Post Job Free

Resume

Sign in

Engineer Electrical

Location:
Englewood, CO, 80112
Posted:
September 07, 2016

Contact this candidate

Resume:

Professional

Objective:

Experience

Summary:

Electrical/Control/Instrumentation Engineering.

I have more than 20 years of experience in Electrical, Controls and Instrumentation Systems. Working history with several Wastewater Treatment Plants, Pumping Stations, Power Plants, Oil &Gas, Solar Systems, Mining, Industry, Military, Airport, and Municipal Facilities. Hands on experience with the following:

System design for power generation facilities, low/medium and high voltage MCC, switchgear, switchyards/substations.

Power utility interconnections and power systems analysis performing short circuit, load flow and voltage regulation studies for facility distribution systems.

Specification and purchasing support for large transformers, switchgear, and other major electrical equipment

Lightning protection system design

Grounding system design

Familiar with SKM Analysis.

Experience with ETAP.

Calculations and design associated with generators and motors.

Layout of underground conduits and duct banks.

Layout and routing of cable tray and conduit systems.

Lighting distribution and fixture selection for indoor and outdoor lighting systems.

Experience with AUTO CAD and Microstation. Generating one lines, control schematics, power plans, HVAC, and lighting drawings.

Experience in low voltage/ commercial (Public service).

* Inspections of both completed plants and facilities under construction.

* Startup services for expanding and upgrading of facilities.

* Construction management for expanding and upgrading of facilities.

* Review submittal, specifications and project estimation.

* Checked, reviewed, signed, and stamped all drawings.

* Familiar with IEEE, NEC, NEMA, ASTM,UL, Standards.

Education:

B.S. Electrical Engineering, University of Colorado.

B.S. Aeronautical, U.S. Air Force College.

Registrations:

P.E. Professional Engineer Colorado.

FCC License. Commercial Pilot and ATP License.

E-mail: acwilw@r.postjobfree.com Phone: 720-***-****:

Project Experience

Merrick & Company – Electrical, Control and Instrumentation Engineer III.

(April 2015 to Sept 2015)

Cool Planet (Biofuels Project). Responsible for the design of electrical and control systems including 12.4kv, 480v one-line diagrams, VFDs, Soft starter, Breakers sizing, Control Schematics, 480V Switch gears/MCCs, 12.4 kv Switch box, 2000 kva Transformer, Electrical room design, Grounding and Electrical location plan drawings, Electrical load list, Panel design Short circuit/Load flow calculations with ETAP, Generating new electrical specification.

TVA Power plant Project. Responsible for Dust collector and Sump pumps control Schematics, Modifying one-line diagrams, Soft starter, Breakers sizing, Short circuit/Load flow calculations with ETAP, Electrical plan drawings.

Sinclair Refinery Project. Modified Electrical plan drawings, generated Electrical One-line from field sketch, Designed control schematics, Design bus duct system. (April 2015 to Sept 2015)

FEI Engineering – Senior Electrical, Control and Instrumentation Engineer. Responsible for the design of Electrical, Instrumentation and Control systems for Keenesburg park station, City of Durango, Town of Lyons, City of Boulder IBM Lift stations, Ault waste water treatment plan And Taos SCADA system. Designs included Power Distribution, One-line Diagrams (MCC&SWG), Load lists, Equipment Sizing ( XFMR, UPS, Power Cable ), Grounding Calculations, Short circuit calculations, Lighting Design, Raceway, P&IDs, Instrument data sheets, Instrument indexes, Control schematics, Allen Bradley hardware (August 2014 to Feb 2015)

Direxa Engineering.- Electrical Engineer (Mining).

NLMK Mining Project (in Russia)

Responsible for the design of the Electrical and control systems for the projects included 6/0.4kv One-line diagrams, VFDs, Soft starter, breakers and Control schematics, cable sizing. Designed 400V switch gears/ MCCs, 6/0.4kv transformers sizing, Short circuit calculations, Power Analysis with ETAP. Generated project’s P&IDs from process schematics, generated Load list, Equipment list (Feb 2014 to August 2014)

Samuel Engineering.- Senior Electrical Engineer (Lead Engineer) Oil&Gas.

Cherokee Gas Project (Excel Metering station), Anadarko Header Project, Whiting Petroleum Corp. 3000HP Compressors Station (Robinson Lake expansion)

Responsible for the design of the electrical and control systems for the projects included 24.9/4.16kv, 480v One-line diagrams, VFDs, 4000 HP Soft starter, breakers and Control schematics. Worked on 4.16kv, 480V switch gears/ MCCs, 24.9/4.16 kv transformers, panel design and Short circuit calculations, Power Analysis with ETAP. Worked on P&IDs, instruments index, I/O list, Instrumentation sit safety plan control and instrumentation, Experience with solar electrical systems components including, photovoltaic modules, tracking systems, inverters, balance of System (AC and DC), transformers, switchgear and supervisory control and data acquisition systems (SCADA).

Detailed system and component design and modeling. Develop structural and electrical design drawings for commercial solar electric systems (June 2013 to Jan 2014)

TetraTech Engineering– Electrical, Control and Instrumentation Engineer V (Project Engineer 2) (Aug 2010 to Nov 2012)

Aurora Gold Project (Guyana). Responsible for the design of the electrical and control systems for a 20MW Power plant which included five Caterpillar diesel engine generators, switchgear, substations, MCCs and one-Line diagrams for feasibility study.

