Post Job Free

Resume

Sign in

Transmission Specialist

Location:
Semarang, Central Java, Indonesia
Posted:
September 11, 2016

Contact this candidate

Resume:

Address: Jl. Sidomukti VI/** Tlogosari, Semarang *0197, Indonesia

Contact: +62-881-******* or +62-857-********

Email: acwj4t@r.postjobfree.com or acwj4t@r.postjobfree.com

SUSILO

Marital status: Married

Nationality: Indonesian

Education:

Bachelor Degree

Institut Teknologi Sepuluh November (ITS) Surabaya, Indonesia (1992-1995)

Major: Electronics Engineering.

Final Project : A Microcontroller MC68HC11 Based Telephone Set Connected to PC via RS232 Port for Data Base Access Dialing.

GPA (IPK) : 3.32 (of 4)

Objective:

Seeking an opportunity to get a better employment, where I can develop my carrier, which results in high productivity and achievement.

CAREER SUMMARY

At least 12 years experiences in Telecommunication industry (mostly Ericsson)

Several years experiences in BSS implementation, integration, O&M and technical support professional.

Severel years experiences as overseas consultant (expatriat)

Experience in Manage Service/NOC (Ericsson, NSN)

experience in Midle to Senior Level position (Team Leader, Coorrdinator, Supervisor)

Employment History:

PT. ZTE Indonesia (April 12, 2015 - Jan 12, 2016)

Zona Manager for LTE Implementaion Surakarta Area

Assignment

To support Smartfren 4G LTE Project for Solo Area under RPM Central Java

to manage the project team (internal and subcontractor) to acheive daily target on the LTE Implemention (CME, eNodeB, IPRAN and Transport - FO/MW)

to setup plan, schedule, and material preparation base on target

to report to RPM on daily bases

PT. Huawei Services (December 1, 2014 - Apri 11,2015)

Transport/Transmission Senior Engineer

Assignment:

To support Project (Torpedo Project ) for XL operator

The activity is to perform Transport End to End troubleshooting, optimization of IuB Link to achieved the KPI

Equipment involved: NEC iPASO 400, Ericsson MiniLink TN, Huawei RTN, Huawei OSN

PT. Ericsson Indonesia (September 11, 2011 – September 30, 2014)

Last Assignment: Technical Team Leader for End to End IuB Transport Troubleshooting

Duties and Responsibilities:

To Lead a team to deliver the recommendation of troubleshooting result on the IuB transport problems (end to end) reported by RF Dept.

To perform End to End Transport/Transmission Performance analysis, optimize and to find the solution/root cause by area/cluster of site to maintain the KPI.

To manage the team to achieve the project target

To evaluate the project in the given responsible area and to report the result to Project Manager by daily/weekly report.

Project: XL Customer Experience Improvement/CEI (Liongates Project)

Previous assignment: As Senior Services Engineer Integration at Broadband Network

To successfully deliver the ITC of Optical equipment as scoped by project

To successfully deliver the upgrade and expanse of existing optical equipment.

Project: Axis Swap Jabotabek, Axis Sumatra Backbone Expansion

Equipment involve: Tellabs DXX6300 series (ADM), Marconi OMS1664 (PTN), SPO1400 series (PTN),

LM Ericsson AB Saudi Branch (Jan 9, 2010 – August 31, 2011)

as Transmission Specialist for STC project

Duties and Responsibilities:

To create, evaluate and troubleshoot the Circuit Work Order (CWO), end to end transport/transmission path, involving all transmission equiptments :

-Alctel-Lucent :1655 AMU, 1663 ADM-U, 1675 Lamda-Unit

-Huawei : Optix OSN 1500, OSN 2500, OSN 3500, OSN 9500, Metro 1000V3

-Siement HiT7030, HiT7070, SMA 4/1, SMA 1/4

-Tellabs DXX6325, 6340, 6345, 6350

-Ericsson Traffic Node (TN) R3

Project : 3G expansion phase 4, IP RAN trial, and 3G expansion phase 5 or Saudi Telecom Company (STC)

Nokia Siemens Networks Saudi Arabia (November 2009 – January 2010) As Transmission Engineer Support for Hajj 1430H

Duties and Responsibilities:

To support the Transmission Network monitoring and troubleshooting during Hajj 1430H (2009) in Mecca Area, rectify all fault within SLA requirement, to solve problems or escalated them to the correct group/team.

