan Lucite Phase 3, 4 & BDS Project – Banyan Jurong Island Singapore

3.TENDERING WORKS(details in Page 6):

a)SembCorp Utility Pte. Ltd SUT Division – Sakra Jurong Island Singapore

b) SembCorp Utility Pte. Ltd SUT Division – Sakra Jurong Island Singapore

c)Chevron Oronite Pte Ltd, - Sakra Jurong Island Singapore

d)REC Water Singapore – Singapore

e)Singapore Oxygen Air Liquide Pte. Ltd - Sakra Jurong Island Singapore

f)Tuas Power Utilities Pte. Ltd – Tembusu Multi-Utilities Complex Jurong Island Singapore

Page 4 - Professional CV: S. J. Espia, Jr. – [HP (+65) 9826-0277 – Email: **********@*****.***]:

In year 2010 PEC Limited/Foster Wheeler Worley Parson JV on ExxonMobil Jurong Refiinery Singapore Parallel Train Project assigned as Project Engineer/Tie-ins In-Charge had successfully achieved the execution of over six hundred (600+) tie-ins of different types of tie-ins such as Cut & Weld, Cold Cut Plug & Weld, Hot Tap to live equipment’s including preparation and hand-over of piping Test packages, Equipment Test packages Structural Test packages for different areas /plants such as Tank Farms, H2 PSA and TransPlus 2 Plant.

In year 2004 to 2005 Plant Engineering Construction Pte. Ltd. me to TIJD Joint Venture Project, as Field Engineer/Vendor Representative following up the generated of isometric drawings from IDF files supplied from TIJD JV Japan to Plant Engineering Construction Pte. Ltd. Singapore office then generated from Spoolgen Software then to isometric drawings, converted to pdf format then uploaded to server to be downloaded at TIJD Joint Venture Site Office South Pars Gas Field Development Phase 6, 7 & 8 Onshore Facilities Project in Assaluyeh Bushehr Province, Iran. Had achieved satisfactory downloading of isometric drawings and coordination to four (4) contracting companies such as Toyo Engineering Corporation, JGC Corporation, Iran Resource Company and Dailem of South Korea. Technical problem encountered on drawings had been coordinated to Plant Eng’g Const’n Pte. Ltd. in Singapore and satisfactorily resolved

In year 2004 Plant Engineering Construction Pte. Ltd. assigned me to ExxonMobil Chemical Asia Pacific Pte. Ltd. Design & Drafting office as Design Engineer Supervisor had partially achieved the conversion of existing AutoCAD drawings to Bentley Micro Station software. And also successfully achieved conversion of all hard copies the so called Management of Change (MOC) into PDF file format in single file using the High Speed Scanner then uploading to the main server of ExxonMobil Chemical Asia Pacific Pte. Ltd. at Jurong Island Singapore.

In year 2001 LUMMUS ALIREZA LTD. COMPANY as SENIOR PIPING DESIGN ENGINEER had achieved the preparation and approval of the required design of the construction drawings for their pipelines and over twenty (20+) Tie-ins design plan and details drawings for their Kuff‘s Condensate Fractionation Project at Ras Tanura, Saudi Arabia.

In Year 1998 as Piping Design Engineer in Bugshan Stone & Webster Company/Arabian Consulting Engineering Centre in Saudi Arabia had achieved the new design drawings for upgrading of Saudi Arabia Eastern province Bulk Plant “Loading Station” including the new pipelines routing and pump stations on plants namely Dhahran, Qatif Diesel, Qatif LPG Safaniyah, Al-Jouf, Al-Hasa and Turaif Bulk Plant.

In year 1997 as Bill Quantity Checker Mechanical at JGC Corporation Petrochemical Corporation of Singapore II Ethylene plant Project in Merbau Island Singapore achievement for the checking and tabulation of quantity for the dia inch of different sizes and types of project pipelines, piping Post Weld Heat Treatment and Quantity of excavation for underground pipelines.

In year 1993 FLOUR DANIEL ARABIA LTD. as Piping Design Engineer had successfully achieved the drawings preparation of the design of pipelines including the preparation and hand-over of mechanical Data Sheets for their Saudi Arabia Marjan Onshore/Offshore Oil & Gas Plants Project in Tanajib Saudi Arabia.

