Post Job Free
Sign in

Piping supervisor

Location:
Hanoi, Vietnam
Posted:
September 14, 2016

Contact this candidate

Resume:

JOSELITO G. GONZALES

ADDRESS: # *** ****-**** ***** ******** CITY

PHILIPPINES 4200

Cell phone No. +841*********

Home Telephone no: +63-433******

Email Address: **********@*****.***

POSITION APPLY FOR: PIPING SUPERVISOR

EDUCATIONAL ATTAINMENT

Course : Diploma in Drafting Technology

(Undergraduate Bachelor of Science in Mech’l Engineering)

School : University of Batangas, Philippines

(Formerly : Western Philippine College)

Year Graduated : 1990

BRIEF WORK HISTORY

More than Sixteenth (16) years experience in project management for construction and maintenance work at petrochemical, petroleum refinery, pharmaceutical, power plant, Gas plant and revamp project. Summary of experience includes; Supervision of assembly and erection of piping works (UG,AG), punnch listing, hydrotesting, pmcc, steel structure & pipe supports, FM 200 piping system, placement and alignment of equipment, installation of mechanical/control devices. Supervision of Turn-Around shutdown work for Piping and Static equipment such as column, reactor, vessel, furnace and exchanger. Supervision the installation of Contro trace, Contro heat, Contro panel and jump hose connection for Molten Sulfur line, Tail Gas line, Snuffing steam and Coalescer Drum.

EMPLOYMENT RECORD

February 23, 2016 up to Present JGCS Consortium

Thanh Hoa Province, Vietnam

PROJECT INVOLVED

Nghi Son Refinery and Petrochemical Plant Proj.

Piping Supervisor

February 06, 2014 to November 20, 2015 SK Engineering & Construction

Al Jubail, Kingdom of Saudi Arabia

PROJECT INVOLVED

Saudi Aramco Wasit Gas Plant Project

(Sulfur Recovery Unit train no.1,2,3 & 4 and Utilities Area)

Piping Supervisor

To ensure that the works are executed with the adequate standards of health and safety, this remit including the empowerment to stop all unsafe activities that create a situation of imminent danger.

Checking contractors daily report, analyze performance indicators, implement continuous improvement actions.

Prepare fabrication and installation packages in accordance with identified system boundaries

Work with piping contractors in developing drawings where required

Monitor site materials handling and warehousing activities to ensure they support and facilitate construction progress.

Coordinates with QC, Painting Supervisors and Client representative for Hydro test and completion.

Supervision and Monitoring the installation of Contro trace, Contro heat, Contro panel and jump hose connection for molten sulfur line, tail gas line, snuffing steam and Coalescer drum.

Conduct and Inspection the service test of Steam Tracing line.

Work with Engineering and Commissioning teams to ensure equipment preservation, installation and testing programs are appropriate and do not compromise equipment performance.

To ensure the proper execution of inspection and testing in accordance with the field Quality control plan and monitor the adequacy result.

To attend final walkthrough of completed piping system and verify clearing of all punch list.

To attend coordination meetings with construction team or as requested by the Piping or Package Manager and assist on all pre-commissioning activities.

February 04, 2013 to February 04, 2014 Daelim Philippines Inc.

Bo. Simlong, Batangas City, Philippines

PROJECT INVOLVED

JG Summit Petrochemical Complex

Napthacracker Project

Piping Supervisor

Monitor site construction activities to ensure that discipline related activities, including material and equipment receipt, storage and installations are accomplished in full compliance with the HSE procedures, applicable specifications and standards.

Plan and schedule piping installation activities with piping contractors with in the given project deadlines.

Coordinate with other discipline supervisors ( E&I, Mechanical etc.) as necessary to achieve smooth site installation.

Ensure pipe spools and other components, including inline devices (e.g. valves and instruments) are available for installation in accordance with the piping material take-offs.

Supervise pipe fabrication, installation and testing activities to ensure compliance with issued piping isometrics and related piping codes / standards.

