Mobile No: 099********
E-Mail: ***********@*****.***
Curriculum Vitae
Application for the Post : Field Piping Engineer
Vital Kumar gajre
PIPING ENGINEER AYTB FABRICATION & CONSTRUCTION COMPANY AT SAUDIA ARABIA
Field piping engineer construction at Geodesic Techniques pvt ltd at Bangalore Karnataka
Piping engineer Construction at CCIC DOHA QATAR
Piping engineer Construction at ALMUTHA CONSTRUCTION CO DOHA QATAR .QATAR PETROLIUM
Piping engineer Construction at NAFAL CONSTRUCTION COMPANY OMAN
Assistant Engineer at PUNJLOYD LTD Company Mumbai
Site engineer at DAS OFFSHORE ENGINEERING PVT LTD MUMBAI
site Engineer at OHCS offshore engineering pvt
VITTAL KUMAR GAJRE
Summary
I have total 15.2 years of professional experience in the project engineering phase of onshore Oil and Gas, LNG, Refinery, Petrochemical, gas processing plant. Fabrication, Modification and Erection of Piping & Structural steel construction and Hydro test, pre Mechanical commissioning in India and abroad. Experience ranges from the fabrication, erection, line checking, Pressure testing, Reinstatement and Pre commissioning of various process equipments, piping systems, equipments, etc. and coordinating with various departments including Quality control, field engineering, Planning, fabrication and Erection site erection crew.
Plans & supervises the construction functions -Ensure the proper completion of the work on schedule with approved drawings, specifications, quality limitations. Monitor sub-contractors work to ensure proper compliance with all technical aspects. -Knowledge of ASTM/ASME/API standards.
Specialties: Site Representative / Construction, Piping Process and Hydro test Supervisor Onshore Facilities, Refinery projects, LNG Project, Hydrogen gas Project, Water distillation & Power Project, etc Piping Fabrication, Erection &Hydro testing, Line check up to commissioning stage, Bolt torque Inspection
Vittal Kumar gajre Experience
Field piping engineer Construction at AYTB FABRICATION & CONSTRUCTION SAUDIA ARABIA
Project Handled
perto rabic (sabic) PetroChemical Project at Rabic saudia arabia
Yanpet (sabic) Petro chemical project at yanbo saudia arabia
Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.
• Coordinating with Engineering and Construction and liaise with the Client on detail engineering requirements.
• Raising MTO(s) for all materials required to additional materials for hydro test etc.
• Preparation of field piping system test packages,including system limit on P&ID and piping Isometrics
• Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.
• Ensure that hydro test reinstatement is to be done as per procedure.
• Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.
• Elaborates construction feasibility analysis evaluating the available materials & drawings
• Carrying out final P&ID check of installed piping systems in the module.
• Develop Construction Engineering Technology in line with Company Policy and Procedures.
• Ensure all operations are carried out in accordance with Company National and International Health Safety and Environmental Legalization.
• Examine engineering proposals for constructability.
• Maintain the necessary records to ensure full quality assurance requirements are met.
• Organizing and allocation of right manpower for fabrication & erection.
• Coordinating with Planning for work schedules and priorities.
• Coordinating with Safety and QA/ QC dept. for smooth functioning of works
• Reviewing of the progress on daily & weekly basis and analyze the productivity of Resources.
• Re-conciliation of the works executed on regular basis.
Co-ordination with engineering team for Technical queries / Clarifications
Field piping engineer Construction Geodesic fabrication company India
Public Company; 1000+ employees Construction industry
Dec 2 2009 – 9/7/2014 (4 years and 2 months) L&T MUMBAI INDIA
Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.
• Coordinating with Engineering and Construction and liaise with the Client on detail engineering requirements.
• Raising MTO(s) for all materials required to additional materials for hydro test etc.
• Preparation of field piping system test packages,including system limit on P&ID and piping Isometrics
• Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.
• Ensure that hydro test reinstatement is to be done as per procedure.
• Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.
• Elaborates construction feasibility analysis evaluating the available materials & drawings
• Carrying out final P&ID check of installed piping systems in the module.
• Develop Construction Engineering Technology in line with Company Policy and Procedures.
• Ensure all operations are carried out in accordance with Company National and International Health Safety and Environmental Legalization.
• Examine engineering proposals for constructability.
• Maintain the necessary records to ensure full quality assurance requirements are met.
• Organizing and allocation of right manpower for fabrication & erection.
• Coordinating with Planning for work schedules and priorities.
• Coordinating with Safety and QA/ QC dept. for smooth functioning of works
• Reviewing of the progress on daily & weekly basis and analyze the productivity of Resources.
• Re-conciliation of the works executed on regular basis.
Co-ordination with engineering team for Technical queries / Clarifications
Piping engineer Fabrication & Construction
CCIC (CTJV JOINT VENTURE)
Privately Held; 1001-18000 employees; Oil & Gas industry
May 21/2006 – App 5 /2009 (3 years) Doha Qatar QGX-2 TRAIN 4 5 & 6 AND QCS TRAIN 6 GAS PLANTS PROJECTS
Job Profile
• Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.
• Coordinating with Engineering and Construction and liaise with the Client on detail engineering requirements.
• Raising MTO(s) for all materials required to additional materials for hydro test etc.
• Preparation of field piping system test packages,including system limit on P&ID and piping Isometrics
• Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.
• Ensure that hydro test reinstatement is to be done as per procedure.
• Ensure tat all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.
• Elaborates construction feasibility analysis evaluating the available materials & drawings
• Carrying out final P&ID check of installed piping systems in the module.
• Develop Construction Engineering Technology in line with Company Policy and Procedures.