In year 1989 as Field Engineer in Braun Transworld Corporation/EEI supervising the Sub-contractor had achieved on construction of 71”, 48”, 42”, 32’ & 30” diameter r re-enforced concrete cylindrical pipe known as a Bonna Pipes supplied from France. These new pipelines tie-ins from Suhaiba Refinery in Kuwait to supply Cooling Water to Existing Refinery in Mina Abdullah Refinery and to newly constructed Refinery namely the hydro Cracker & etc. And also for the underground pipelines around the Tank Farm area such as the underground Fire Water pipelines, U/G Sewer pipelines, underground oily Water pipelines & Foam pipelines to connect to the existing Fuel Oil, Diesel Fuel, Kerosine & Black Oil Storage Tanks.

In year 1983 as Piping Material/Field Engineer in Petrochemical Engineering Limited Jubail Saudi Arabia achievement on take-off, requisition of required pipeline & piping materials such as valves & fittings for the project. To include control & organized piping related documentation.

In year 1982 as line Maintenance Technician in Dynetics Incorporated had achieved an understanding the important of scheduling the production equipment’s for preventive maintenance. I also learned how to trouble shooting of the electro mechanical production equipment’s, including the power supply to pump three phase electric motor of the production mold press machines & 0ther machines.

Page 5 - Professional CV: S. J. Espia, Jr. – [HP (+65) 9826-0277 – Email: **********@*****.***]:

EMPLOYMENT HISTORY:

In July 29, 2014 to Oct. 24, 2014 assigned by PEC Limited to ExxonMobil Refinery Jurong Lube Expansion Project @ Jurong Refinery Singapore.

Project Field Engineer to review/checking on Iso Test Packages both shop and field weld for Prre-Shutdown, During Shutdown & After Shutdown Tie-in Spools for expansion project of ExxonMobil Refinery Lube Plant. Prepare, coordinates and monitor of iso spools ready for hydro testing then sent back to site after hydro test were accepted. Report to Project Manager Progress status of hydro tested spools and progress of test package review, checking and Client approval.

In April 14, 2014 to July 4, 2014 assigned by PEC Limited to Vopak_Evonik Methionine Project @ Banyan Jurong Island Singapore

Piping Field Engineer for piping construction, material requisition, resolved problem in materials and clashes on piping design. Provided a ttechnical assistance to construction team on unclear informations from drawings. Monitor construction progress, coordinates to construction pipelines readiness and hydro testing. To include coordination to Client & Sub-contractors and progress update.

Test Package Lead: Preparation of Piping test Package, Coordination with the construction, review of test report, Test Package Tracking Summary Update and system handover.

In Sept. 3, 2012 to April 2, 2014 assigned by PEC Limited to SembCorp Multi-Utility Facilities Project @ Banyan Jurong Island

COMMISSIONING ENGINEER: Responsible directly to the Senior Site Manager for the Pump Commissioning Works of all projects Centrifugal pumps. This pumps servicing Demineralized Water, Utility Water, Steam Condensate, Cooling Water and Fire Water. A total for twenty eight (28) Units of pumps. Prepared pump Commissioning Procedures, Schedule, Performance Test Report and Status Report, including compilation of Equipment’s Operation and Maintenance Manual for Mechanical Equipment’s such as Pumps, Heat Exchangers/Cooler, Miscellaneous Equipment & Manual Valves.

LEAD TEST PACKAGE: Test Packages preparation, compilation and review of test reports, NDE test report and handover of Piping, Equipment, Structural and Tank Test Packages.

In 13 April 2012 ~ 03 Sept. 2012 assigned to INVISTA Asia Fiber Singapore Pte. Ltd., - 39 Tuas Crescent, Singapore 638726

Asia Specialty Polymer Line (ASPL) INVISTA Project – TIE-IN ENGINEER / SYSTEM ENGINEER: - Reporting directly to the Senior Project Manager for the execution of all Tie-ins for the following system/lines such as the “Chilled Water Supply & Return, Nitrogen, Plant Air, Instrument Air, Polymer Solution Supply (SK), Stabilizer supply (STB), Stopper Supply (STP), Extender Supply (EDA), Co-Extender Supply (DYTEK), EM, MDI, DMAC, Capped Glycol Supply, Bright Polymer Solution (SK), STP, STK, Slurry A & B Supply and Steam Condensate Supply & Return” lines on this project.

Work includes coordination to INVISTA CMT/Plant Operation for execution of every Tie-in works. Preparation of System Test Packages for the above-mentioned systems, following-up for punch listing and clearing including hand-over of these packages to INVISTA CMT/Operation.

In March 15, 2011 to November 14, 2011 assigned by PEC Limited/P.T. Chandra Ashri Petrochemical

Tbk. – Ciwandan Cilegon Banten Indonesia

CA Petrochemical Maintenance Turnaround Management 2011” – MATERIAL ENGINEER

(CONSULTANT) - MTO, checking/auditing and review of “CA MTD TAM Spare Parts/Materials for

Turnaround 2011”. Assist in preparation of various major and minor Equipments“Work Package”

for Ethylene, HDPE, LLDPE and Utilities Plants. Preparation of Equipment Test packages compilation/

filing of inspection test report and Test Packages hand-over to P.T. Chandra Ashri Petrochemical Tbk.