Network Element: . Siemens HIT7070, HIT7060 & HIT 7035, Siemens SDH (SRT1F, SRA4)

Customer: Zain Mobile

Nokia Siemens Networks Indonesia (December 2008 – May 2009)

As Transmission Network Planning, Performance and Optimization Engineer, Manage Service Dept.

Duties and Responsibilities:

Re-do the Microwave transmission planning PDH/SDH (access or backbone) for any problems (ie. Fading, interferences, obstacles, need link reroute)

To maintain the quality of transmission performance PDH/SDH (access or backbone) by frequently check NetViewer in NOC

To optimize the transmission capacity (Fiber Optic and MW capacity), Muxplan update (from TNMS/NOC) for all transmission type (Access, backbone), including IP back bone capacity.

In line with Roll out Planning Dept, to improve the transmission network quality.

Equipment to be handled : SRAL xD, SRA HC, SRA 4, SRT1F, Hit7000 series.

Customer : HCPT (Hutchinson CP Telecommunication)

LM Ericsson AB Saudi Branch (May 18, 2008 – November 30, 2008)

As Transmission System Engineer Team Leader

Duties and Responsibilities:

To prepare the team for Implementation, manage and coordinate them to conduct the test and commissioning of Tellabs DXX 63xxseries (ADM): 6325, 6340, 6345, 6350 and 86xx series (ATM): 8660 nodes

To manage and coordinate the team to perform some End to End testing of transmission site, Microwave (PDH) :MiniLink-E, Traffic Node, (SDH/STM1): High Capacity Microwave and DXX cross-connect. Including upgrade (3G)

Customer involved : Saudi Telecom (STC) 2G expansion and 3G phase 2 and 3 project

Ericsson (Malaysia) Sdn. Bhd. (July 15, 2007 – January 2008)

As Transmission ELS (Ericsson Local Support) Specialist

Duties and Responsibilities:

To support the transmission project to achieve the target, i.e.: Mini-Link HC & TN design and implementation (PDH and SDH/STM1), Mini-Link DCN/IP planning for Network Management System, DXX Server R15A operation: delete and recreate circuit on Basic Node (8150) for 2G/3G upgrades, MDRS 155 EC and OMS implementation (test and commissioning), SoM 8.0, ML-E, ML-TN and MDRS integration, MLM R.7.1, ML-HC, ML-TN, ML-E integration

To support the ELS (Ericsson Local Support) team on :MiniLink-E, HC, TN troubleshooting and upgrading,Tellabs DXX 8150 (Basic Nodes) and 6340, 6350 Nodes maintenance and troubleshooting, MLM R7.1 troubleshooting and upgrading, Mini-Link Networks Alarm monitoring and performance reporting, SoM R8.0 configuration and system integration

Customer involved: DiGi, Maxis, Celcom, MITV/U-Mobile

Ericsson Egypt Limited (January 2007 – July 2007)

As Transmission Support Consultant

Duties and Responsibilities:

To support the Vodafone roll-out project in Transmission area (MiniLink E, Traffic Node and TELLABS DXX 8150/basic nodes and 6340, 6345, 6350 nodes).

To support ELS on troubleshooting the problem in MiniLink-E, and MiniLink Traffic Node and Tellabs DXX nodes network.

Customer/Project Involved:

Vodafone ADM and MiniLink-Expansion 2007

PT. Ericsson Indonesia (June 2005 – December 2006)

As Senior ELS (Ericsson Local Support) Engineer (Transmission) at Network Support Services Dept.

Duties and Responsibilities:

To handle an Emergency Problem, CSR (Customer Service Request) and any related customer networks problem on RBS and Transmission (RBS2202, 2206, 2207, 2302, MiniLink-E, High Cap/HC, Traffic Node/TN and Tellabs DXX 81xx family and 63xx family, Marconi OMS1240, OMS1260, OMS 1654, OMS1664)

Customers/Projects Involved:

TSEL System Support - Telkomsel

OSA 2005 System Support - Indosat

XL System Support - Exelcomindo

ECP Ericsson Pakistan (November 2004 – May 2005)

As Core Network Transmission Engineer at Network Roll Out Project

Duties and Responsibilities:

Integration The Core transmission Network through Microwave Link: NERA (SDH), MiniLink-E, Traffic Node (PDH)

Installation and test commissioning Tellabs DXX8150 (basic node single or double, for time slot grooming over E1) and Tellabs DXX6310, 6320, 6340, 6345 (Optical SDH, E1 grooming over STM-1).

