AJAY B.MADARIYA
E-Mail: ************@*****.**
Contact: 093********
SENIOR MANAGEMENT PROFESSIONAL
Operations & Maintenance ~ Project Management ~ Spare Parts Management ~ Quality Assurance & Control
A versatile, high-energetic professional with the distinction of executing prestigious projects of large magnitude within strict time schedule
Seeking challenging assignments in Operations & Maintenance / Project Management / Quality Assurance & Control with an organization of repute
KEYSKILLS:Mechanicalmaintenance,Safety,FerroAlloys,Fabrication,Erection,Commisioning,Negotiations,Team leader, ISODocumentation,Jigging,Sinter,Belt conveyors,Crushers,Screens,Cost control,Energy saving.
PROFILE SUMMARY
Bachelor of Engineering with over 28 years of experience in:
Operations & Maintenance Project Management Spare Parts Management
Quality Assurance & Control Plant Operations Contract Management
Gained extensive experience carrying out in Mechanical &Utility Maintenance, Ferro Alloys,5S, Cost reduction and Breakdown Analysis
Expertise in coordinating, planning and implementing changes to technology, machinery & equipment, process methodology, direction of quality assurance and control systems & reporting procedures
Proven track record of leading the organization to increase revenues and profitability, streamline workflow and create a team environment to increase productivity
A keen strategist with expertise in managing operations, quality, maintenance & commissioning with key focus for growth of top &bottom line profitability by ensuring optimal utilization of resources of business in various areas
Possesses excellent interpersonal, analytical and negotiation skills with proven track record of utilizing process-oriented approach towards the accomplishment of cost, profit, service & organizational goals
ORGANIZATIONAL EXPERIENCE
Since Oct’12 Vandana Global Ltd., Raipur (Integrated Steel Plant) as Deputy General Manager – Mechanical
Role:
Managing the mech. maintenance of:
oTwo nos. of 9MVA Submerged Electric Arc open Top Ferro Alloys Furnaces
oOne no. of 18 MVA furnace
oPumps, Belt Conveyors, Screens, Cooling Towers
oCrushers, Jigging Machines, Sinter Plant, Pig Casting Machines
Handling the different sectional mechanical in-charge of Furnaces, RMHS, Utility
Responsible for spare parts planning and ensuring the timely follow up of the same
Accountable for heading plant various modification and project work
Spearheading contractual activities and negotiating for outsourcing with the parties for various purchase of services needed for plant maintenance activities
Overseeing estimation, contractor finalization, equipment selection/inspection & execution and commissioning of project
Responsible for obtaining approval &providing successful implementation of various major modification jobs in furnaces resulting unexpected benefits in all aspect
Highlights:
Played a vital role in providing 2% reduction in breakdowns / downtime through effective maintenance
Successfully handled 2% escalation in OEE through effective maintenance
Adeptly increased the machine uptime / decrease in downtime
Holds the distinction of resolving major technical issues furnaces & bag filters
Sep’03 – Sep’12 Sarda Energy &Minerals Ltd., Raipur(CG)(Integrated Steel Plant) as AGM(Mechanical)
Role:
Managed mechanical maintenance of:
oFive Nos. of 9mva Submerged Electric Arc Open Top Ferro Alloys Furnaces
oPumps, Belt Conveyors &Screens
oCooling Towers
Handled Five nos. of Bag Filter Units, Metal Recovery Plant and Jigging Unit (Four Nos.) Maintenance
Worked on SAP &ERP
Coordinated with all the operators and maintained a safe &professional environment in the plant premises
Responsible for assigning shifts to the staff and arranged replacements if the assigned staff is on leave
Responsible for monitoring the implementation of quality controls & conduct periodic tests and ensured the maintenance of equipment
Developed capital proposal and managed the execution of project
Obtained approval for capital expenditure from top management
Served as Head of Mechanical Maintenance of fly ash brick plant
Headed plant maintenance of all machineries and improved the availability of all critical machineries
Conducted troubleshooting, failure analysis, 5S, ISO 9001:2008 documentations & record maintenance and continuous improvement
Carried out commissioning of new machineries and calibration of control equipment
Projects Handled:
Single Deck Screen Vibrating Feeder,Crushers, Belt Conveyors &Jigging Machines
Erection & commissioning of Three nos. of 9mva submerged electric arc furnaces
Erection & commissioning of One no 18mva submerged electric arc furnace,
Highlights:
Played a vital role in providing 2% reduction in breakdowns / downtime through effective maintenance
Successfully handled 2% escalation in OEE through effective maintenance
Adeptly increased the machine uptime / decrease in downtime
Holds the distinction of resolving major technical issues of furnaces, bag filters& RMHS
PREVIOUS EXPERIENCE
Sep’89 – Aug’03 Universal Ferro & Allied Chemicals Ltd.
Growth Path:
Sep’92 – Aug’03 In-charge -Mech. Maintenance - (Plant -2) (100%E.O.U)(Tumsar-M.S)
Two Nos of 16.5 Mva (Russian) Submerged Electric Arc Semi Closed Ferro Alloys Furnaces,2.5 MVA (1 No Open Russian Furnace), Cooling Tower, E.O.T. Cranes, Screens, Belt Conveyors, Pumps, etc.
Sep’ 89 – Aug’03 Senior Plant Engineer – Mechanical - (Plant-1) (Tumsar-M.S)
Two Nos of 9 Mva Electric Arc Semi Closed Ferro Alloys Furnaces (ELKEM) and related equipment viz. Scale Car, Skip Hoist, Telephers, etc.
Jul’87- Sep’89 Wainganga S.S.K. Ltd.,Tumsar-M.S. asAsst. Engineer
Equipment Handled: 1500 KW Triveni Make Turbo Alternator &High Pressure Water Tube Boilers Having Capacity of 20 Tons/Hr Steam Generation
EDUCATION
Bachelor of Production Engineering from Nagpur University in 1987
Diploma in Business Managementfrom Nagpur University in 1992
Diploma in Computerized Data ProcessingfromBombay Board in 1997