Mobile: +20-128*******
E-mail : ***.****.****@*****.***
Address : ** *****-*** ***** **., Zaytoon, Cairo
Adel Mustafa Mahmoud Mohamed Amer
Career Objective :
Seeking a position in the field of engineering to be an effective member of an Executive team in a successful international or multi - national organization with global opportunities.
Education :
Cairo University – Faculty of Engineering – Master of Science engineering- industrial engineering. (in progress )
Cairo University – Faculty of Engineering – Postgraduate studies – mechanical design and production. (2011)
Total Grade: very good.
Helwan University– Faculty of Engineering – Bachelor of Science degree from the engineering faculty.
Department of : Mechanical Engineering
In : Industrial engineering
Project name : Quality improvement (at El-sewedy poles factory)
Project grade : excellent
Graduation Date: 2010
Training Courses :
PLC basic applications
Location: Jelecom training center.
Period : 28/01/2014 to 20/02/2014
Electrical Classic control basic applications
Location: Jelecom training center.
Period : 08/01/2014 to 27/01/2014
Operation and maintenance of BOSCH tablet machine XP500
Location : ADCO (during SAT)
Period : 26/11/2012 to 6/12/2013
Factory acceptance test (FAT) for powder preparation machines
Location: China country
Period: from 01/11/2012 to 11/11/2012
I was chosen to be my company representative to do the FAT of an imported production line.
Validation in HVAC systems
Location: Holdipharma CO.
Period : 2012
GMP (Good manufacturing Practices)
Location: Holdipharma CO.
Period: from 18/07/2011 to 19/07/2011
AUTO CAD 2D – 3D
Location: XPAND for computer consultant.
Period : from 01/07/2010 to 01/09/2010
Oracle 10g.
Location: The central agency for public mobilization and statistics.
Period : from 24/11/2009 to 12/01/2010
Primavera
Location: Cairo University – Faculty of engineering.
Period : from 01/03/2009 to 05/05/2009
Summer training:
Location : Petrojet CO. site
Period : From 21/7/2007 to 16/8/2007
the training was at :
oSafety and its important role in the company.
oWelding and technical inspection.
oExecution of the metal constructions and pipe lines.
Work History :
Quality Part-Leader Engineer
From Jan 2016 till now at Heesung Electronics Ltd. (LG TV Maker)
Responsibilities:
Reviewing customer requirements and make sure they are met.
Working with purchasing staff to establish quality requirements from external suppliers.
Setting standards for quality as well as health and safety.
Making sure that manufacturing or production processes meet international and national standards.
Looking at ways to reduce waste and increase efficiency.
Defining quality procedures in conjunction with operating staff.
Setting up and maintaining controls and documentation procedures.
Monitoring performance by gathering relevant data and producing statistical reports.
Making suggestions for changes and improvements and how to implement them.
Using relevant quality tools and making sure managers and other staff understand how to improve the business.
Making sure the company is working as effectively as possible to keep up with competitors.
Production Part-Leader Engineer
From June 2014 till Jan 2016 at Heesung Electronics Ltd. (LG partner)
Responsibilities:
overseeing the production process, drawing up a production schedule
ensuring that the production is cost effective;
making sure that the products are produced on time and are of good quality;
working out the human and material resources needed;
drafting a timescale for the job;
estimating costs and setting the quality standards;
monitoring the production processes and adjusting schedules as needed;
being responsible for the selection and maintenance of equipment;
monitoring product standards and implementing quality-control programs;
liaising among different departments, e.g. suppliers, managers;
working with managers to implement the company's policies and goals;
ensuring that health and safety guidelines are followed;
supervising and motivating a team of workers;
reviewing worker performance;
identifying training needs.
QC engineer (Incoming Quality Control)
From February 2013 to June 2014 at Heesung Electronics Ltd. (LG partner)
Responsibilities:
Approves incoming materials by confirming specifications; conducting visual and measurement tests; rejecting and returning unacceptable materials.
Approves in-process production by confirming specifications; conducting visual and measurement tests; communicating required adjustments to production supervisor.
Approves finished products by confirming specifications; conducting visual and measurement tests; returning products for re-work; confirming re-work.
Documents inspection results by completing reports and logs; summarizing re-work and waste; inputting data into quality database.
Keeps measurement equipment operating by following operating instructions; calling for repairs.
Maintains safe and healthy work environment by following standards and procedures; complying with legal regulations.
Updates job knowledge by participating in educational opportunities; reading technical publications.
Accomplishes quality and organization mission by completing related results as needed.
Supervise the verification tasks for the defects that coming from the production and judge whether the defect was caused by worker error or by the supplier.
Maintenance engineer
From May 2011 to January 2013 at ADCO. (Arab Drugs Company, Egypt.)
Responsibilities:
Prepare and execute the preventive maintenance plan for production machines.
Supervise the activities of dismantling and assembly of machines parts in different locations, during different trouble shootings.
Prepares plan and lists for the required spare parts (foreign and local) for all production machines and executes the plan according to the approved budget.
Planning and executing all the required upgrade for production machines.
Issue SOPs for the new machines, upgrade and revise the existing describing preventive maintenance and other action needed to be revised through SOP.
Construction site engineer
From September 2010 at A.T Egypt for engineering and trading CO. to February 2011.
Responsibilities:
Carrying out firefighting networks and HVAC systems.
Monitoring all the stages of carrying out process.
Projects: executing firefighting networks at NESTLE CO. – factory of the dry products in 6th of October city.
Computer & other Skills:
Windows : excellent.
MS Office : excellent.
Internet Use : excellent.
Autodesk Inventor : good.
5 S
7 Wastes
6 sigma
Languages :
Arabic : mother tongue.
English : excellent.
Personal Data :
Date Of Birth : 18/09/1986
Nationality : Egyptian.