Deliver instructions to construction contractors for the work scope and activities of the day, supervise the workflow to ensure daily work plan and activities were carried out.

Work with safety engineers / supervisors to ensure adherence to safe work practices for all field activities.

Carry out progressive punch listing, testing, reinstatement to ensure that the works are completed to the fullest extent possible prior to acceptance.

Ability to effectively supervise combined multi-disciplined teams.

To provide feedback to other discipline construction supervisors, Site Manager, QA/QC Team via Construction Supervisor for any matters affecting or related to Contractor's quality, workmanship or performance

November 12, 2011 to November 30, 2012 Samsung Engineering (EPCC)

Al Jubail, Kingdom of Saudi Arabia

PROJECT INVOLVED

Saudi Aramco Total Refining & Petrochemical Co. (SATORP)

Jubail Export Refining Project (JERP #3) Aromatics Unit

Piping Supervisor

Ensure that construction contractors working within his discipline adhere strictly to the latest approved for construction (AFC) project drawings, specifications, procedures and site instructions.

Responsible for the quality of the work within assigned areas and for ensuring construction contractors complete their work in accordance with the project schedule. To specify and evaluate different piping materials.

Monitors subcontractors labor force for the piping discipline.

Deliver instructions to construction contractors for the work scope and activities of the day, supervise the workflow to ensure daily work plan and activities were carried out.

Review the availability of all drawings, specifications, job instructions, material deliveries and tools applicable to his particular area of work.

Agree method statements, risks assessments and job safety analysis. Ensure that all work is carried out in accordance with the agreed method statements.

Carry out progressive punch listing to ensure that the works are completed to the fullest extent possible prior to acceptance. Witness and conduct testing.

Raising technical queries to the engineering department for clarifying various technical issues in the site.

Coordinate various meetings with contractors and address critical issues affecting progress.

Responsible for RTR underground piping, A/G piping, piping supports and FM200 fire fighting agent piping system.

September 8, 2009 to April 30, 2011 Downer EDI Engineering (S) Pte. Ltd.

11 Lorong 3 Toa Payoh Blk B #03-16

Jackson Square, Singapore 319579

PROJECT INVOLVED

Exxon Mobil Asia Pacific Pte Ltd

Singapore Parallel Train Project

Inter Connect & Tankage (SPT–IC&T) Revamp Project

Piping Supervisor

Ensure and control that all the plant and well activities are conducted in compliance with the applicable WSHE rules and the safe operational working practices with respect to site instructions and procedures.

All piping activities on site in respect of Safety, Quality, Schedule and cost.

Fully familiar with drawings & specifications applicable to the project.

Instructs subcontractors on day to day matters.

Collect and review all work permits prior to the daily work permit with the objective to ensure the compliance with the work permit procedure.

Assess interference between activities.

Continually review material and equipment deliveries and report discrepancies and/or shortages to the Discipline Superintendent and material controller.

Ensure proper control of changes by assisting the Discipline Superintendent to issue FI’s for all changes, reviewing TQ’s to ensure responses are appropriate and practical.

Project monitoring of all activities done with request of RFI and following ITP

To response for the resolution of piping/mechanical related technical queries, strive to minimize cost and schedule impact of any engineering change.

Responsible for applying permit and supervision during Welding On Live Equipment (WOLE), Hot Tapping tie-in & hydro testing, Opening Process Equipment (OPE), Confined space, Lifting over live line on SPT-IC&T revamp project.

March 11, 2002 to August 21, 2009 Plant Engineering Construction Ltd.

21 Shipyard Rd.

Singapore 628144

PROJECT INVOLVED

Project and Maintenance work for EXXON MOBIL Jurong refinery Singapore October 14, 2005 to August 18, 2009.

Project and Maintenance work for ESSO Refinery Singapore – March 2004 to October 13, 2005

Maintenance work for DUPONT Singapore – September 18, 2002 to March 3, 2004.

