Post Job Free
Sign in

Power Plant Project

Location:
Special Capital Region of Jakarta, Indonesia
Posted:
September 18, 2016

Contact this candidate

Resume:

ADVENDO WIBOWO SITOMPUL

Qualification/Experience : QA/QC Engineer, QC Piping, QC Structure, Mechanical & Welding Inspector

Last Updated: September 11th 2016

CURRICULUM VITAE

Name : Advendo Wibowo Sitompul

Place/Date of Birth : Kisaran, December 4th 1985

Sex : Male

Age : 31 Years old

Nationality : Indonesian

Health : Excellent

Address : Jl. W2 No. 10 RT. 004, RW. 07

Kel. Slipi Jakarta Selatan - Indonesia

E-Mail : ***************@*****.***

Passport No : B 1145501 exp. Date May7th 2020

Phone Number : +62-813-********

PROFILE SUMMARY

A young and hardworking Welding Inspector, having more than 5 years experience in the field of inspection and testing. I Worked at automotive fabrication, fabrication and erection of piping, Steel Structure and Refinery oil, gas, power plant and Petrochemical Plants. Good knowledge in code and standard and familiar with NDT application, procedure and standard. Confidence and highly motivated, have strong personality able to communicate and a good a team players.

QUALIFICATIONS

1.Certified CSWIP 3.1 Certificate NO : 92116 and Date of expiry : March 16th 2019

2.Attended Flange Management July 18th 2016 – July 28th 2016 by OTI (Offshore

Technology Indonesia) Batam, Indonesia

3.January 26th 2015 – July 30th 2015 Attended Piping Engineer issued by OTI

(Offshore Technology Indonesia) Batam, Indonesia.

4.ISO 9001 : 2015 QMS Awarness issued by Digisi Training Center Batam, Indonesia.

5.NDT - Magnetic Particle Testing & Penetrant Testing ( ASNT Level II )

Certificate No: dBSNDT Reg. No. 1372401 and Date of expiry: June 18th 2018

6.Attended CWI (Certified Welding Inspector)-AWS Account ID : 664037 issued by B4T Bandung – Indonesia Welding Society (IWS) Batam, Indonesia.

7.NDT –Ultrasonic Testing( ASNT Level II )

Certificate No: dBSNDT Reg.No.1392315 and Date of expiry: May5th 2018

7. Welding Inspector (WI) (No. 1012.12 – 14 BTM.2222) issued by B4T Bandung – Indonesia Welding Society (IWS) Batam, Indonesia.

8. NDT –Radiographic Interpreter ( ASNT Level II )

Certificate No: 37/RI-2/BWI-NDE/IWS/2012) and Date of expiry: April 15th 2017

9. Dec3rd –Jan 29th, 2012, Piping Design & Engineering Course by Oil Institut Jakarta, Indonesia.

FORMAL EDUCATION

2011 : Graduated in Bachelor degree Mechanical Engineering, Sanata Dharma

University Yogyakarta – Indonesia.GPA : 2.93 (Scale 4)

2011 : 7 months course certificate at English First (Intermediate)

2007 : 10 months course certificate at LIA (Advance)

2005 : 1 years computer office at Tricom Medan

CERTIFICATE OF WORKSHOP ATTENDANCE

1.Welding Inspector Job and Responsibility In Offshore Pipeline Construction by Offshore Technology Institute (OTI) Batam, Indonesia.

2.Overview Onshore and Offshore Construction Oil & Gas Facilities for Structural Fabrication and Installation byJogjaConsultanBatam, Indonesia.

LANGUAGES SPOKEN ( Active ) & WRITTEN

1. English

2. Indonesia

COMPUTER LITERACY

1. Microsoft Office

2. Microsoft Windows and Internet

3. Autocad

JOB DUTIES AND RESPONSIBILITIES :

Review and Approved Inspection and Test Plan (ITP) & Inspection and Test Procedure

Prepare Take Over Package (TOP).

