Larry Thieneman

*** ******* ***** **

Taylorsville, KY 40071

502-***-**** (h)

502-***-**** (c)

acwmqt@r.postjobfree.com

SUMMARY: 43 years in construction (34+ years with Fluor); presently Site Mgr on a Chevron WPWP project with Fluor in Bakersfield, CA…started Aug 2014. Completed phase I of an Oil Production project as Site Manager with Fluor for ExxonMobil in the Sakhalin islands at Chayvo; after completing 4 years of phase I of ExxonMobil’s Kearl Tar Sands project in Alberta, Canada. Previously coordinated engineering and construction for Fluor overseeing Jacobs engineering & procurement on the BP Oil Coker project at Whiting, IN.

Two years as Manager of Construction for C&I Engineering; performing construction management services for Marathon.. . Past experience with Fluor in Power, Petrochemical, Steel Mill and Military projects as Site Manager and Principal Lead Engineer with FCII. Field construction and interface with Project Engineering.

Over twenty years as Project Construction Manager on industrial construction projects. Coordinated projects in the design office between the engineering, contracts, procurement and construction groups. Project Construction Manager, responsible for total control of projects from bid to final completion.

Senior Construction Engineer with Fluor Constructors, working on different projects including: Texaco Refinery-Decoker, in Anacortes; Flexicoker in Amuay, Venezuela; N.I.O.C. Refinery in Esfahan, Iran; Pump Station #6 on Alaska Pipeline. Responsible for engineering, construction coordination, inspection, change orders, field design changes, subcontractors, testing, and turnover to the clients in all disciplines (i.e., civil, steel, concrete, piping, electrical, painting, insulation, etc.)

Field engineer, working on paper mills and chemical plant expansions.

EDUCATION: B.S. in Civil Engineering, University of Louisville

Louisville, Kentucky 1973

PROFESSIONAL EXPERIENCE:

Project Name (MWSS WPPP) Client (Chevron)

Dates (Aug 2014 - Present) Location (Bakersfield, CA))

Type of project (cost plus reimbursable) Size of Project/TIC ($230M)

Industry (O&G)

Site manager overseeing 19-21 field staff members & 200+ craft during construction of the Chevron WPWP

project (in Taft, outside of Bakersfield, CA.). Project consists of 5 different sites, including site prep, concrete pipe, underground piping, steel, piping & equipment and E&I; including turnover

and assistance in commissioning of the 5 units.

03/13 to 01/14 Site Construction Manager Fluor Eurasia

Project Name ( Chayvo Well Site Expansion II) Client (ExxonMobil)

Dates (Mar2013 – Jan 2014) Location (Chayvo, Sakhalin, Russia))

Type of project (cost plus reimbursable) Size of Project/TIC (TBD)

Industry (O&G)

Started at Sakhalin to set up staff and construction group to perform

construction activities for ExxonMobil’s PPG for their drilling and

production group; part of a 5 year enabling agreement between Fluor &

Exxonmobil. Responsible for the site staff and construction contractors in

performing work on new small capital projects, modification of existing facilities

and Shutdown activities.

08/09 to 01/13 Sr Construction Manager Fluor Canada

ExxonMobil – Kearl Tar Sands

Project Name ( Kearl Tar Sands) Client (ExxonMobil)

Dates (2009 - 2013) Location (Alberta, CA)

Type of project (cost plus reimbursable) Size of Project/TIC ($1B)

Industry (O&G)

Started in IOL’s and AMEC’s office assisting IOL’s project team in

setting up the Kearl project, meeting with proposed contractors, working

out construction issues and engineering design. Began at the site in an

oversight / monitoring role for the Bitumen areas representing IOL /

ExxonMobil. Took over role as Sr Construction Manager and backshift

for Site Manager on the Fluor Infrastructure silo at Kearl.

05/09 to 07/09 Turnaround Construction Mgr. Fluor

Chevron Oil

Richmond, CA

Project Name (Chevron Upgrade) Client (Chevron)

Dates (2009) Location (Richmond, CA)

Type of project (cost plus reimbursable) Size of Project/TIC

Industry (O&G) Execution Approach (Union)

Coordinated the Turnaround activities, supervised area managers and

interfaced with Chevron. Established and implemented personal

accountability, project focus, and streamlined work processes.