OSP1 – PFIZER BULK Pharmaceutical Plant Project – March 11, 2002 to September 17, 2002.

Mechanical/ Piping Supervisor (Project/Maintenance)

Supervise fabrication and erection activity for piping and structural works.

Monitor site construction activities to ensure that discipline related activities, including material and equipment receipt, storage and installations are accomplished in full compliance with the HSE procedures, applicable specifications and standards.

Make necessary preparation for tie-in activity before shutdown.

Supervise shutdown work for static equipment; column, reactor, vessels, drums, furnaces and exchanger.

Prepare work permits, verifies and complies with safety and unit operator for the condition of work area before conducting hot or cold work operation, stand-by fire fighting equipment.

Ensuring that the work is carried out in accordance with the latest revision of drawings, isometrics, specifications and standards and procedures.

Review contractor’s manpower resources and coordinate requirements with immediate superior in a timely fashion to ensure no loss of productivity. Continually monitor the need for contractor overtime and obtain the approval of immediate superior when required.

Witness, inspect and maintain surveillance checks on contractors work in accordance with the site quality plan and the requirements of the chief field engineer. Ensure that all inspection activities are recorded in the appropriate records. Attend daily shutdown meeting to update the CLIENT group on the progress.

Prepare punch list of work not properly completed or not conforming to plan and specification.

Applying permit for Hot Tapping job and Supervising to ensure safe working condition.

MATERIAL COORDINATOR

Reporting to the warehouse manager and responsible for the supervision of warehousing activity such as material receiving, material handling/storing and issuing of material.

Initiate and conduct general inventory of materials.

Coordinate with material expediter for the verification of their request through purchase order information system - POIS.

August 1, 2000 – March 31, 2001 Daijung Machinery & Industry Co., LTD

Batangas Ilijan, Batangas City

1200 MW Combined Cycle Power Plant Project

LINE CHECKER

Perform All Q.C functions, Check and control that all project specifications, drawing and assembly process were correctly executed during the construction.

Responsible to the QA/QC Supervisor for monitoring implementation for client’s specifications and compliance to the procedures.

Coordinate actual surveillance in welding, piping and structural fit-up, erection works including checking and specification requirements.

Performs regular weld audits to check the compliance to establish WPS parameters. Determine that the designated electrode or filler metal proper for base metal to be welded checked the electrode and storage conditions.

Performs line checking as per isometric drawing and P&ID. Prepare and recognized all inspection of line prior to hydro-testing.

Specify “Hold Points” and coordinate with the client representative for approval.

March 18, 1997 – March 31, 2000 Daelim Industrial Co., LTD.

Mailiao, Yunlin County, Taiwan, R.O.C.

FCFC – Aromatics I & II Project

QC INSPECTOR

Conducted surveillance of Welding, NDT, PMI and PWHT activities on subcontractors designated area of responsibility.

Ensures that all welds meets the Project requirements and in accordance to the WPS.

Implement the Project Construction Quality Program at site.

Ensures that repairs are done correctly and accurately to comply with the Project Specification.

Receives test packages for line checking, document reviews and punch listing.

Perform actual site line checks and verification as per approved Isometric drawings.

Monitors, records and clearing of QC related punch items.

Ascertains that safety for welding, testing and related activities are being implemented.

Coordinate with client inspector for inspection and activities and documentation.

February 10, 1995 – May 1, 1996 Consolidated Contractors INTL. CO.

Ruwais, Abu – Dhabi UAE

ADNOC General Utilities Plant (Desalination)

MECHANICAL / PIPING DRAFTSMAN

Complete tasks in accordance with project procedures/specifications and applicable codes and/or standards.

Discuss routine technical problems and communicate effectively with immediate supervisor and other project personnel.

Utilize intermediate to advanced PC and 2D Auto Cad software, and other applicable hardware and software to perform duties. Applying and strengthening applicable design skills, as well as software skills, such as 3D Auto Cad.

Meet deadlines and manage priorities important.