Review all document dedicated to project like WPs, PQR, ITP, Welder Register, Client Spec, Drawing AFC Quality Procedure, Non Conformance Report (NCR), Punchlist, NDT Technician Document and Certification and other related document before applying to project and ensure all approved procedures are implemented on yard.

Prepare all document and consumable for welder test; test pieces material, welding consumable, welder ID, welding equipment, test position and qualification of the welder

Inspection for receiving material base on Material certificate, material spec, diameter thickness, length.

Inspection before welding, check for drawing AFC, welder register and WPS register, check preheat temperature, spool or material identification, check o of joint, welder qualified, bevel degree, misalignment, quiver temperature, argon content & oksigen analyzer, checking of electrode number, temperature interpass and travel speed during welding to be matched with procedure and drawing required and visual inspection after welding completed.

Request NDT to NDE company base on welding map and ITP after completed visual inspection.

Coordination with all NDT activities & QC Welding Inspector& QC Inspector

Witness and Review all NDT activity/ report and review radiography film base on requirement.

Monitoring and witness all pressure test activities Pigging before hydrotest, Hot Tap process, pressure test, Leak test, hydrotest to be carried out accordance with requirement and review all the report base on Spec and procedure.

Monitoring Pre-Heating, Post Weld Heat Treatment (PWHT), interpass temperature and control storage of welding consumable

Preparing all necessary documents for the package such as all procedure, material tracebility, welding map, NDT report, Heat Treatment Report and pressure test report / chart Hydrotest, leak test, pneumatic test, hot tap report to be attached for supported document for MDR.

Conducting audit to ensure personal Qualification / certification, validation equipment, consumables storage and QC documentation.

PROFESSIONAL WORKING EXPERIENCE

1. Period : September 1st 2015 – July 11th 2016

Company : PT. Singatac Offshore Center (under agent Spencer Ogden)

Position : QA/QC Engineer (Structure)

Project : Jangkrik Complex Project (MID WATER ARCH SYSTEM)

Location : Bintan - Indonesia

Owner : Eni MuaraBakau B.V

2. Period : March 1st 2015 – August 31st 2015

Company : PT. Perusahaan Gas Negara Tbk (Persero)

Position : Welding Inspector (Pipeline)

Project : Procurement Installation of Pipeline Distribution for PT. Philips Project

Location : Batam - Indonesia

Contractor : PT. PGN solutions

3. Period : November 1st 2014 – January 31th 2015

Company : PT. Tripatra Samsung Consortium (under agent PT. SGS Indonesia)

Position : QC Welding Inspector (Piping)

Project : Central Processing Plant Senoro Gas Development Project

Location : Ds. Paisbuloli – Kec. Batui Selatan – Kab.Banggai Sulawesi Tengah

Owner : PERTAMINA – MEDCO E & P TOMORI SULAWESI

4. Period : November18th 2013 – August 17th 2014

Company : PT. RekadayaElektrika

Position : QC Coordinator & QC Welding Inspector (Piping)& Mechanical

Project : Ulumbu Geothermal Power Plant Project (2 x 2,5 MW)

Location : Ulumbu Kab.Manggarai Nusa Tenggara Timur – Indonesia

Owner : PT. PLN (Persero)

5. Period : June 10th 2013 – Nov 11th 2013

Company : PT. Jurong Engineering Lestari

Position : QC Piping Inspector / Welding Inspector

Project : Kaltim 5 Project 2500 MTPD AMMONIA & 3500 MTPD UREA

Location : BONTANG, KALIMANTAN TIMUR – Indonesia

Owner : PT. PUPUK KALTIM

6. Period : May 2nd 2013 – June 2nd 2013

Company : PT. Fit Weld Steel

Position : QC WeldingInspector( Structure)

Project : Evonic me5 Asia for Pipe Racks

Location : Batam – Indonesia

Owners : Jacobs Engineering

Class : ABS

7. Period : April 5th 2013 – April 29th 2013

Company : PT. JatimMustika Nusa

Position : QC Welding Inspector ( Structure)

Project : Eye Loops – Concrete Sleeper Murphy Oil Co. Ltd

Location : Batam-Indonesia

Client : Berlian McDermott Sdn.Bhd.

