CURRICULUM VITAE

Name of Person : RAHEEL AHMED

Name of Firm : National Engineering Services Pakistan (Pvt.)

Ltd., (NESPAK) – A Private Limited Company by Government of Pakistan

Nationality : Pakistani

Date & Place of Birth : March 22nd 1982 - Karachi

Profession : Civil Engineer

Position in Firm : Senior Engineer / Project Manager

Specialization in Firm : Project Management & Coordination

(Airport Projects)

Year of Joining Firm : 2005

Registration number

With Pakistan Engineering

Council : CIVIL / 25390

Affiliation with Professional : Member, Pakistan Engineering Council

Institution Member, IIEP

Marital Status : Married

KEY QUALIFICATIONS

Practicing professional engineer since 2005.

As Project Manager for MKK (Mirpurkhas Khipro) Airstrip near Tando Adam Sindh & Pavement Rehabilitation Works at Khaskheli Airstrip Project for United Energy Pakistan (former British Petroleum).

As Project Coordinator for PIA’s Various Buildings Projects (including Hangers, Flight Kitchen, Technical Ground Services, ULD, Cargo Complex) at New Islamabad International Airport.

As Project Coordinator/Civil Engineer for Sindh Basic Education Program - Milestone Monitoring Services for Construction of Schools in Flood Affected Areas of Sindh funded by USAID.

As Project Coordinator for the Expansion of Lounges at Allama Iqbal International Airport (AIIAP) Lahore (2013), Expansion of Terminal Building at Bacha Khan International Airport Peshawar and Expansion of International Wing of Terminal Building at AIIAP Lahore (2014-15).

As Project Coordinator for Benazir Bhutto International Airport (BBIA) Project, being carried out in a joint venture with ADPi, France, involved in project management, coordination & liaison with Client (CAA), Project Management Consultant (The Louis Berger Group) and several contractors (LTH JV, Siemens, ATL & Beixin Gammon JV) working on different work packages.

As Project Coordinator for New ATC Complex at Jinnah International Airport, Karachi.

Also involved in technical coordination for New Gwadar International Airport (NGIA) project.

As Construction & Coordination Engineer on Pakistan International Container Terminal Project, East Wharf, Kemari, Karachi Port. Before commencement of construction contract at PICT, I was involved in pre-construction activities at NESPAK’s Karachi Office, Projects Division. Project successfully completed in June 2010.

ACADEMIC QUALIFICATION

Name of Institution Year Degree

N.E.D. University of 2005 B.E. Civil Engineering

Engineering & Technology (Secured 3rd Position in Civil Engineering Department)

N.E.D. University of 2008 M. Engg. (Structures)

Engineering & Technology (CGPA = 3.35)

TRAINING COURSES

-Introduction to Project Management

-Leadership

-Presentation Skills

-Client Interaction

-Introduction to Writing Skills

-Project Management (Level-II)

-Writing Skills (Level-II)

-Effective Project Proposal Development

-Advance Presentation Skills

-Interpersonal Skills

-Problem Solving & Decision Making

-Primavera

-MS-Excel 2007

-Advance MS Excel

AWARDS & PROMOTIONS

-For the year 2012-2013 NESPAK awarded HONORARIUM on my performance.

-Promoted to Grade 10 (Senior Engineer) from Grade 9 (Senior Engineer) on my performance during year 20011-2012

-For the year 2010-2011 NESPAK awarded LETTER OF APPRECIATION on my performance.

-For the year 2009-2010 NESPAK awarded HONORARIUM on my performance.

-Promoted to Grade 9 (Senior Engineer) from Grade 8a (Junior Engineer) on my performance during year 2007-2008.

-For the year 2006-2007 NESPAK awarded HONORARIUM on my performance.

EMPLOYEMENT RECORD

I. Name of Employing Agency NESPAK

Title of Position Senior Engineer

Location of Assignment Project Management Section

NESPAK Karachi

Period of Assignment June 2010 to date

1.Pavement Rehabilitation Works at Khaskheli Airstrip:

Scope of Works:

United Energy Pakistan Ltd. (UEP), former British Petroleum, invites NESPAK to provide Consultancy Services for the Planning & Detailed Design of Pavement Rehabilitation works at Khaskheli Airstrip. The scope of works include asphalt overlay over runway, apron, shoulder and dressing, filling & compaction of unpaved areas surrounding runway including runway over-run. Also includes removal and raising of Airfield Lights including Combined Threshold, Runway Edge Lights and End Inset Lights. Final Bidding Documents have been issued to Client for onward issuance to the contractors, project is ongoing. Project Cost is approx. 60 million and Design Fee is Rs. 2.0 million.

