Carrier Summary
I worked as Mechanical Engineer for 10 years in Qatar and Philippines in various MEP projects construction (e.g. Health Care, Hotels, Towers, Apartment buildings, Recreational buildings, Infrastructure, and Fertilizer Manufacturing Plant).
Lead the Procurement, Engineering, Installation, Commissioning, and Maintenance of HVAC System, Plumbing System, Fire Protection System, Conveying System, LP Gas System, Coal-Fired Steam Boilers, Gas-Fired Steam Boiler. I am familiar with Green Building technology and International Standards (e.g. ASHRAE, SMACNA, ASME, NFPA, UL, OSHA, LEED, CIBSE, and NEBB).
Capable of doing:
Design of HVAC System, Fire protection, Plumbing, and Conveying System.
Bill of Quantity preparation and Cost Estimates
Planning, and Quality Control (MEP construction).
Operation and Maintenance Manual of HVAC, Fire fighting, Plumbing, Coal/Gas Fired Steam Boilers, and conveying system.
Health, Safety & Environment (HSE) Risk Assessment of MEP construction, and Fertilizer Manufacturing.
Professional Experience
Period Covered : April 18, 2010 to June 14, 2016
Company : Midmac Contracting Company
Doha, Qatar
Telephone No. +974-********
Position : Mechanical Engineer
Duties/Responsibilities :
Oversee the execution of project activities.
Monitor and Control the MEP sub-contractor. Inform MEP Project Manager for potential delays, and variations to contract.
Liaise and attend QA/QC inspections with consultant’s Quality Control inspector, suppliers, and subcontractors.
Advise the QS team and evaluates the payment claims received from subcontractors.
Leads the preparation and submission of shop drawings/As Built drawings. (e.g. Heating, Ventilating and Air-Conditioning (HVAC) System, Fire Protection, and Plumbing).
Coordinates the equipment layout, piping layout, duct layout design with Structural, Architectural, and Electrical Services.
Obtain information to the Client if discrepancy or lack of information on design drawings.
Coordinates and advise the procurement team for material requirement at site.
Supervise the preparation and submission of method statement for Installation, Pre-commissioning, Testing and Commissioning of Water Cooled, and Air Cooled Chillers, Cooling Towers, Chilled water pumps, Condenser pumps, Chemical Dosing System, Air Handling units, Fan Coil Units, Split-Air Conditioning Unit (VRV), Exhaust Fans, Pressurization System, and Smoke evacuation system;
Method statement for Installation, Pre-commissioning, Testing and Commissioning of Fire pump sets (e.g. Jockey Pump, Electric pumps and Diesel Fire pumps), Water Sprinklers, Stand pipes, Breeching Inlets, Fire Hose Reels, Fire Water Tanks and Landing Valves; and
Method statement for Installation Pre-commissioning, Testing and Commissioning of Domestic Water Booster Pumps, Sanitary fixtures, Submersible pumps, and Domestic Water Tanks.
Conduct site inspections of HVAC System, Fire fighting, Plumbing work installations; ensures that the carried out works are in compliance with contract drawings, and project specifications.
Lead site teams in the Installation of Chillers, AHU’s, FCU’s, Split AC, Chilled Water Pumps, Pressurization pumps, Ducting layout, Piping layout, volume control dampers, fire dampers, insulation and cladding;
Guide the Installation of Water Sprinklers heads, Zone control Valves, piping, Fire pumps, Domestic water pumps, Domestic Water Cooled storage Tanks, Fire Water Tanks, Submersible pumps, Sanitary fixtures, Storm Water piping and Sewage Water Piping.
Supervise the Pre-commissioning and Testing and Commissioning activities of HVAC System, Fire protection, and Plumbing.
Coordinates HVAC system, Fire fighting System, and Plumbing System design with architectural, electrical and structural for quality/efficient design plan to meet and satisfy client requirements.
Supervise Air balancing and Water balancing activities and evaluate pre-commissioning reports received from 3rd Party (Testing and Balancing Specialist).
Solve Air balancing and Chilled water balancing field issues.
Test the functionality of Building Management (BMS) connection to AHU’s, Pumps, FCU’s, and Chillers, volume control dampers, valves, Smoke Ventilation System; Submersible Pumps, Domestic Water Pumps, Water Tank level Indicator, sanitary fixtures and drainage system; Functionality of Fire alarm Detection System connection to Fire pumps, Zone Control Valves, Water flow switch, and FM 200 System.
Lead the combined functionality test of Fire fighting, Fire Alarm, and Smoke Ventilation System.
Coordinate with the client for Handing over of project deliverables.
Lead and guide the specialist subcontractors (e.g. FM 200 System Specialist, LP Gas Specialist, Third Party Testing and Balancing specialist).
Reporting to MEP Project Manager.
