Email: *****************@*****.***
Brgy: Patimbao Sta Cruz,Laguna.
Cel #: +639*********
Tin#: 231-***-***-***
SSS#:041*******
Pag-IBIG I.D#:107*-****-****
Phil Health#:08-050452418-7
JOB OBJECTIVE :
To be able to apply my knowledge, ability and skills in the field of given task.
I would be willing to contribute my best for success of the company.
POSITION APPLIED: Driver/ Electrical technician
PERSONAL DATA:
Age : 34 years
Gender : Male
Date of Birth : 04,27 1982
Place of Birth: Patimbao,Sta.Cruz.Laguna
Nationality : Filipino
Status : Married
EDUCATIONAL BACKGROUND:
Secondary Level
United Evangelical Church School
Sta.Cruz,Laguna.
Year: 2001
Vocational :
Electrical
Technical Education Skills and development authority
National Certificate II in Electrical.
July 8.2008
SEMINAR:
Disaster Management and Emergency Preparedness Training
CBK, Kalayaan Laguna
September 2, 2008.
CERTIFICATE OF RECOGNITION:
SELFLESSLY RESFONDING TO FIRE INCIDENT
"CURRENT TRANFORMER EXEXPLOSION”
At KPSPP Switchyard,Brgy.San Juan,Kalayaan,Laguna
Dec 16, 2006.
WORK DESCRIPTION:
Harty Inc Philippines:
1. Conduct preventive and Corrective maintenance at 230KV,115KV & 13.8KV
Switch yard equipment.
2. Monitor and record SF6 pressure gas of 230KV & 13.8KV at main Circuit breaker.
3. Monitor and record winding & oil temperature of 230KV &115KV at
main Power Transformer.
4. Charge SF6 gas at 230KV main Circuit Breaker.
5. Installation of Current Transformer at 230KVswitchyard.
6.Correction of hotspot in Disconnect Switches.
7. Degasifying and hot Oil circulation at main Power Transformer.
8. Re- tape the Transformer winding of main Power Transformer.
9.Repair the leak of main Power transformer.
10.Conduct electrical test at Switchyard equipment.
11. Simulate the mechanical protection of main power transformer
12. Clean the fist and finger contact of Disconnect switches.
13.Inspected and clean the electro valve filter main circuit breaker.
14.testing and commissioning of switchyard equipment.
Larsen and Toubro:
1.Termination and Modification of Relay and Local Control panel.
2. Installation of gas insulated switch gear 220kv.
3.Cable tag and Ferrule making.
4.High voltage fitter.
Work experience:
1. Facility Electrical maintenance
Centerpoint builder supply
Binan Laguna. August 2003 – July2006
2. Electrical Technician/Driver
Harty Incorporated Philippines
9Batangas St,Bago Bantay,Quezon City
Date:July 2006-January 30,2014
3Larsen and toubro
Electrician/testing and commissioning dept/Boom truck operator
Doha Qatar
Feb 2,2014 to August 31,2016
Project assigned location
1.CBK Power Company LTD
Kalayaan Hydro Electric Power Plant (KPSPP)
& Caliraya Hydro Electric Power Plant (CHEPP) Laguna.
Maintenance of 230KV/ 13.8KV/ & 115KV
Substation equipment.
Date:July 2006-August 2008
2.CBK Power Company LTD
Kalayaan Hydro Electric Power Plant (KPSPP) Laguna.
Rehabilitation of 230KV SF6 Main Circuit Breaker
July 2007-August2007.
3.CBK Power Company LTD
Kalayaan Hydro Electric Power Plant (KPSPP) Laguna.
Rehabilitation of 62.5 MVA Substation Transformer
Date: August 2007-March 2008.
4.CBK Power Company LTD
Caliraya Hydro Electric Power Plant (CHEPP) Laguna.
Installation of SF6 Pressure Gauge of 13.8KV Circuit Breaker.
Date: April 2008- May 2008
5.National Grind Corporation of the Philippines.
San Jose Del Monte, Bulacan
Rehabilitation of 300MVA Substation Transformer
230/ 115KV & 13.8KV Date: August 2008-January 2009
6.First Gas Power Company
Calaca Coal Fired Power Plant
Conduct Electrical test and Preventive Maintenance at 230KV Switchyard
Date: November 2008- December 2008
7.S/N Aboitiz
Magat Power Plant
Rehabilitation of 112 MVA unit2 Main Transformer
Date: March 2009-August 2009
8.Fasar Copper Refinery
Isabel Leyte.
Conduct Electrical Test and Preventive Maintenance of Switchyard equipment.
Date: February 6, 2010- February 25, 2010
9.CBK Power Company LTD
Calisaya & Kalayaan Hydro Electric Power Plant
Maintenance of 13.8 KV, 115KV & 230KV Switchyard Equipment.
MDate: August 17, 2010-October 2010
10S/N Aboitiz
Magat Power Plant
Rehabilitation of 112 MVA unit4 Main Transformer
Date: October 2010-March 2011
11.National Grind Corporation of the Philippines
Compostela Valley Mindanao.
Replacement of tap changer at 50MVA Transformer
Date: July 2011
12.CBK Power Company LTD
Kalayaan Hydro Electric Power Plant
Maintenance of 230KV Switchyard equipment
Date: August 2011 to present
13.KILLS AND KNOWLEDGE
1. Electrical Testing such as,
2. Insulation resistance test, winding resistance
3. Oil test, contact resistance test, ratio and timing test.
4. Computer literate
5. Oil filtering machine operator
6.Boom truck operator
7. Driving
8. Welding
CHARACTER REFFERENCES:
Engr: fritam bowshik
Larsen and toubro electrical manager
Tel No# +974********
Engr: Jonji Rosalda
CBK Power Plant Operation Manager
Tel No#091********
Engr: Joel Limpengco
DPWH District engineer
Los Banos Laguna.
Tel: No# (049-***-****.