Designation: Project Manager

Activities:

Coordination & liaison with Client.

Collection/review of data and requirements from Client.

Technical coordination between different engineering specialties in preparation & finalization of design.

Review of Draft Bid Document (including drawings, BoQ & specifications), Final Bid Document, Cost Estimates, Construction Drawings and onward submission to Client.

Submission of Invoices to Client and maintain payment reconciliation record.

Assisting the Client in prequalification of the Contractors.

Preparation and updating of Project Execution Plan, Control Estimate and other ISO Certification documentation.

Assistance to Client and site staff during provision of Field Design Support Services and execution of works.

2.MKK (Mirpurkhas Khipro) Airstrip near Tando Adam Sindh:

Scope of Works:

United Energy Pakistan Ltd. (UEP), former British Petroleum, invites NESPAK to provide Consultancy Services for Master Planning, Detailed Design and Construction Supervision Services for complete Airstrip Project including Runways System with CAT-I Airfield Lighting, NAVAIDS, Passenger Lounge Building with Aviation Observation Room, GSE Shed, Gate House & Guard’s Dormitory, Vault Station, Slow Rate Land Treatment System, Solar Powered Fence Lighting, Water Supply, Sewerage, Storm Water Drainage, Road, network, Electrical, CCTV, Fire Alarm and other infrastructure facilities. Draft Bidding Documents have been finalized submitted to Client and the project is presently on-hold due to land availability issues. Project Cost is around 1500 million including both Civil and E&M Works and Design Fee is Rs. 16.5 million.

Designation: Project Manager

Activities:

Coordination & liaison with Client.

Collection/review of data and requirements from Client.

Assistance to Airfield Facility Planner in preparation of Master Plan.

Technical coordination between different engineering specialties in preparation & finalization of design

Review of Master Plans, Concept Design, Final Design, Draft Bid Document, Final Bid Document, Prequalification Document, Prequalification Evaluation Report, Bid Evaluation Report, Cost Estimates and onward submission to Client.

Submission of Construction Drawings to Client.

Coordination with Client and Specialties for design clarifications and other construction related issues during execution stage.

Submission of Invoices to Client and maintain payment reconciliation record.

Assisting the Client in prequalification of the Contractors.

Preparation and updating of Project Execution Plan, Control Estimate and other ISO Certification documentation.

Project close out.

3.Design Vetting of Vessel’s Foundation at Niamat Gas Field, Sindh:

Scope of Works:

United Energy Pakistan Ltd. (UEP), former British Petroleum, directly awarded this job to NESPAK upon satisfactory provision of services at MKK Airstrip. Scope of works comprising of the design vetting services for the facilities listed below to be installed at Niamat Gas Filed. Project’s first phase completed. Design Vetting Fee, for the first phase of works, is Rs. 0.525 million.

Regenerator No. 01

Absorber No. 02

Regenerator No. 03

Absorber No. 04

Designation: Project Manager

Activities:

Coordination & liaison with Client.

Collection/review of data and requirements from Client.

Technical coordination.

Review of Design Vetting Report.

Submission of Invoices to Client and maintain payment reconciliation record.

4.PIA’s Various Buildings Projects (including Hangers, Flight Kitchen, Technical Ground Services, ULD, and Cargo Complex) at New Islamabad International Airport (NIIA):

Scope of Works:

Scope of works of PIA’s Various Buildings at NIIA Project includes Master Planning, Architectural Concept Layout, Detailed Design and Construction Supervision Services of Wide Bodied Aircraft Hangar, Narrow Bodied Aircraft Hangar (each having parking capacity for 02 two aircrafts), Flight Kitchen including Catering, Stores & PIAs Office Complex, Technical Ground Services including Workshop, Fuel Pump, Parking of Vehicles and other Motorized Equipments etc., ULD Storage and Stacking Areas and Interior & MEP designing of Cargo Complex along with interfacing of all facilities with existing infrastructure facilities. Project is ongoing and in concept design development phase. Project Cost is around 10 billion and Consultancy Fee is Rs. 92.2 million.

Designation: Project Coordinator

Assisting Division Head (Project Manager) on this Job

Activities:

Coordination & liaison with Client.

Collection/review of data and requirements from Client for each facility.

Site Visits.

