Dec. 19, 2012 to TIC, (Leadman) Wilmington, NC

*/**/****

I took a complete set of drawings and cut sheets and installied a 35,000 a square foot warehouse. I installed 1,200 Amp MDP for mainservice, Stepdown tramsformer. 208- 120 low voltage panel. I planned and Lead four employees and completed the project in five months. Know I am terminating the gurtronics system( GF Is Arthur Smith his number is 910-***-****).

April 2012 to PCE (Leadman over Pipe Crew) Lake Providance, Louisiana

Dec. 16, 2012

Piped in all instrument devices, ran all pipe for all small runners and disconnect power, ran all from cable tray- communication cable tray.

Mar. 1, 2011 Southern Industrial (Foreman) Raleigh, NC

Feb. 18, 2012

Started out on pipe crew, Project Manager Jerry Johnson promoted me to Foreman over wire pulling crew. Pulled multi conductor cable for all instruments and low voltage control. Also pulled multi conductor cables for disconnect power and motors.

Dec. 2011 to CSI (Journeyman Electrician) Greensboro, NC

Mar. 2012

Load side management, ran all pipe for controls (three week shutdown).

Nov. 2011 to IES (Journeyman Electrician) St. Paul, VA

Nov. 30 2011

Terminate Controls on PLC Cabinets (one month shutdown).

March 2009 to M & R Electric (Foreman over 10 Employees) Shannon, NC

Oct. 2011

Read Blue prints, order materials, layout and plan work for employees, run all pipe, operate all equipment, use all binders. Install duct bank in this job.

Oct. 2007 to Crowder Const. Co. (Journeyman Electrician)

Jan. 2008 Industrial Power Plant

Run all duck bank work. Ran all size pipes from in to 4 in. Also helped pull wire and terminate all switch gear.

March 2007 to Ronniek (Georgia) Wire Pulling Leadsman

Sept. 2007 Industrial

Started out as a Journeyman running pipe and cable trays. Then was moved up to a Leadsman over a wire pulling crew. Ran a 20 man crew, pulled power distribution, drive cables, tec cable, and communication cable for all pic cabinets and all motors.

Jan. 2007 to Trade Source ( Charlotte, NC) Leadsman

Oct. 2006 Commercial

Run day to day operations with a 12 man crew. Ran all size pipe from in to 4 in, emt, ridged, imc, and pvc. Also can run all electric benders, chicargo benders, and hand benders. Have operators license to run machines. I can also terminate power distribution, wire up pixireanels and transformers.

Aug. 2006 to Davis Electric (Greenville, NC) Journeyman Electrician)

Sept. 2006 Industrial

Pipe runner . Was over wire pulling and six people under me. Pulled all power for PLC

Cabinets and all low voltage communication wire . CAT FIVE CABLE.

July. 2006 M &W Electric ( Red Spring, NC ) Foreman

Oct . 2002 Commercial

My first job with them was a CVS form the ground up . I did Locklear hall

At PSU University and few more job for them.

Have 10 hour OSAH Card

NCCER Card