Maintenance Team.

In April 2009 ~ Nov 2010 assigned by PEC Limited to Foster Wheeler Worley Parson JV ExxonMobil Jurong Refinery Singapore Parallel Train Project – ExxonMobil Jurong Refinery, Singapore

As Project Engineer/Lead on Tie-ins for the execution of different types of tie-ins such as Cut & Weld, Cold Cut & Weld, Hot Tap to live equipment’s. Test Packages - Preparation & Coordination’s. To include “Pre-Shutdown and Shutdown” Piping and Equipment’s Packages from Jetty, Tank Farms, H2 PSA and TransPlus 2 Plant Areas. Supervision and coordination for hydro testing of pipelines.

Also as Test Package Lead for the preparation, coordination and hand-over to FWP Turn-over Engineer.

Page 6 - Professional CV: S. J. Espia, Jr. – [HP (+65) 9826-0277 – Email: **********@*****.***]:

Had also assisted construction as Testing Supervisor for the hydro testing of new supply pipelines from jetty #1 to jetty #4 that run from existing pipe rack that connect different plants such as H2 PSA, TransPlus 2 Plant, Pump Station at Refinery North Gate and Tank Farm.

In April 2005 to April 2009 had been relocated to PEC LTD (formerly known as Plant Engineering

Construction Pte. Ltd in Singapore) Main Office Engineering Department maintaining the same office position and assignment with addition of site support upon received of manpower engineering assistance.

SOME ENGINEERING PROECTS HAD BEEN INVOLVED WITH PEC LIMIED (Engineering Works- Documents/Drawings Design, Details Preparation) and Tendering) were as follows:

<a> April 2009:

Rohm & Hass Chemicals Singapore Limited – Jurong Island Singapore

As-Built of Plant Process & Instrument Diagram Drawings. Site survey & inspections.

<b> March 2009:

BP Singapore Pte. Limited – Jurong Singapore

Design & drawings preparation for the additional 6” diameters lines.

<c> March 2009:

BP Singapore Pte. Limited Existing Plaant – Jurong Singapore

Design & drawings preparation for the additional 6” diameters lines.

<d> March 2009:

REC Water Singapore – Singapore

Tendering Works/Piping MTO on Slurry Import & Export System Pipelines to WST Project

<e> Feb 2009:

Chevron Oronite Pte Ltd., - Sakra Jurong Island Singapore

Tendering Work/Piping MTO on HHOB Dense Phase Lime Conveying Project

<f> Jan 2009:

Singapore Oxygen Air Liquide Pte. Ltd - Sakra Jurong Island Singapore

Hermes Hydrogen Pipeline Contract 2 Project

Tendering Works/Piping MTO on Medium Pressure to Low Pressure Steam proposed new lines

to Lucite Project

<j> August 2008 ~ Sept 2008:

As Field Engineer in Vopak Banyan Project Phase 3, 4 & BDS – Banyan Jurong Island

Singapore

Assist on Test Packages documentation preparation, revised and As-Built of construction

dwgs. Also an Engineer for piping consruction oversees pipin material, inspection & testing.

<h> June 2008:

SembCorporation Pte. Ltd Sembawang Utilities Terminal Div., - Sakra Jurong Island

Singapore

Design and document/drawings preparation for the upgrading of SCU Effluent Recovery Plant

BOP Project

<i> Dec 2008:

Tuas Power Utilities Pte. Ltd – Tembusu Multi-Utilities Complex, Jurong Island, Singapore

Tendering Works/Piping MTO on all proposed utilities piping reticulation system. The piping

system from Cogeneration & SWRO Plant to Waste Water Treatment & Auxiliary Utilities

Plant.

<j> June 2008:

Semb Corporation Pte. Ltd. Sembawang Utilities Terminal Div., - Sakra Jurong Island

Singapore

Design and document/drawings preparation for the upgrading of SCU Effluent Recovery Plant

BOP Project

Page 7 - Professional CV: S. J. Espia, Jr. – [HP (+65) 9826-0277 – Email: **********@*****.***]:

<k> Nov. 2007;

BP Singapore Pte. Ltd – ILB Pipeline at St Area Project in Jurong Port,

Singapore

Design & drawings preparation for the diversion of 8” diameters pipelines project (from existing

plant to loading/unloading station at port area.).