Technical coordination between different engineering specialties in preparation & finalization of design

Meeting with Client at various stages of design activities for incorporation of Client’s requirements.

Review of Concept Design, Final Design, Draft Bid Document, Final Bid Document, Prequalification Document, Prequalification Evaluation Report, Bid Evaluation Report, Cost Estimates.

Coordination with Client and specialties for design clarifications and other construction related issues during execution stage.

Preparation of Invoices and maintain payment reconciliation record.

Assistance to PM and Contract Engineer in prequalification of the Contractors.

Preparation and updating of Project Execution Plan, Control Estimate and other ISO Certification documentation.

5.Sindh Basic Education Program - Milestone Monitoring Services for Construction of Schools in Flood Affected Areas of Sindh:

Scope of Works:

The Sindh Basic Education Program (SBEP) aims to improve the educational system and related infrastructure in Sindh. Under an agreement signed with the Government of Sindh (GoS) in September 2011, USAID will provide US$ 81 million to GoS for the construction of around 150 schools in various districts of Sindh.

The planning and design of the new schools is being undertaken by M/s. Halcrow, who is designated as the Architect-Engineer Services Task Order Contractor (AETOC). The AETOC will also be providing construction supervision services and act as the “Engineer” during execution of construction contracts. Fourteen construction packages are anticipated with each package consisting of a number of schools.

In order to verify and monitor the achievement of payment milestones, identified in fixed amount reimbursement agreements (FARAs) between USAID and GoS, USIAD has appointed NESPAK as its contractor to provide the requisite architect-engineer services. NESPAK will perform the services in association with Associates in Development (AiD) and Technology & Resource Development Pvt. Ltd. (TECHRED).

NESPAK’s scope of work comprises of verification and monitoring of construction milestones for the schools to be constructed under the SBEP. Each school in each construction package will have pre-determined milestones, mutually agreed upon by USAID and the GoS. Project is ongoing and Consultancy Fee is Rs. 143.5 million.

Designation: Civil Engineer / Project Coordinator.

Assisting Division Head (Project Manager) on this Job

Activities:

Review of Tender Documents prepared by AETOC to have a clear understanding of standards specified for execution and verification of works.

Review of Quality Assurance Program of AETOC and Quality Control Plan of construction contractor.

Prepared Milestone Monitoring Performa’s for various stages of works approved by USAID.

Preparation of Annual Work Plan, Annual Implementation Reports and other documentation.

Preparation of Invoices and record keeping of all reimbursable payments for Audit by USAID.

Staff deployment plan according to project implementation schedule.

Attended meeting, training programs and seminars.

Preparation and updating of Project Execution Plan, Control Estimate and other ISO Certification documentation.

Assistance to PM for in-house and other technical coordination.

6.Benazir Bhutto International Airport, Islamabad (Job No. 2927)

Scope of Works:

BBIA project is being carried out in joint venture with ADPi, France, involved in project management, coordination & liaison with Client, (CAA), Project Management Consultant and Contractors (LTH JV, Siemens, ATL, Beixin Gammon JV). NESPAK's scope covers design and tender documents for 12 construction packages and Field Design Support Services for all airside and landside infrastructure works for this project which includes Departure Level Bridge, Under Passes, Retaining Walls, PTB Link Bridge, Water Works, Reservoirs, Treatment Plant, Lift Stations, Water Tower, ATC Complex, FCR Building, Radar & Radio Building, Airfield Lighting, Vault Stations, Sub Stations, Hydrant Refueling System, NAVAIDS & ATC Equipment Landside Roads, Drainage and other Infrastructure Facilities. Project estimated cost is approx. Rs. 90 billion. Airside Infrastructure, Landside Infrastructure and other work packages are under construction while few packages are nearing completion. Also provided construction supervision services for a period of 3 years. Presently providing Field Design Support Services to CAA. Fee for Consultancy Services is around Rs. 260 million.

Designation: Project Coordinator.

Assisting Division Head (Project Manager) on this Job

Activities:

Field Design Support Services for all airside and landside infrastructure works, mainly coordinating shop drawings with all trades in design office and with Clients site staff.

Technical coordination between different engineering specialties in preparation & finalization of design, cost estimates, rate analyses, measurement sheets, final construction drawings and other technical documents for different construction packages.

Revised PC-1 Document.

Assisting G.M/P.M in preparation of Field Design Support Service (FDSS), Construction management Supervision Services (CMSS) and Design invoices of NESPAK to the Client.