Strong written and verbal communication skills are critical. Usually able to explain why things are done they way they are within a broader organizational context.

Commitment to customer service and ability to work in a team-oriented environment.

October 11, 1994 – February 17, 1995 Atlantic Gulf & Pacific Co.

San Rafael, Calaca Batangas, Philippines

Coal Fired Thermal Power Plant Project

PIPING LEADMAN

Assisted foremen in tracking field work, preparing of daily labor distribution and weekly progress report prior to the target date of scheduled job.

Take-off materials and prepare tools and equipment needed for fabrication, installation and erection.

Verify piping installation, material classification, fittings, support installation, hook up line, main line branches, blinding parts, vents and pumps location based on P&ID as per test package.

Monitoring and checking field erection as per ISO drawing, Plan drawing and Specification requirement.

Check work condition, tools and equipment to be used to ensure safety of men and equipment.

June 8, 1994 – September 15, 1994 Engineering Construction

Corporation of Asia

Payocpoc sur, Bauang, La Union

Power Plant

PIPING LEADMAN

Participated actively in the fabrication and installation of pipe spool and pipe supports on site.

Work closely with the welder/fitter in the final alignment of pipe, verifies measurement and alignment prior to full welding and bolting of flanges, joint support and hanger device means to satisfactory complete the installation/assembly. Determine temporary support to hold pipes in the place as required.

Prepare work permits, verifies and complies with safety and unit operator for the condition of work areas before conducting hot or cold work operation, stand by fire fighting equipment.

Lay-out, cutting and fabricate 45º, 09º miter bends, including lateral branches and thru “Y”.

Certificate of appreciation (SPT-IC&T)

Safe Work Hours Without Lost Time Incident

Supervisor of the Month

Essential Skills / Qualifications:

Competency in the use of common computer systems and software

Piping and Metallic structures installation and supervision of those works

Lifting Supervisor/ QC Inspector / PTW Coordinator

Material Coordinator/Controller

Excellent organization and coordination skills, as well as problem-solving skills

COURSE AND TRAINING ATTENDED

Practical Training Experience – Samsung Naffora Techno Valley Safety Training Center, KSA – 26 December 2011

Qualified Permit Applicant - Exxon Mobil Refinery/ Chemical Plant

Oil / Petrochemical Industry safety course for supervisor

05 June 2006 to 28 June 2006

Occupational Safety & Health (Risk Assessment Training)

27 January 2007

First Aid and Fire safety and Evacuation

22 September 2006

Lifting Supervisor Safety Course

20 September 2006 to 13 October 2006

Safety Instruction Course For Supervisor (Manhole)

07 May 2008

Visual testing (VT)

20 October 2006

National Manpower & Youth Council

1991 – Plumbing / Pipe Fitting

(RMTC) Batangas City, Philippines

ON-THE-JOB TRAINING ( Draftsmen )

City Engineers Office

Batangas City, Philippines

9 December 1989 to 9 March 1990

PERSONAL DATA

Birthday : August 27, 1966

Birthplace : #186 Sorosoro Ilaya, Batangas City

Civil Status : Married

Name of Spouse : Reyvilyn A. Gonzales

Citizenship : Filipino

Religion : Roman Catholic

Sex : Male

Language Spoken : English and Filipino

Passport No. : EB1996644

CHARACTER REFERENCES

Yonghee Kang

CSI Contro Trace Field Advisor

Email: ****@*******.***

S.H. KIM

Piping Superintendent

Daelim Philippines Inc.

JG Summit Petrochemical Complex Napthacracker Proj.

Mobile No. +639*********

Brian Camacho

Piping Superintendent (Foster Wheeler Worley Parson JV)

Exxon Mobil Singapore Parallel Train Project ( SPT – IC&T

Ruelito Vargas

Piping Superintendent (PEC)

Plant Engineering Construction Ltd.

Mobile no: +659*******

Exxon Mobil - Project and Maintenance

Charles D. Monteilh

Exxon Mobil Representative (PMT)