08/06 to 05/09 Construction Manager Fluor

BP Oil Whiting

ConocoPhillips WRR

Project Name (BP) Client (BP)

Dates (2006-2009) Location (Whiting, IN)

Type of project (Cost Remibursable) Project/TIC (1B)

Industry (O&G)

Type of project (cost plus reimbursable) Size of Project/TIC ($1B)

Industry (O&G,) Execution Approach (Union/CM)

Performing constructability reviews and working with client,

schedulers, and engineers on construction issues. Assisted Site

Manager in FEL-2 & FEL-3 estimates. Coordinated Jacob’s

engineering and procurement effort for the SRC complex in Whiting.

Moved to the field as SRC Construction Manager and handled staff of

55 directing 400+ craft and Subcontractors for new SRU, TGU,

TGUR, SWS, and other units at Whiting, IN. ($800MM)

07/04 to 08/06 Manager of Construction C&I Engineering @

Marathon Refinery in

Catlettsburg, KY

Project Name (Low Sulfur Diesel upgrade)) Client (Marathon Oil)

Dates (2004 - 2006) Location (Ashland, KY)

Type of project (lump sum) Size of Project/TIC ($200 M) Industry (O&G, Telecomm, etc)

Execution Approach (Open Shop/Union CM)

Started a construction management group for C&I at the Marathon

Refinery. Responsible for all new large & small capital projects for

Marathon. Hired and responsible for scheduling, cost, supervision,

contracts, material and total project management. Involved from

engineering concept through start up of new units.

08/03 to 07/04 Construction Manager Fluor Federal Services

Al Udeid Air Force Base

Doha, Qatar

Completing a 6000 man camp for the USA Air Force. The base

consisted of 136 billets and 12 latrines to accommodate 6000 soldiers;

including water, sewer and electrical services, as well as roads, berms

and bunkers.

06/02 to 08/03 Site Manager TVA (Tennessee Valley Authority)

Cumberland City, TN

SCR Project

Responsible for total field construction; approx 700 men, 4 year project

to clean up 2- 1300 megawatt units air quality. Includes new

construction to existing plant, outage related work for both units.

Interface with plant management and engineering. Completion to be in

May 2004.

06/01 to 06/02 Site Manager Duke/Fluor Daniel

Southaven, MS

640 MW Power Plant

Type of project (lump sum/cost plus reimbursable) Size of Project/TIC ($250 M)

Industry (Power) Execution Approach (Open Shop/Union/CM)

Responsible for total project; Engineering, Construction, Contracts, Procurement, scheduling & cost. CM Project consisting of 8 ea 80 MW simple cycle gas turbines. Completed project ahead of schedule, below budget and with triple zeros safety award for over 500,000 manhours.

07/00 – 06/01 Construction Eng. Manager Duke/Fluor Daniel

Vandalia, MO (Audrain)

640 MW Power Plant

Type of project (lump sum/cost plus reimbursable) Size of Project/TIC ($250 M)

Industry (Power) Execution Approach (Open Shop/Union/CM)

Coordinated engineering, contracts and preconstruction activities in the Houston office. Onsite Engineering Manager; consisting of 8 ea 80 MW simple cycle turbine and generating units. Involved with scheduling, costs, engineering and construction from beginning thru start up.

4/99 – 07/200 Construction Eng. Manager Duke/Fluor Daniel

Cayuga, IN (Vermillion)

640 MW Power Plant

Project Name (UTC/PW) Client (United Technologies)

Dates (2001) Location (Chicago, Illinois)

Type of project (lump sum/cost plus reimbursable/ Size of Project/TIC ($250 M)

Lump sum – turn key/incentive contract) Industry (O&G, Telecomm, etc)

Execution Approach (Open Shop/Union/CM/Program Management)

Type of project (lump sum/cost plus reimbursable) Size of Project/TIC ($250 M)

Industry (Power) Execution Approach (Open Shop/Union/CM)

Coordinated engineering, contracts and preconstruction activities in the Houston office. Onsite Engineering Manager and Contracts Manager on the Vermillion Generation Station; consisting of 8 simple cycle turbine and generating units. Involved with scheduling, costs, engineering and construction from beginning thru start up.

11/98 – 4/99 Construction Manager Fluor Constructors

MurphyOil (Chamlet, LA)

B.P.Oil (Toledo, OH )

Supervised staff, craft and contractors on several refinery shutdowns. Responsible for construction and field engineering activities during the pre-shutdown and the shutdown. Short duration projects and 80 hours/week.