Prequalification of contractors for various upcoming work packages.

Assisting G.M/P.M in technical and contractual correspondence with the Client and the Contractor.

Issuance of construction drawings for Package-1 Airside Infrastructure works, Package-7A AFL works, Package-6 HRS works, Package 8A Landside Infrastructure works, Package 8B Electrical & Telecommunication works & Package 8C-1 ATC Complex & FCR Building works.

Updating and keeping the technical data like shop drawings review status, log of pending drawings & schedules, travelling record of BBIA Site for billing purpose and maintaining office record pertaining to BBIA project as per ISO requirements/ standards.

In-house coordination for preparation of combined services drawings.

Coordination with M/s. CPG though PMC for various underground infrastructure services around Passenger Terminal building (PTB).

7.Expansion of Lounges in Passenger Terminal Building at Allama Iqbal International Airport (AIIAP) Lahore (2015):

Scope of Works:

The earlier planned expansion works, in year 2013, were not implemented by Civil Aviation Authority (CAA). In year 2015, CAA has again planned the expansion of Existing Passenger Terminal Building (PTB) at AIIAP Lahore. The main objective of this expansion is to undertake major expansion of the existing Passenger Terminal Building (PTB) to enhance its annual passenger handling capacity from 6.5million to around 20million with world class facilities to cater for the requirements for the next 15 to 20 years.

The scope of works includes Master Planning, Detailed Design and Supervision Services the expansion of Passenger Terminal Building and Allied Facilities, Pavement Works including Link Taxiway & Apron, Passenger Boarding Bridges, Airfield & Apron Lighting, Car Park and other related Infrastructure facilities including storm drainage, water, sewerage, fire fighting, electrical and communication networks.

NESPAK in JV with Foreign Consultants, UK based, is provisionally pre-qualified and presently developing schemes/options for Expansion of Terminal Building for being approved by Competent Authorities which is mandatory for pre-qualification procedure.

Designation: Project Coordinator

Assisting Division Head (Project Manager) on this Job

Activities:

Prepared and submitted Expression of Interest document for Pre-qualification of Consultant.

Assisting PM, Architects, and Foreign Partners in developing schemes / options for Expansion of Terminal Building.

Correspondence with Client.

In-house coordination meetings and conference call with Foreign Partners for exchange of views on design schemes.

After award of works complete planning and design services shall be provided by NESPAK.

8.Renovation and Expansion of Terminal Building at Bacha Khan International Airport (BKIAP) Peshawar:

Scope of Works:

Bacha Khan International Airport (BKIAP) Peshawar is a major CAA airport, serving the provincial capital and surrounding region. Its Passenger Terminal is congested and is inadequate for proper and smooth operations. The passengers and functionaries are facing difficulties due to shortage of space. Therefore, CAA has decided to expand the facilities at the existing Terminal Building to provide relief to the passengers and functionaries for smooth operations.

CAA has awarded the Consultancy Services for planning, design and supervisions of Renovation and Expansion works at BKIAP Peshawar to NESPAK which includes development of new Domestic Departure and Arrival Areas and conversion of existing Terminal Building into International Departures and Arrivals with Expansion of Arrival Lounge/Departure Lounges, Check-in Area, existing Public Concourse on the Landside and remodeling of Toilets and Offices/Facilities/Services, remodeling of Baggage Conveyor Belts, relocation of existing utilities etc. NESPAK completed Design and submitted Final Bid Documents to the Client. Project Cost was Rs. 2 billion and Design Fee was Rs. 25 million.

Designation: Project Coordinator

Assisted General Manger, Projects (Project Manager) on this Job

Activities:

Preparation of Consultancy Contract Agreement.

Meeting with Clients and in-house meetings for design coordination.

Technical coordination between different engineering specialties in preparation & finalization of design alternatives / options for Concept Design based on as-built conditions.

Prepared Project Execution Plan, Control Estimate and other ISO Certification documentation.

Prepared Site Visit Reports highlighting present condition of facilities.

Prepared Invoices.

Assisted to G.M/P.M in technical and contractual correspondence with the Client.

9.Expansion of Lounges in Passenger Terminal Building at Allama Iqbal International Airport (AIIAP) Lahore (2013):

Scope of Works:

Allama Iqbal International Airport, Lahore is the country’s second busiest airport. In case more than one flight arrival at the same time, extensive overcrowding, congestion and long queues are noted in the Immigration Hall. This causes passenger discomfort and inconvenience.

