Gustavo Salinas
*** ******** ** **** ******, Az *122
520-***-**** ***********@*****.***
Professional Summary
To obtain a long-term position utilizing the electrical and mechanical maintenance knowledge I have attained throughout my career and experience. Team collaborator effectively working with management to create schedules, establish deadlines and adjust manpower to keep production flowing smoothly and efficiently with minimal non-conformance.
Skills
Safety Equipment Production Scheduling
Plant Operations Support Time Management
Quality Control Issue Analysis
Mechanical Knowledge Project Support
Cost Control Written/Verbal Communication
Critical Thinking Extensive Organizational Skills
Team Training
Work History
Gourmet Boutique 10/2015
Calibrate/adjust equipment to ensure quality production utilizing calipers, micrometers, height gauges, protractors and ring gauges.
Provide skilled support within the manufacturing environment.
Monitor gauges, dials and various indicators to ensure machines are working properly.
Perform complex mechanical alignments and calibration of equipment to quality standards.
Facilitate equipment applying water, electrical power and leveling during installation processes.
Set up and perform test activities.
Remain consistently compliant with 5S standards
Sound Packaging 04/2013-10/2015
Maintenance Technician
Performed repairs on all of the corrugated equipment such as,Martin die cutter,Langston die cutter,Emba, and Hycorr die cutter,J&L gluer,Mosca banding units,bailer.
Made mechanical and electrical repairs to all the equipment above replaced faulty parts
Pm'd equipment when as needed and kept a log of all daily repairs and reported any issues to the maintenance supervisor along with the production manager.
Worked with 3 phase motors 480v AC/Dc Pneumatics
Maintained the building, fabricated frames, steps and many other things out of raw metal for new equipment etc.
Micro Plastics 07/2011-09/2012
Production Tech / Mold set up Tech
Performed repairs on Engel rotary presses and Fanuc robotic equipment
Performed set up and changeovers on injection equipment and PLC's as required per each part
Performed all repairs on equipment during production to ensure that parts were made to QA specifications and corrected any problems that would occurr, also kept a log of all repairs done throughout the shift and comunicated any on going issues with the oncomming tech and supervisors.
Full knowledge of all measuring equipment,tools,and guages
Supervised my production team on the weekends to complete production and made sure
that orders were made to all QA specs. and reported to the management about any issues.
Berry Plastics 03/2008 -02/2010
Maintenance Mechanic
Performed maintenance on CMD extrusion equipment
Performed all repair and installation according to wiring and blue print specifications
Performed setups and changeovers of injection molding and extrusion equipment as required
Performed mechanical and electrical maintenance and troubleshooting
Performed all repairs on conveyors, packaging equipment, tappers, extruders, winders and hydraulic systems
Full knowledge of all measuring equipment, tools, and gauges
Performed preventative maintenance on equipment
Troubleshot Allen Bradley PLC’s as needed
Worked with 3-Phase motor, 480v, AC/DC and pneumatics
Menards Distribution Center 02/2006 -02/2007
Maintenance Mechanic
Performed all repairs on conveyors, sorters, bailers, gear boxes, and hydraulic systems
Performed electrical and mechanical troubleshooting, repair, and installation
Full knowledge of all measuring equipment, tools, and gauges
Worked with 3-Phase motor, AC/DC, pneumatics and 480v
Performed various building maintenance duties as required
Imperial Mold Corporation 08/1997 – 11/2005
Maintenance Mechanic
Performed repairs on various injection molding equipment including: Cincinnati’s and Husky’s
Performed setups and changeovers of injection molding equipment as required.
Performed all repairs on conveyor and hydraulic systems
Performed mechanical and electrical maintenance and troubleshooting
Worked with 3-Phase motor, pneumatics, 480v and AC/DC
Full knowledge of all measuring equipment, tools, and gauges
Education
Pleasanton High school 1993
Lincoln Tech Ins. 1995