G.E Oil & Gas Treatment & Disposal Project (P.W). Responsible for the design of the electrical and control system which included the design of the following; MCCs, one-line diagrams, control panels, grounding, lighting plan drawings and 400 hp VFDs, generators, ATS, sizing power cables and transformers, GE PLC, INST/CONT Panel Design, I/O List (Class 1, Div 1 & 2).

CH2MHILL Assignment.(Climax Mining Project) Responsible for the checking and modification of the high /medium and low voltage power systems such as 115kv substation transformers, one-line, three-line diagrams, electrical facility drawings, 115kv breakers, SEL-387A, SEL-587Z, SEL-751, SEL-551 relays, MCCs, switchgear, VFDs, soft starters, generators, ATS, grounding, lighting, tray system, P&IDs (specification checking included).

Bigrams Air Force Base WTP,US Army Base Corp of Engineers Project,(Afghanistan) Electrical/Instrumentation Engineer. Responsible for the, medium and low voltage electrical(substation) and instrumentation system design which included MCCs, switchgear, substation transformers, one-line diagram, P&ID, grounding, lighting, plan drawings, and stand by generator design. In addition, specification, and load analysis.

McArthur River WTP, Electrical Engineer. Responsible for the design of the electrical systems for the project. Design included the following: 13.8KV, 4160V, 460V power distribution, one-line diagrams for 750 HP VFDs, 700 HP soft starter diagram, switchgear, and MCC elevations.

Stringfellow site telemetry & Scada system Project. Upgrading PLC to Compact Logix, added Panel View to Zone 3, Upgraded P&ID drawings to telemetry system, and upgraded the instrumentation. For example: level and flow transmitters, generated schematics and loop diagrams for the project.

New Melones Project. Generated Electrical Site Plan, Control Wiring Details, Building Power Plans, Control Schematics Drawings and Design of the Solar System (solar array, DC/AC Inverter, Metering) for the project.

Metro Wastewater Reclamation District – Electrical, Control and Instrumentation Engineer IV (Project Manager). Responsible for the design of Electrical and Control systems for Disinfection System, Digester holding tanks, Sludge processing building, Compost system, Aeration blowers, Switch gear, VFDs, MCCs, DCS, Grounding, Lighting, Sizing Power Cable, etc. More project work included, Field inspection, Field engineering, Coordinating work with Maintenance and Contractors, checking Contractors electrical design, submittals and responsible for Substation upgrades,(November 2006 to February 2010)

Integra Engineering – Senior Electrical, Control and Instrumentation Engineer (Lead & PM Engineer). Responsible for the design of Electrical, Instrumentation and Control systems for Colorado Springs Utilities, Northglenn Waste Water Treatment, Hess 1,2 pumping stations, Highway 83 pumping station. Designs included Power Distribution, Substations, One-line Diagrams (MCC&SWG), Load lists, Equipment Sizing ( XFMR, UPS, Power Cable ), Grounding Calculations, Short circuit calculations, Power Analysis (ETAP), Lighting Design, Raceway and Manhole Design, P&IDs, Instrument data sheets, Instrument indexes, Control schematics, Allen Bradley hardware, and Substation design, (Aug 2002 to November 2006)

Stone & Webster – Senior Electrical Engineer. (Apex & Mint Farm Power Plant Projects) Experience on High, Medium and low (115kv, 25kv, 13.8kv, 4.16kv) Power Distribution: Worked on One- lines (SWYs, SWGs, MCCs), Sizing XFMR. Grounding Calculations, Sizing UPS, Design of Load lists, Sizing Power Cables,Voltage Drop Calculations, Electrical Distribution Analysis (ETAP), Designing (Captor tcc) for SR-750,745,469. In addition, worked on Relay Setting and DSII Breakers. Worked on Wiring Diagrams & Routing. (Aug 2001 to Aug 2002)

Washington Group (Raytheon) – Senior Electrical/Control Engineer. Experience on Power Distribution Design and Substation (SWGs, MCCs, XFMR). Electrical Distribution Analysis (Captor & Dapper), Design of Electrical and Control Schematics for different facilities. Generation of One line & Detail Drawings, using AutoCAD 2000. Deep and Overhead Grounding and Lighting Design. Generated & reviewed Specifications. Completed Heat Trace for Project.(April 2000 to Aug 2001)

Montgomery Watson - Electrical, Control Engineer. Worked on WASTEWATER TREATMENT PLANTS. Design of polymer & Main control panels, Grit bin conveyor, Sludge Pumps, DCS & CRT stations, mixers, hydraulic pumps. Responsible for Electrical, Instrumentation and Control system Design for Industrial and Manufacturing and Wastewater Treatment systems. Experience in detail drawings, P&IDs, one lines using Micro Station and AutoCAD. Review and preparation of control schematics drawings and specifications, programming PLC (Allen-Bradley PLC-5 and SLC-500). Experience on Denver International Airport (Y2K Software Application Projects). Experience on power distribution & control systems, MCCs, lighting design and checked instrumentation location drawings. (September 1995 to April 2000)

Public Service (Utility Company Solar System) - Electrical, Control Engineer.

Experience with solar electrical systems components including, photovoltaic modules, tracking systems, inverters, balance of System (AC and DC), transformers, switchgear and supervisory control and data acquisition systems (SCADA).

Detailed system and component design and modeling. Develop structural and electrical design drawings for commercial solar electric systems

References available upon request.



Contact this candidate