8. Period : September 5th 2012 – April 1st 2013

Company : PT. Citra KaryaPanca

Position : QC WeldingInspector (Structure)

Project : Gang Way Tower

Location : Kabil, Batam - Indonesia

Client : Jurong Shipyard Pte Ltd

9. Period : February 2007 – July 2009

Company : Media for Eco Technology

Position : HelperQC (Structure & Piping)

Project : Hydram, Windmill and Biogas

Location : Yogyakarta, Indonesia

DUTY AND RESPONSIBILITIES :

WELDING INSPECTION

The main duties of Welding Inspector is (before, during and after welding) on onshore of Oil and Gas project for : power plant and steel structure.

General scope of work: material verification,welding preparation, visual, NDT, Hydro test, PWHT. Coating, mechanical and inspection checklist, Field Acceptance Test, Site Acceptance Test and Certification. However: also review vendor document such as WPS/PQR, Welder Qualification and NDT Procedure.

PIPING INSPECTION

Preparation documentation method (WPS, PQR and WPQT)

Material inspection (Experience in P10H, P8, P11, and P91)

Review qualified WPS and ITP, acceptance criteria base on client, available procedure, specification codes or standard, etc ASME IX and ASME B31.3

Review validation test equipment, inspection method and AFC drawing (Isometric) before fabrication started

Witnessed Welder qualification test and recorded

Check transferred heat number (material traceability) and cutting dimension

Inspection welding preparation, fit-up (orientation dimension cut length) proper material to be jointed, qualified welder to be welded, welding process and electrode to be used and recorded, monitoring welding parameter again to the approved WPS and filler metal check, interpass temperature, distortion appearance, inspection and visual inspection on weldment, dimension of spool, prepare for NDT request as per requirement

Monitoring welding repairs after tracing NDT defect sketch are given to production

Record completion of weld

STRUCTURE INSPECTION

Prepared and reviewed documentation, WPS and ITP acceptance criteria base on client specification code standard or approved (AWS D1.1) weld map and AFC drawing inspection material (Size, type and condition)

Transfer heat number and full traceability, welding parameter sequences to minimize distortion and drawing client requirement, inspection weld size, prepared NDT methods on structure joint, maintain all report with approved report form

Witnessed Welder qualification test and recorded

Inspection welding preparation, fit-up (orientation dimension cut length) proper material to be jointed, qualified welder to be welded, welding process and electrode to be used and recorded, monitoring welding parameter again to the approved WPS and filler metal check, interpasstemperature, distortion appearance, inspection and visual inspection on weldment, dimension of piecemark, prepare for NDT request as per requirement

Monitor and control welding inspector activity, planning welder based on project requirement

MECHANICAL QC INSPECTOR

Oversee receiving and installation inspection of rotating/static equipments

Coordinate with other structural/civil disciplines for foundations checking/leveling before installation

Witness/participate in equipment leveling/alignment works which includes both hot and cold alignments.

Review and sign-off the same. Verify fabrication fit-up, alignment and dimensional tolerances.

Witness/participate in mechanical equipment receiving inspection works upon receipt at site.

Ensure testing, measuring, welding and NDE equipment are fully calibrated

Monitor the use of welding consumables is per manufactures recommendations and full certification

Review welder qualifications certifications, and attend welder qualification

Monitor bolt torque tightening works where applicable and review the records

I certify this statement is true, completed and correct to the best knowledge and believe

Sincerely,

ADVENDO WIBOWO SITOMPUL

Mobile No : +62 (0-813********

Email : ***************@*****.***



Contact this candidate