Post Job Free

Resume

Sign in

Engineer Maintenance

Location:
Lexington, KY
Posted:
September 06, 2016

Contact this candidate

Resume:

EDUARDO FERNANDES FIALHO CANTARELLI

Brzilian, ** yrs old, married (one daughter)

Add.: 840 Hays BLVD #3305, Lexington, Ky, USA, zip code: 40509.

PH#: 859-***-****.

E-mail: acwhzy@r.postjobfree.com

RESUME

Now live in Lexington-Ky. Engineer worked at Shipyard industry on Naval production of welded structure, machine maintenance, planning and control of team production. Graduated on Production Engineering, and post graduated on Specialization of Welding Engineer. Experience working on assembly, commission, startup operations, and maintenance of cranes or machines in general, and production of welded metal structures at shipyard Estaleiro Atlantico Sul, and Estaleiro Rio Grande (Ecovix Ocean Constructions). Responsible for coordinating manpower to assemble two Goliath Gantry Cranes (1500 ton each) with korean makers, also two shipyard size Painelines with makers from U.S.A and Germany, four hydraulic Presses with makers from Netherland, one Ship Plate Bending Machine with makers from Germany, assembly of Jib Cranes with makers from China, and Tower Crane maintenance. Fluent communication in english having lived four years in the United States of America.

GRADUATION

Graduated on Production Engineering at college FBV – Register number CREA: 180752357-8.

Post-graduated: Specialization of Welding Engineering.

Specialization on Management and Quality Control.

Attending: Engineering Tecnology Industrial

PROFESSIONAL EXPERIENCES

SHIPYARD: RIO GRANDE (ECOVIX OCEAN CONSTRUCTION)

LAST WORKING POSITION: PAINELINE PRODUCTION COORDINATOR AND DEVELOPMENT OF PRODUCTION PROCESSES.

PERIOD: May 13th of 2013 until 2015.

SHIPYARD: ESTALEIRO ATLANTICO SUL

MAINTENANCE ENGINEER OF GOLIATH GANTRY CRANES, CRAWLER CRANES, JIB CRANES, AND TOWER CRANES.

PERÍODO: July of 2009 until May of 2013.

DEVELOPED ACTIVITIES

1)Paineline Coordinator at Shipyard Rio Grande I e II

Coordinating production team for painel production in series;

Steel plate painel and profiles preparation;

2)Process Development and Control Coordinator

Control of production teams and machines for production of ship steel blocks in series (cutting of profiles with automatic machine from HGG, and steel plate cutting machines from Messer, Painelines from IMG and Ogden and block Load Out Station).

Trainement for production teams;

Development of operation procedures and documentation;

3)Field Coordinator on construction of Two shipyard Painelines, two Block Lines with eight Welding Gantries, and four hydraulic Load Out Stations.

Communication and factory responsibilities with machine forein supplyer manpower;

Coordination of manpower assembly, commission and production of civil, mechanic and electric parts of production lines for steel painels and ship blocks construction;

Coordination of team trainning, regulations and production dynamization;

Works related to regulation of painel Turnover Station, and welding machines;

Alignment and assembly of Load Out Station system;

Instalation, positioning, topography and assembly of the equipments.

4)Field Engineer on assembly of Two Goliath Gantry Cranes and maintenance.

Management of forein teams and local brazilian teams for the assembly of two 1500 ton Goliath Gantry Cranes;

Works focused on structural welding, mechanic equipments, electric, heavy load rigging transportations, paintting Jobs and commissioning handeling for complete operation;

Maintenance in general maintainning the gantry cranes preservation of engines, electrical equipments, safety devices, structural reenforcements, plannings for maintenance operations, and gereral inspections;

Quality control coordenation during structural assembly period, such as ultrassonic tests, x-ray, magnetic particle test, and dimeinsional check;

Purchasing and equipment import for better performance of equipments;

5)Ship Plate Bending machine accompany work with german makers.

Team work connections between german makers and brazilian manpower for machine assembly;

Providing of tools for the job and logistic of assembly with lifting equipments;

Correction of non conformities during assembly;

Quality aproval and work evaluation of services;

6)Hydraulic press of 500 ton.

Works of alignment, leveling, assembly, and programming with the supplyer from Netherlands;

Base grouting;

Tork of bolts;

Test and commissioning;

7)Work as Engineer responsible for maintenance of crawler cranes, Jib Cranes, tower cranes, Slab Cranes, and overhead cranes.

Prevent and correctional maintenance;

Safety item verification;

Mechanic, electric, and programming team leadership;

Purchasing and equipment Exchange;

Load test for equipment certification;

ATTENDED COURSES

Inspector of dimensional assembly of machiness – 156 hours (Zepto; PE) 08/12 a 10/12.

Work on hights - NR 18;

Confined space work - NR 33;

ADDITIONAL INFORMATIONS

1)language

FLUENT ENGLISH Reading, writing, and comprehension;

Four years living in the United States of America;

Portuguese as natural language, and good Spanish comprehension;

Works on civil construction.

2)Computer

Msproject

Word, Excel, Power Point:

Windows, internet:

SAP R/3 Produção:

3)Hobby

Cars, movies, electronic games, playing guitar;

Reading News paper, magazines, and books;

Family trips and fun;

4)Professional references:

Wolney Teixeira (Production manager of ECOVIX) – phone (53) 99515760.

Domingos Edral (Superintendent Director of ECOVIX) - phone: (53) 99540422.



Contact this candidate