<l> July 2007:

Keppel Shipyard Limited – Jurong Port, Singapore

Design & drawings preparation for the new suction and discharge pipelines project of the new

Compressor inside M/V FPSO SAXI-BATUQUE Vessel.

<m> Dec 2006:

Horizon Terminal Pte. Ltd – Jurong Island Singapore

Design, revisions and As-Built of piping document/drawings of New Bulk Liquid Product

Terminal Phase 1to 4 Project.

<n> Sept 2004:

Yokogawa Eng’g Asia Pte. Ltd / Trans Thai Malaysia Onshore Pipeline System Project

Singapore

Design and drawings preparation for the Onshore Pipeline / LPG Metering System Project

<o> Dec 2001 ~ April 2004:

ExxonMobil Asia Pacific PL Singapore Chemical Plant, 100 Jurong Island Highway

Singapore

Engineering Design Supervisor at Design & Drafting Office, EMAPPL Administration

Control Building handling various discipline such as “Piping, Instrument, Civil, Structural and

including system uploading & controlling of various ExxonMobil documents and modified or

revised plant drawings.

<p> Sept 2004:

Yokogawa Eng’g. Asia Pte. Ltd. / Trans Thai Malaysia Onshore Pipeline System Project -

Singapore

Design and drawings preparation for the Onshore Pipeline / LPG Metering System Project

In Nov. 2007 ~ Feb. 2008 assigned by Plant Engineering Construction Pte. Ltd. to ExxonMobil/Singapore Hydrocarbon Fluids Expansion Project -ExxonMobil PAC, Jurong Island Singapore

As Piping Field Engineer to assist in preparation of Piping & Equipment Test Packages, coordination to construction & client, hydro testing and hand-over of test packages. To include pipeline systems inspection, punch listing, punch clearing and pipelines system testing supervision.

In Oct 2004 ~ April 2005 assigned by Plant Engineering Construction Pte. Ltd. to TIJD Joint Venture Project, South Pars Gas Field Development Phase 6, 7 & 8 Onshore Facilities Project – Assayuyeh Bushehr Province, Iran. Assignment as FIELD ENGINEER. Also as Vendor Representative for PEC Ltd supplying TIJD JV Project an Isometric Drawings generated from SPOLGEN software by PEC Ltd in Singapore and IDF File coming from TIJD JV Main Office Japan.

In June 21, 2004 to Oct. 2004 reassign to Plant Engineering Construction Pte. Ltd. HQ Office as Design Engineer. Reassignment was due to organizational restructuring of ExxonMobil Singapore Chemical Plant Area Engineering Department due to emerging of three plants such as ExxonMobil Singapore chemical Plant, ExxonMobil Refinery Plant and ESSO Refinery Plant into one management. As Piping Design Engineer work involve in developing construction drawing such as assembly drawings, isometric drawing and piping/skid detail drawing for Trans Thai Metering Onshore Pipeline Project for Yokogawa Engineering Asia Pte. Ltd.

In Dec 6, 2001 to May 16, 2004 employed by PLANT ENGINEERING & CONSTRUCTION PTE. LTD. in Singapore as DESIGN ENGINEER SUPERVISOR whose work involved in the supervision, checking and scheduling of engineering work request inside Design and Drafting Office at ExxonMobil Singapore Chemical Plant at Administration Control building, Jurong Island Singapore.

Page 8 - Professional CV: S. J. Espia, Jr. – HP (+65) 9826-0277:

Having six-design engineer and eight AutoCAD Draftsman. Work involved in modification, upgrading of existing chemical plant such as the Singapore Oxo-Alcohol Plant, Singapore Aromatic Plant, Singapore

Having six-design engineer and eight AutoCAD Draftsman. Work involved in modification, upgrading of

existing chemical plant such as the Singapore Oxo-Alcohol Plant, Singapore Aromatic Plant, Singapore

Polyethylene Plant, Singapore Propylene Plant. All plants are located in Jurong Island, Singapore.

In May 2, 2001 to Aug.13, 2001 was employed by LUMMUS ALIREZA LTD. COMPANY in Al-khobar, Saudi Arabia as SENIOR PIPING DESIGN ENGINEER for their Kuff‘s Condensate Fractionation Project at Ras Tanura, Saudi Arabia. Work involved in development of construction drawings such as piping plan isometric drawings, detail drawings and hydro-test drawings for their early tie-in works. Have also work with the hydro-test group for the preparation and compilation of Hydro-test Packages for the repair pipelines at Hydro-Cracker Plant, J-80.