In order to resolve the problems at the Immigration Hall, Pakistan Civil Aviation Authority plans to extend the International wing of the Terminal Building. Civil Aviation Authority (CAA) has awarded NESPAK the Consultancy Services for Planning & Designing of Expansion of Lounges at Allama Iqbal International Airport (AIIAP), Lahore. NESPAK has prepared design and bid documents for Extension of Terminal Building (Arrival & Departure Lounges). This additional area will greatly enhance the comfort level at the Immigration Hall and result in a smooth processing of international arriving passengers. The extension at Level 2 will provide additional space for Immigration counters for departures as well as for security control. NESPAK has prepared and submitted Final Bid Documents to CAA but the project was not implemented. Project Cost was 225 million and Design Fee was Rs. 8.0 million.

Designation: Project Coordinator

Assisted General Manger, Projects (Project Manager) on this Job

Activities:

Prepared Consultancy Contract Agreement.

Meeting with Clients and in-house meetings for design coordination.

Technical coordination between different engineering specialties in preparation & finalization of design alternatives / options for approval of the competent Authority, Detailed Engineering Designs of the selected option, preparation of Bid Documents including technical Specification, BOQs and Conditions of Contract, Cost Estimates etc.

Assisted PM in prequalification of the contractors.

Prepared Project Execution Plan, Control Estimate and other ISO Certification documentation.

Prepared PC-1 Document.

Preparation of Invoices.

Assisted G.M/P.M in technical and contractual correspondence with the Client.

10.New Gwadar International Airport:

Scope of Works:

Scope of works for NGIA Project involves master planning, detailed design, FDSS and supervision for complete new airport. Project cost Rs. 22 billion. First phase i.e. site protection works have already been completed in 2015. NESPAK has completed design and submitted Bid Documents to CAA. NESPAK Fee for Design Services is Rs. 131 million.

Designation: Senior Engineer – Airside Design Activities

Assisted General Manger, Projects (Project Manager) in absence of Project Coordinator.

Activities:

Involved in design activities including following:

oDetermined Runway Orientation

oComputed Height of Air Traffic Control Tower

oComputed Response Time computation for Rescue & Fire Fighting Services and worked out various possible options.

Involved in technical & contractual correspondence with Client (CAA) & Contractor (FWO), prepared monthly progress reports, issuance of construction drawings, coordination for submittals and other sire related issues.

Prepared of monthly construction supervision invoices.

11.ATC Complex at Jinnah International Airport, Karachi:

Scope of Works:

This project was also being carried out in joint venture with ADPi, France. Scope of works consists of complete and comprehensive development of new Air Traffic Control Tower Complex at Jinnah International Airport, Karachi from inception of design to commissioning of the project for full scale regular operations. The project scope in actual terms would be two-fold:

Planning, Design & Construction supervision.

Hooking-up of the New ATC Complex with other existing services/components.

For providing above specified services, CAA advised NESPAK to carry out detailed study & analysis of existing related services, detailed programming for hook-up with the new complex including Air Field Lighting, CNS/ATM equipment. Project NESPAK has prepared and submitted Concept Designs to CAA after which the project was abandoned by the Client. Design Fee was Rs. 7.2 million.

Designation: Project Coordinator

Assisted General Manger, Projects (Project Manager) on this Job

Activities:

Technical coordination between different engineering specialties in preparation & finalization of concept design.

Assisted PM in correspondence with Client.

Assisted PM in preparation of design invoices.

Business Acquiring Activities:

Beside project management & project coordination, I am also involved in Business Acquiring activities like preparation of Expression of Interests (EOI), Technical Proposals and Financial Proposals. So far, I have developed EOI’s and Proposals for the below listed projects:

Consultancy Services For Reconstruction and Up-gradation Of Main & secondary Runway at Allam Iqbal International Airport, Lahore. (EOI and Technical & Financial Proposal)

Development / upgradation Of Runways, Terminal Buildings & Allied Facilities At Airports In Pakistan (EOI and Technical & Financial Proposal).

Consultancy Services for Airport Master Planning Activities For Herat Airport (EOI Document).

Consultancy Services for Preliminary & Detailed Designs for Rehabilitation of Old Passenger Terminal Building Facilities at Jomo Kenyatta International Airport

(Unit 1, 2, 3 and Arrival Buildings), Nairobi (EOI Document).

Consultancy Services for Various Refurbishment Works at the Passenger Terminal Building, Muscat International Airport, Oman (Technical & Financial Proposals).

