Summary
Twelve plus years of comprehensive experience in Energy and Power. Solid technical and project engineering background including lead and senior positions in (CCPP) Combined Cycle Power Plants, LNG, Bio-fuels, Renewable Energy facilities, Mining Plants, and Oil & Gas Refinery Plants with primary focus in Mechanical and Piping Engineering. Knowledgeable in mechanical procedures, practices and standards. Engineering competencies during pre-FEED, FEED, detailed design and maintenance. Effective project leader and result focused specialist.
Experience
MITSUBISHI HITACHI POWER SYSTEMS AMERICAS
April 2015 – August 2016
Lake Mary, FL.
Job Title: Project Engineer/Senior Piping Engineer
Successfully managed 3 projects with estimated cost from $5 million to $55 million in value.
Restructured project execution schedule that resulted in prompt site delivery for EPC clients.
Expedited the purchase of piping material, equipment and auxiliary units by creating a more robust project technical specification cutting the process by 25%.
Collaborated on the creation of an insulation chart to be used in a (PMS) by the construction team to streamline the quantities and type of insulation for purchase in accordance with ASME B31.1, API & ANSI-Codes.
Provided technical support to our quality team with site action request (SAR), inspection test plans (ITP) and request for information (RFI) log files resulting in savings of $10,000 - $24,000 for damages and bulk reorders.
Interfaced with the change management process team by identifying scope changes that impact engineering and scheduling.
Coordinated engineering departments for 3D-model reviews and interferences that cut down on allocating man hours for rework.
Created guidelines for model clash detection and piping isometric check list to ensure quality and sustainability.
Created and issued master document list (MDL) for suppliers/vendors for internal reviews and quality assurance inspection compliance.
Experience
JACOBS ENGINEERING
November 2014 – January 2015
Denver, CO.
Job Title: Senior SP3D Piping Designer
SUNCORE Project – Senior SP3D Piping Designer
Responsible for onshore downstream design and layout of flare lines from main pipe rack and relief lines in refinery in accordance with ASME B31.3.
Layout and design of Hydrocarbon line from Crude Pre-Fractionator and Vacuum Gas Crude exchangers to and from main rack.
Responsible for P&ID & MTO markups with detailed finalization of tie in points for (Large bore & Small bore) flare and relief lines in accordance with ASME B31.4.
Routing and layout of (LNG) Liquid Natural Gas to refinery storage tanks and Kerosene vessels.
Preparation and checking of nozzle orientations.
Selection of pipe supports in preparation for stress analysis.
Issue of Isometrics (P&ID) Check, Line Routing, Support Check, Special requirement check etc.
ANAGOLD Project – Senior SP3D Piping Designer
Mining project responsibilities were to layout and arrange Pre-Leach, Leaching tanks and Copper Precipitation tanks (CIP) for gravity drain distribution.
Connect Launders from CIP’s for even flow distribution.
Route and design Sodium Hydroxide, Cyanide, Meta-bisulfite and Hydrosulfide tanks and pumps for connection to main rack.
Experience
CH2M HILL ENGINEERING
May 2012 – November 2014
Atlanta, GA
Job Title: Area Lead – SP3D Piping Engineer
INPEX ICHTHYS LNG Project - Area Lead Piping Engineer for the Steam Turbine and ACC Unit
Managed project value of $150 million for portion of responsibility.
Evaluated supporting documents for (3) Steam turbines and (3) ACC units and implemented adjustments in the basis of design (BOD) that constituted a savings of $120,000.
Provided technical layout arrangement of auxiliary equipment associated with GE-Steam Turbines to mitigate material waste and field adjustment cost in design and performance.
Ensured the project safety and environmental objectives were implemented in compliance with Human Factors Engineering guidelines for team members to adhere to.
Meet evolving schedule adjustments for piping isometrics packages and general arrangement packages through flexibility in managing team staffing.
lead team of designers in task force phase effort to expedite pipe support packages to manufacture in efforts to saving liquid damage charges from $50,000 - $100,000 for every day past delivery date.
Responsible for the coordination with engineering departments and client for 3D model reviews to resolve interferences and compliances with HFE requirements that ensured detailed access conditions, safety and sustainability.
Prepared pipe support load calculations.
Experience
AMEC ENGINEERING
July 2005 – May 2012
Tucker, GA
Job Title: PDMS Piping Designer
RAINER Project Recovery Boiler and Steam Turbine
Lead Pipe Designer responsible for vendor documents and equipment information.
PDMS pipe design, modeling, isometric extractions, CeaserII stress analysis files, pipe supports, equipment layout, plan and elevation drawing cuts.
Drawing and isometric packages for construction.
GE CHILCA UNA Project- 800MW Steam Turbine
Lead Piping Designer responsible for multidiscipline coordination, Structural Dept., Electrical, Instrumentation and Process Dept.
Vendor evaluation of supporting documents and regulations for pipe design/supports with supplier recommendations.
Responsible for CeaserII stress analysis files, 3D-PDMS equipment layout, pipe design and isometrics drawing extractions.
Materials take off report and support details with completed packages for construction.
GE OSEONG Project- 900MW Steam Turbine
Lead Piping Designer responsible for multidiscipline 3D-PDMS coordination.
Vendor supporting documents for pipe design and supports with supplier recommendations for piping systems.
Piping Bill of material for internal pipe support data sheet.
Responsible for CeaserII stress analysis files, PDMS equipment design/layout, pipe route and isometric extractions.
Material take off report and support details with completed packages for construction.
GE KALLPA Project 900MW Steam Turbine
Lead Piping Designer responsible for multidiscipline 3D-PDMS coordination.
Vendor supporting documents for pipe design and supports with supplier recommendations for piping systems.
Material take off report, support details and hydraulic compression fitting data sheets.
Alliant Energy Edgewater Project- SCR Renewable Energy
Pipe designer responsible for 3D-PDMS equipment design, piping design, isometrics extractions plan and elevation drawing extractions.
Responsible for the preparation of stress analysis packages and support drawings.
Professional Education
Dates of Attendance : 8/1/2000 To Present
Degree/Diploma Obtained
ARMY Leader ship and Development
PDMS-ASMODELER Certification
PDMS- Equipment modeling Certification
PDMS-Piping Design Certification
SMARTPLANT Pipe, Pipe Support and Equipment Certification
LASAGA piping support training
AUTO-CAD
PMP certificate of training 2/2016
Core Qualifications
Quality Assurance
Project Management Training
Documentation
Workflow Optimization
Team Leadership
Academic Education
Southern Polytechnic State University, Marietta, GA
Dates of Attendance : 8/21/2006 To 5/12/2012
B.S. Mechanical Engineering Technology
Specific concentration in Energy/Power and Project Management
Clayton State University, Morrow, GA
Dates of Attendance : 8/25/2004 To 5/20/2006
A.A.S. Drafting and Design