In Aug. 6, 1997 to Aug. 5, 1998 was employed by BUGSHAN STONE & WEBSTER COMPANY LTD, /ARABIA CONSULTING ENGINEERING CENTRE in Alkhobar, Saudi Arabia as PIPING DESIGN ENGINEER for Saudi Aramco Facilities Distribution Modernization Project for all existing bulk plant in eastern province in Saudi Arabia. Namely Dhahran, Qatif Diesel, Qatif LPG Safaniyah, Al-Jouf, Al-Hasa and Turaif Bulk Plant. Work involved in preparing construction design drawings such as General Arrangement, Piping Plan, Isometric, Detail drawing and Tie-in Schedule Drawing.

In Sept. 8, 1995 to Feb. 28, 1997 was employed by JGC CORPORATION in their PCS-II Ethylene Plant Construction Project in Singapore as BILL QUANTTITY CHECKER MECHANICAL. Work involved in Bill of quantities take off and checking both from piping and civil construction drawings using company method of calculation in Microsoft Excel Program Version 5.0 To include checking of subcontractors” Monthly Progress Claim Report” prior to payment or invoicing. Bill of quantity checking for welding “DIA-INCH” of pipes, Support, PWHT, penetration test, excavation, back filling, pipe length, fitting and insulation. Also coordination with Sub-contractors Site Manager and Field Engineer regarding discrepancy found from piping plan, isometric and detail drawings.

In Aug. 1991 to December 1993 was employed by FLOUR DANIEL ARABIA LTD. for their Saudi Arabia Onshore/Offshore Oil & Gas Plants Project in Tanajib, Saudi Arabia as PIPING DESIGN ENGINEER. Work involved in preparation of piping design, layout/general arrangement, isometric, and detail and tie-in schedule.for new pipelines for onshore project. To include developing hydro-test flow sheet drawings. Material take-off on bill quantity on piping design as per project drawings and specifications. Have also involved in preparation of Data Sheets and Safety Instruction Sheet to all mechanical rotating equipment as project turnover requirements.

In Aug 20, 1985 to May 6, 1989 was employed by BROWN TRANSWORLD CORPORATION/ENGINEERING EQUIPMMENT INCORPORATED for their construction of new refinery and offsite project in Mina Abdullah, State of Kuwait as SUB-CONTRACTOR ENGINEER. Work involved in supervision for the sub-contractor for the construction 71” dia., 60” dia., 48” dia., 42” dia. and 30” dia. reinforce cylindrical pipe for new process plants both underground and above ground pipe works. To include daily field inspection of work progress and activities. Also include progress S-Curve and Bar Chart tracking in weekly basis. Reporting to BTC Construction Superintendent for the sub-contractor daily activities, new issue, concern and problems.

In Sept. 6, 1982 to Sept. 5, 1983 was employed by PETROCHEMICAL ENGINEERING LTD. for their Construction of New Petrochemical Plant at Jubail, Saudi Arabia as PIPING MATERIAL ENGINEER. Work involved material take-off for the installation/erection of random length of pipe,

requirements for pipe spools into the pipe rack and/or pipe sleeperway. Also include preparation of bill of quantity take-off of pipelines, fittings, miscellaneous support for vertical and horizontal vessels, motor

pumps as required for the preparation on hydro-testing. Inspection and checking the installation of the different underground and aboveground pipeworks of various systems.

In January 19, 1979 to Sept 4, 1982 was employed by DYNETICS INCORPORATED a Semi-Conductor Assembler and Exporting Company whose plant located in FTI Complex, Taguig, Metro Manila, Philippines as LINE MAINTENANCE TECHNICIAN. Work involved in the maintenance of all

hydraulic and pneumatic press machine and production mould machine in the department. Performing a repair works such as trouble shooting, normal repair & preventive maintenance work on their mechanical equipment’s such as Pneumatic Press Machines & Hydraulic Mold Press Machines & Pre-Formers. To include setting-up of Tool & Dies on various size of molds.

Page 9 - Professional CV: S. J. Espia, Jr. – [HP (+65) 9826-0277 – Email: **********@*****.***]:

SEMINAR / TRAINING ATTENDED:

* WSQ APPLY Workplace Safety and Health in Process Plant

PEC Ltd. @ 20 Benoi Lane, Singapore - 30 July 2014

* Construction Safety Orientation course (SOC)

PEC Ltd. @ 19 Tuas Avenue, Singapore - 05 Sept. 2012

* FWP – SHEM CORE Behavioral Program

Foster Wheeler Asia Pacific Pte. Ltd., Singapore - 07 July 2009

* FWP – SHE Management System/Line Supervision Roles



Contact this candidate