Finished Projects : Hamad Medical Corporation HGH Operation Theatres Building Expansion
Near Sports roundabout – Front of Hamad Women’s Hospital
Doha, Qatar
June 2014 – May 2016
Consultant : KEO International Consultants
Finished Projects : KATARA – Fitness Centre Facility
(1B + G + 3F)
West Bay, Doha, Qatar
Feb. 2013 – June 2014
Consultant : Projacs International Consultants
Finished Projects : Al Sadd Development Complex
1-Five Star Hotel (2B+G+18F)
3-High Rise Commercial Buildings (2B+G+21F)
3-Apartments (2B+G+10F)
1-Recreation Building (2B+G+5F)
1-Utility Building (2B+G+3F)
Located at C-Ring Road Al Sadd, Doha, Qatar
April 18, 2010 – January 2013
Consultant : Arab Engineering Bureau
Professional Experience
Period Covered : March, 2006 to March 30, 2010
Company : Atlas Fertilizer Corporation
Sangi, Toledo City, Philippines
Telephone +63 (32) - 5800
Position : Mechanical Engineer
Finished Projects : Procurement, Installation, Testing and Commissioning of Conveying
System, Coal Fired Steam Boiler, Bag Filter House and
Rock Crushing Facilities
Duties/Responsibilities :
Lead the fabrication and installation of Belt conveying system, and De-dusting system.
Supervise Installation of Coal Fired Steam Boiler system, Rock crushing facilities.
Responsible for the commissioning of belt conveying system, and coal fired steam boiler.
Supervise commissioning of Bag Filter house and Rock Crushing Facilities.
Monitor and control of materials usage.
Design the improvement of Vibrating Screens.
Conduct equipment performance evaluation.
Design conveying system. (Belt conveyors, elevator, etc.)
Quantify and Project cost estimates of proposed projects.
Prepare schedule of project activities.
Prepare weekly progress reports.
Reporting to Technical/Project Manager
Other Work Experience
Period Covered : June 2007 – March 2009
School Name : Consolatrix College
Toledo City, Cebu, Philippines
Position : College Instructor (Part Time)
Subjects Handled : AutoCAD Basic 2D and 3D
Basic Personal Computer Repairing
Basic Computer Networking
Other Work Experience
Period Covered : November 2004 – March 2005
Company : Cebu Private Power Corporation
Cebu City, Philippines
Position : Associate Plant Operator / Plant Maintenance
On-the-Job Training
Other Work Experience
Period Covered : June 2003 – March 2005
School : Computer Laboratory
University of Cebu
Main Campus
Position : Office & Computer Laboratory Assistant
Educational Background
Primary School : Fulgencio Dolino Elementary School
Year Graduated : March 1994
Secondary School : Toledo National Vocational School
Major Subject Taken : Drafting Technology
Year Graduated : March 1999
Tertiary School : University of Cebu
Cebu City, Philippines
Field of Study : Bachelor of Science in Mechanical Engineering
Year Graduated : March 2005
Short Courses : 2D and 3D Design Drawing
AutoCAD 2002
CCNA 1 – Networking Basic
IT Essentials 1 – PC Hardware and Software
Seminars and Training Attended
Date Title
October 28-30, 2015 International Mechanical Code (IMC) & National Fire Protection Agency (NFPA) 92 – Ventilation & Smoke Control
September 24-26, 2015 6th Middle East Regional Conference “PSME’s Strategic Innovative Mechanisms: Approaches to Regional Solutions for Environmental, Social and Economic Challenges”
September 6, 2014 Sustainability and Efficiency in Chiller System
July 18-20, 2013 LEED Green Associate Seminar
June 21, 2013 Water Cooled Variable Refrigerant Flow System
October 5, 2012 Computerized Fluids Dynamics (CFD) Analysis &
Variable Refrigerant Flow (VRF) Solution
September 14, 2012 Fire Protection and Fire Alarm System Design
May 28, 2010 Computer Generated HVAC Load Calculation
September 11-12, 2008 Effective Business and Technical Writing Skills
Seminars and Trainings Attended
Date Title
July 31- August1, 2008 Creativity and the Theory of Inventive Problem Solving
June 26-27, 2007 Personal Leadership Program
May 8- 9, 2006 Problem Solving and Decision Making
May 10, 2006 Grundfus Industry Solution
July 03, 2004 ESAB Welding Technology and Equipments
February 23, 2004 Work Ethics and Professionalism
December 05, 2004 Capability Building Workshop
August 25, 2000 Diesel Power Plant
Computer Skills
Proficient in AutoCAD Drafting
Proficient in (Microsoft Word, Excel, Power Point)
Professional Affiliation
PSME – Qatar Chapter Year 2010 – 2016
PSME Toledo City Chapter Year 2007 - 2010
PSME Mandaue City Chapter Year 2005 – 2006
Character Reference
Mr. Ammar Saleh – MEP Projects Manager
Midmac Contracting Company
Mr. Leandro V. Vergara – Sr. Mechanical Engineer
Arab Engineering Bureau
Mr. Nazario P. Relente – Site Mechanical Engineer
KEO International Consultant
I hereby certify that the above information is true and proper to the best of my knowledge.
JOVIENEL Q. TERCERO