Consultancy Services for Feasibility Study for Development of Sustainable Rain Water Resources / Dams at New Benazir Bhutto International Airport Project Islamabad (EOI Document).

Consultancy Services for Renovation of Existing Terminal Buildings in Pakistan (EOI Document)

Consultancy Services for Design of Infrastructural Facilities for Air Cargo and Freeport Zone at SSR International Airport (EOI Document).

Consultancy Services for Carrying Out Feasibility Study and Detailed Engineering Design of Eleven (11) Airports in Tanzania (EOI Document).

Consultancy Services For Reconstruction and Up-gradation Of Main Runway at Jinnah International Airport, Karachi. (EOI and Technical & Financial Proposal)

Consultancy Services for Reconstruction of Main Runway at Quetta International Airport. (EOI and Technical & Financial Proposal)

Consultancy Services for Various Refurbishments Works at the Passenger Terminal Building Muscat International Airport. (Technical & Financial Proposal)

Consultancy Services for Construction Supervision for Expansion of Mukalla International Airport (EOI Document).

Consultancy Services for Airport Master Planning Activities for Heart Airport, Afghanistan (EOI Document).

Consultancy Services for Feasibility Study For Zaranj Airport, Afghanistan (EOI Document).

ISO 9001:2000 Quality Management System:

Designation: Assistant Coordinator QMS (Quality Management System)

Activities:

Assisted Chief ISO Coordinator in both Internal & External Quality Audits for NESPAK Karachi Office. My responsibilities includes assistance to ISO Coordinator during Audits, closure of Audit Report, compliance of Audit Findings, coordination with all design specialties for preparation and updating Design & Quality Plans, Process and Quality Plans and other ISO related documentations including Logs of Preventive Action, Log of Clients Feed Back, Log of Client Complaint, Client Satisfaction etc.

Responsible for Internal & External Quality Audits of Project Management section which includes QAG Documentation, preparation & up-dating Project Execution Plans (PEP), Logs of Preventive Action, Log of Clients Feed Back, Log of Client Complaint etc.

Extra Curricular Activities:

Active member of organizing team for extra circular activities including annual Dinners, Farewell Parties, Annual Day 2012 etc. and hosted the event aswell.

II. Name of Employing Agency NESPAK

Title of Position Senior Engineer

Location of Assignment Pakistan International Container Terminal, Karachi Port (Job 2349)

Period of Assignment October 28, 2005 - May 31, 2010

1.Pakistan International Container Terminal (PICT), East Wharf, Karachi Port:

Scope of Works:

PICT is the only private container terminal in Pakistan sponsored and owned by Pakistanis. It is the first port infrastructure project in Pakistan financed by International Finance Corporation (IFC) the private sector arm of World Bank.

PICT Container Terminal is a fully established and modern Container Terminal having an approx area of 200, 000 Sq.m and has a quay wall of 600m. PICT is located at Berths 6-9, East Wharf, Karachi Port. PICT Container Terminal is developed in three phases.

The Terminal is being operated in the private sector on Built, Operate & Transfer (BOT) basis. The Terminal is spread over an area of 210,000 m2 and has 600 m of quay frontage. The Terminal is designed to handle 150,000 TEU’s per annum in the first phase of its development. Ultimately, it will be able to handle over 350,000 TEU’s per annum.

The terminal is equipped with modern container handling equipments including 06 nos. of ship to shore (STS) quay side gantries, 20nos. rubber tyred gantries (RTG), 15 nos. reach stackers and other container handling equipments. The terminal has 250 fixed reefer outlets for handling refrigerated containers.

Designation: Construction Engineer & Project Coordinator

Also acted as Engineer’s Representative for a brief period of time.

Activities:

As Construction Engineer responsible to supervise, check and monitor quality of works as per drawings & specifications. The responsibilities also included preparation of progress reports, Assessment of Quantum of works, checking of claims & extra items and preparation of physical as well as financial status of works. Construction of PICT Container Terminal carried out in three different phases. I have joined PICT at beginning of Phase-II works and continued working on this project till completion of final phase i.e. Phase-III works.

Phase-II: Phase-II Works comprising of Civil Works and Area Lighting

Phase-III: Phase-III Works comprising of following listed Packages

Civil Works and Area Lighting

Container Scanner Building

Bridge Works

Documents Process Centre Building

Details of construction supervision and quality control activities on different work packages are as listed below

Civil Works and Area Lighting (Phase-II & III Works):

Scope of