Post Job Free
Sign in

Power Plant Electrical

Location:
Philippines
Posted:
September 13, 2016

Contact this candidate

Resume:

Email: *****************@*****.***

Brgy: Patimbao Sta Cruz,Laguna.

Cel #: +639*********

Tin#: 231-***-***-***

SSS#:041*******

Pag-IBIG I.D#:107*-****-****

Phil Health#:08-050452418-7

JOB OBJECTIVE :

To be able to apply my knowledge, ability and skills in the field of given task.

I would be willing to contribute my best for success of the company.

POSITION APPLIED: Driver/ Electrical technician

PERSONAL DATA:

Age : 34 years

Gender : Male

Date of Birth : 04,27 1982

Place of Birth: Patimbao,Sta.Cruz.Laguna

Nationality : Filipino

Status : Married

EDUCATIONAL BACKGROUND:

Secondary Level

United Evangelical Church School

Sta.Cruz,Laguna.

Year: 2001

Vocational :

Electrical

Technical Education Skills and development authority

National Certificate II in Electrical.

July 8.2008

SEMINAR:

Disaster Management and Emergency Preparedness Training

CBK, Kalayaan Laguna

September 2, 2008.

CERTIFICATE OF RECOGNITION:

SELFLESSLY RESFONDING TO FIRE INCIDENT

"CURRENT TRANFORMER EXEXPLOSION”

At KPSPP Switchyard,Brgy.San Juan,Kalayaan,Laguna

Dec 16, 2006.

WORK DESCRIPTION:

Harty Inc Philippines:

1. Conduct preventive and Corrective maintenance at 230KV,115KV & 13.8KV

Switch yard equipment.

2. Monitor and record SF6 pressure gas of 230KV & 13.8KV at main Circuit breaker.

3. Monitor and record winding & oil temperature of 230KV &115KV at

main Power Transformer.

4. Charge SF6 gas at 230KV main Circuit Breaker.

5. Installation of Current Transformer at 230KVswitchyard.

6.Correction of hotspot in Disconnect Switches.

7. Degasifying and hot Oil circulation at main Power Transformer.

8. Re- tape the Transformer winding of main Power Transformer.

9.Repair the leak of main Power transformer.

10.Conduct electrical test at Switchyard equipment.

11. Simulate the mechanical protection of main power transformer

12. Clean the fist and finger contact of Disconnect switches.

13.Inspected and clean the electro valve filter main circuit breaker.

14.testing and commissioning of switchyard equipment.

Larsen and Toubro:

1.Termination and Modification of Relay and Local Control panel.

2. Installation of gas insulated switch gear 220kv.

3.Cable tag and Ferrule making.

4.High voltage fitter.

Work experience:

1. Facility Electrical maintenance

Centerpoint builder supply

Binan Laguna. August 2003 – July2006

2. Electrical Technician/Driver

Harty Incorporated Philippines

9Batangas St,Bago Bantay,Quezon City

Date:July 2006-January 30,2014

3Larsen and toubro

Electrician/testing and commissioning dept/Boom truck operator

Doha Qatar

Feb 2,2014 to August 31,2016

Project assigned location

1.CBK Power Company LTD

Kalayaan Hydro Electric Power Plant (KPSPP)

& Caliraya Hydro Electric Power Plant (CHEPP) Laguna.

Maintenance of 230KV/ 13.8KV/ & 115KV

Substation equipment.

Date:July 2006-August 2008

2.CBK Power Company LTD

Kalayaan Hydro Electric Power Plant (KPSPP) Laguna.

Rehabilitation of 230KV SF6 Main Circuit Breaker

July 2007-August2007.

3.CBK Power Company LTD

Kalayaan Hydro Electric Power Plant (KPSPP) Laguna.

Rehabilitation of 62.5 MVA Substation Transformer

Date: August 2007-March 2008.

4.CBK Power Company LTD

Caliraya Hydro Electric Power Plant (CHEPP) Laguna.

Installation of SF6 Pressure Gauge of 13.8KV Circuit Breaker.

Date: April 2008- May 2008

5.National Grind Corporation of the Philippines.

San Jose Del Monte, Bulacan

Rehabilitation of 300MVA Substation Transformer

230/ 115KV & 13.8KV Date: August 2008-January 2009

6.First Gas Power Company

Calaca Coal Fired Power Plant

Conduct Electrical test and Preventive Maintenance at 230KV Switchyard

Date: November 2008- December 2008

7.S/N Aboitiz

Magat Power Plant

Rehabilitation of 112 MVA unit2 Main Transformer

Date: March 2009-August 2009

8.Fasar Copper Refinery

Isabel Leyte.

Conduct Electrical Test and Preventive Maintenance of Switchyard equipment.

Date: February 6, 2010- February 25, 2010

9.CBK Power Company LTD

Calisaya & Kalayaan Hydro Electric Power Plant

Maintenance of 13.8 KV, 115KV & 230KV Switchyard Equipment.

MDate: August 17, 2010-October 2010

10S/N Aboitiz

Magat Power Plant

Rehabilitation of 112 MVA unit4 Main Transformer

Date: October 2010-March 2011

11.National Grind Corporation of the Philippines

Compostela Valley Mindanao.

Replacement of tap changer at 50MVA Transformer

Date: July 2011

12.CBK Power Company LTD

Kalayaan Hydro Electric Power Plant

Maintenance of 230KV Switchyard equipment

Date: August 2011 to present

13.KILLS AND KNOWLEDGE

1. Electrical Testing such as,

2. Insulation resistance test, winding resistance

3. Oil test, contact resistance test, ratio and timing test.

4. Computer literate

5. Oil filtering machine operator

6.Boom truck operator

7. Driving

8. Welding

CHARACTER REFFERENCES:

Engr: fritam bowshik

Larsen and toubro electrical manager

Tel No# +974********

Engr: Jonji Rosalda

CBK Power Plant Operation Manager

Tel No#091********

Engr: Joel Limpengco

DPWH District engineer

Los Banos Laguna.

Tel: No# (049-***-****.



Contact this candidate