06/97 – 11/98 Construction Manager Fluor Constructors

Akzo Nobel

Type of project (cost plus reimbursable) Size of Project/TIC ($250 M)

Industry (Petro Chem) Execution Approach (Open Shop/Union/CM)

Performed coordination between Engineering, Procurement and Construction; constructibility reviews, contracts, and client interface. Set up field office and staff to manage construction of 3 separate chemical plant expansions; Amine, Fatty Acid, and Surfactant DEQ. Construction Manager responsible for receiving/expediting, site construction, quality, control safety, contract administration, and onsite change orders.

12/94 – 06/97 Engineering Manager Fluor Constructors

Elf Atochem

Calvert City, KY

Started in Greenville with Design Team, constructibility, and coordinating design with construction schedule and activities. Assisted with contracts, wrote scope of work, material Purchase Orders, and coordination of contracts. Responsible for all Field Engineering activities from design through start up.

06/93 – 11/94 Principal Engineer Fluor Constructors

Bethlehem Steel Burns Harbor, IN

Started in Greenville with Design Team, wrote subcontracts, talked to vendors, started construction in the field, responsible for Construction Engineering and responsible through start up.

05/92 – 06/93 Superintendent/Eng Fluor Constructors

Marathon Oil Detroit, MI

For refinery expansion; SRU & unifiner handled subcontractors from groundwork to turnover.

11/88 – 05/92 Area Project Manager TMI/Hallcontracting

GE Plastics

(Mt. Vernon, IN)

Project Name (UTC/PW) Client (United Technologies)

Dates (2001) Location (Chicago, Illinois)

Type of project (lump sum/cost plus reimbursable/ Size of Project/TIC ($250 M)

Lump sum – turn key/incentive contract) Industry (O&G, Telecomm, etc)

Execution Approach (Open Shop/Union/CM/Program Management)

Started an office in Mt. Vernon, IN to do industrial construction, civil, mechanical, and electrical in this area. Responsibilities included setting up an office, hiring employees, public relations, sales, estimating, construction management, etc. Job included getting work, organizing a staff, and starting a functional office to compete in a new area.

11/87 –11-88 Mechanical Project Manager National Steel Erection

(Owensboro, KY)

Project Name (UTC/PW) Client (United Technologies)

Dates (2001) Location (Chicago, Illinois)

Type of project (lump sum/cost plus reimbursable/ Size of Project/TIC ($250 M)

Lump sum – turn key/incentive contract) Industry (O&G, Telecomm, etc)

Execution Approach (Open Shop/Union/CM/Program Management)

Responsible for developing and managing a mechanical group, including estimating, cost control, construction management and inspection. Also responsible for ASME work and testing of welders.

07/84 – 9/87 Project Construction Manager Oil Field Construction

(Bakersfield, CA)

Duties involved total control of projects from bid to final completion. Worked with an estimating group and coordinated the bid stage, negotiated contacts, wrote subcontracts, ordered material, set up and supervised the construction project, scheduling, cost accounting, progressing, invoicing and final turnovers of many oil and chemical projects ranging from small to over $5,000,000 and up to 125 direct hire men as well as other subcontractors.

Projects included:

Shell Oil Aquifier Project ($1,300,000),

Texaco Pump Station ($350,000),

Texaco Steam Pipeline ($1,500,000),

Shell Oil Vapor Recovery ($2,900,000)

Chevron Oil Steam Injection ($5,000,000).

10/75 – 07/84 Senior Construction Engineer Fluor Constructors

(Irvine, CA)

Responsible for engineering, construction coordination, inspection, change orders, field design changes, subcontractors, testing, electrical, painting, insulation, etc.

Refinery-Decoker Texaco, Anacortes

Flexicoker Lagoven, Amuay, Venezuela

Refinery Marathon, Garyville, Louisiana

Refinery Esfahan, Iran

Pump Station #6 Alaska Pipeline

06/73 – 10/75 Field Engineer Rust Engineering,

(Birmingham, AL)

Worked on paper mills and chemical plant expansion. Responsible for layout, survey, inspection, testing, and engineering records.

1970 – 1972 CO-OP STUDENT Georgia Highway Dept.

Atlanta, GA.

Working in traffic and safety, research lab, and construction group for three semesters.