Installation and Setup MiniLink Manager Server, IMA6.1, for MiniLink-E (Medium Capacity) and MiniLink Traffic Node, DXX Manager Server R14, for NMS of DXX8100 family and DXX6300 family (DXX 6300 communication server)

Customers/Projects Involved:

Al Warid GSM Turnkey project.

LMN Ericsson Nigeria (April 2004 – September 2004)

As Operation and Maintenance Engineer at Ericsson Local Support Nigeria for MTEL GSM Operator

Duties and Responsibilities:

Responsible for O&M of BSS Network (RBS 2202, 2206, 2207 and MiniLink-E) daily alarm monitoring and performance

PT. Xerindo Teknologi (March 2003 – April 2004 )

As Project Member

Duties and Responsibilities:

Responsible for Successful Delivery of On-Going project (RBS/Transmission Implementation)

Manage a group of Project Teams to ensure the project is on schedule

Distribute the tasks and jobs to appropriate team to be done

Report the Project status and progress to Project Manager

PT. Motorola Indonesia (October 2002 - March 2003)

As Transmission Engineer for TINEM Telkomsel Project Jabotabek and West Java Area.

Duties and Responsibilities:

Responsible for successful delivery of Transmission Implementation (MiniLink-E) TINEM Project Jabotabek and West Java Area

PT. Ericsson Indonesia ( 12 May 1997 - 30 Sept 2002)

last position As ITC (Installation, test and commissioning) coordinator at Radio Network/Wireless Dept

Scope of works:

RBS 2202, 2206, 2207, 2302 and MiniLink-E Implementation Supervisor (Project IM3 Batam, Jabotabek, West Java area)

Tellabs 81xx family Digital Cross Connect (DXX) System Implementation (IM3 Project): DXX Basic 6c node, Basic 16/32 (DXX8150 single/double), Cluster Nodes (DXX8170) and A111 node (DXX8160).

Technical Course:

DRA1900 (WLL): July 1997, Ericsson Indonesia

RBS 2000 Basics: February 20, 2001, Ericsson Indonesia

Tower Climbing Safety : March 9-11, 2001, PT. PLN Bogor

GSM System Survey : February 14-16, 2001, Ericsson Indonesia

MiniLink-E; Commissioning & Filed Services: April 25-27, 2001, Ericsson Indonesia

RBS 2000 Operation & Maintenance : April 29 – May 02, 2002, Ericsson Indonesia

Mini-Link PTP; Network Management / NETMAN: May 14-16, 2002, Ericsson Indonesia

RBS 2206 Operation & Maintenance January 19-20, 2004, Ericsson Indonesia

BTS EVO Commissioning an Integration Course: Feb. 2004, Alcatel Indonesia

Mini-Link High Capacity; Operation and Maintenance : 22-24 Feb. 2006, Gothenburg-Sweden

Mini-Link Traffic Node; Operation and Maintenance: 28 Feb – 3 March 2006, Gothenburg-Sweden.

WCDMA Radio Functionality : 11 – 13 April 2006; Ericsson Knowledge Center, Jakarta, Indonesia

RXI 820 (ATM Cross Connect), Operation and Configuration: 19-21 April 2006, Dublin, Ireland.

EDA 1500 GPON 6.1, Implementation Course, 4 – 7 Oct 2011, Ericsson Indonesia

EDA 1500 GPON 6.1, Advance Course, 10 -13 Oct 2011, Ericsson Indonesia

Marconi DWDM, MHL3000 commissioning, 21 – 25 Nov 2011, Ericsson Indonesia

Smart packet Optical (SPO1400), Basic, Commissioning, Maintenance and Ethernet Advance, 25 Feb – 1 March 2012, Ericsson Indonesia

CCNA (Cisco Certified Network Associate), ICNDA1&2, 17 – 28 June 2013, Inixindo, Jakarta



Contact this candidate