• Ensure all operations are carried out in accordance with Company National and International Health Safety and Environmental Legalization.
• Examine engineering proposals for constructability.
• Maintain the necessary records to ensure full quality assurance requirements are met.
• Organizing and allocation of right manpower for fabrication & erection.
• Coordinating with Planning for work schedules and priorities.
• Coordinating with Safety and QA/ QC dept. for smooth functioning of works
• Reviewing of the progress on daily & weekly basis and analyze the productivity of Resources.
• Re-conciliation of the works executed on regular basis.
Co-ordination with engineering team for Technical queries / Clarifications.
Piping engineer Fabrication & Construction
Almuftha Construction Company
Qatar petroleum gas recycles plant
May 4 /2005 – Sept 2005 (5 months) Qatar
• Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.
• Coordinating with Engineering and Construction and liaise with the Client on detail engineering requirements.
• Raising MTO(s) for all materials required to additional materials for hydro test etc.
• Preparation of field piping system test packages,including system limit on P&ID and piping Isometrics
• Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.
• Ensure that hydro test reinstatement is to be done as per procedure.
• Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.
• Elaborates construction feasibility analysis evaluating the available materials & drawings
• Carrying out final P&ID check of installed piping systems in the module.
• Develop Construction Engineering Technology in line with Company Policy and Procedures.
• Ensure all operations are carried out in accordance with Company National and International Health Safety and Environmental Legalization.
• Examine engineering proposals for constructability.
• Maintain the necessary records to ensure full quality assurance requirements are met.
• Organizing and allocation of right manpower for fabrication & erection.
• Coordinating with Planning for work schedules and priorities.
• Coordinating with Safety and QA/ QC dept. for smooth functioning of works
• Reviewing of the progress on daily & weekly basis and analyze the productivity of Resources.
• Re-conciliation of the works executed on regular basis.
Co-ordination with engineering team for Technical queries / Clarifications.
Site engineer Fabrication & construction
Nafal construction contracting company Oman
Oman Indian fertilizer projects
Public Company; 500+ employees; Oil & Energy industry Oman Indian Fertilizer Company
October 2005 – April 2006 (6 months) Oman
Professional experience in the project engineering phase of onshore Oil and Gas, LNG, Refinery, Petrochemical, gas processing plant construction and Hydro testing, pre commissioning in India and abroad. Experience ranges from the fabrication, erection, Pressure testing and Pre commissioning of various process equipments, piping systems, equipments, skid mounted assemblies, structural etc. and coordinating with various departments including Quality control, Planning, fabrication and site erection crew.
Assistant engineer Fabrication & construction
Punjloyd ltd contracting company India oil refinery at hpcl mumbai india
Sept 28 /1998 – April1/1999 (8 months) INDIA
Supervise Piping modifying for plant shut down preparations. Fabric hydro testing pipe spool piece for hook up and tie –in point for the piping modifications. Checking and planning of how to be done in existing point location while processing operating. Supervise how to cutting, welding and working for safety every point including work permit /fireman, fire water, gas detector checking before work starting and Pressure testing, air blowing.
Piping Supervisor
Dass offshore engineering pvt ltd
Mumbai
Public Company; 500+ employees; Machinery industry
Dec 1/2001-Dec 11/2004 (4 year) India PLATFORM BHN, MNW WATER INJECTION, BLQ1&BLQ2
• Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings
• Ensure the Productivity and Quality is maintained by subordinates.
• Coordinate with other Disciplines in site.
• Request spools, Supports, Fittings and Field erection materials as per schedule
• Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.
• Review technical documentation / drawings / projects / schedules. Responsible for safety and ensure that company safety regulation are applied in all areas.
• Self checking of isometric drawings against Master P & ID considering the integrity of the design base on project requirements, material specification, good design philosophy and practice.
• Responsible for line checking the punch items before hydro test as per P&ID, and ISO drawing prior for testing.
• Responsible for counter checking by Isometric/Piping plan i.e. GA drawing for the spools erected in the correct location, orientation, alignment and plumpness.
Piping Engineer
OHCS OFFSHORE INDIA Ltd
Feb 2004 – May 2005 (1 year 2 months) India
PLATFORM BHN, MNW WATERINJECTION PLANT, BLQ1&BLQ2
Preparation of Consumables & Tool list according to the scope of work
Preparation of work reports and manpower plans
Issuing instruction to subcontractors in order to rectify the defects of the work
Manage the subcontractor foreman and labor
Arrange for the appropriate materials to be drawn from the stores
Prepare and submit daily records of the site activates
Good knowledge of reading piping drawing, isometrics and P& ID
Lead several piping erection team on site to erect piping and pipe support
Checking of piping works according to the execution procedure.
Preparation of time sheets, Production reports, welding & QC reports
Good knowledge of spool fabrication, erection, installation and hydro testing.
Upstream & Downstream Oil & Gas piping
Personnel details
Name : Gajre Vittal Kumar
Fathers Name : Marathi Gajre
Date of Birth : 04/11/1972
Nationality : Indian
Religion : Hindu
Marital Status : Married
Passport Detail : Passport : A8035767
Date of Issue : 29/07/2009
Date of Expiry : 28/07/2019
Place of Issue : Bangalore
Permanent Address : Hon. 12/3/1 Harurgeri Post. Gandhi Gunj Dist. Bidar- 585 401
Karnataka State India
Educational Qualification : Bachelor of mechanical engineering
Languages Known : English, Hindi, Kannada and Marathi
Examination
Institution
University
Year of Passing
% Secured
B.E. (Mech)
R.E.C. Bhalki
Gulbarga
1998-1999
1st class with 65.5%