Post Job Free
Sign in

Power Plant Engineering

Location:
Satna, MP, 485001, India
Salary:
300000
Posted:
September 05, 2016

Contact this candidate

Resume:

V.V.RAMA RAO

Contact: +91-879*******, +91-991******* E-Mail: ***********@*****.***

In quest of SENIOR LEVEL ASSIGNMENTS in PLANT OPERATIONS & MAINTENANCE with growth oriented organization of high repute preferably as VICE PRESIDENT- CPP

PROFILE SNAPSHOT

EMPLOYMENT DETAILS

Responsibilities:

Spearheading overall plant operations and maintenance activities of 1x27MW Power Plant

Responsibilities:

Handled tender evaluation and technical discussion with bidders

Reviewed engineering documents

Monitored release of tender documents for civil construction, erection & commissioning, port clearance, road transport agency and so as preparation of comparative statements

Administered the site execution works

PREVIOUS EXPERIENCE

Highlights:

Handled Project Erection Captive power plant of 2x27MW

Highlights:

Handled overall operations of units of 27MW each, CTPP at Kadapa Unit, A.P. and Ariyalur Unit, Tamil Nadu

Successfully done activities related to:

oCirculation Fluidized Bed Combustion Coal fired Boiler of IJT Make(120TPH)

oSeimens make 27MW Fully condensed TG set

oAir cooled condenser of GEA supply

o150TPH Coal handling system

Highlights:

Monitored 1x43 MW Cogen Plant at Ratnagiri, Maharastra which was executed on EPC basis by Cethar Vessels Ltd, Trichirapalli with a target completion of 15 months

Liaised with EPC contractor Cethar Vessels Ltd, Trichirapalli and conducted Engineering review consultant Fichtener Consultants, Mumbai for Execution of EPC Contract

Managed supply of TG set & auxiliaries for Bharat Heavy Electricals, Hyderabad alone

Highlights:

Successfully handled 30 MW Captive Thermal Power Plant consisting of Thyssen Krupp make CFBC Boiler, BHEL make TG set and other packages

Maintained mechanical maintenance of power plant

Modified Coal and Ash plants for plant stabilization in order to reduce environmental problems

Highlights:

Planned and executed Coal based Captive Power Project (CPP) at Aditya Cement,Chittorgarh and thereafter ran it as Profit Center

Dexterously evaluated:

oEngineering Consultant including coordination for Basic Engineering and Owners Engineering services

oEPC or multiple Suppliers including selection of Equipment, Technology, etc.

Obtained Regulatory & Statutory approvals/MOEF/Pollution Control Board/ CEA /Electricity Board and other such Institutions including State Govt.

Efficiently implemented PM module SAP R/3, version 4.0B

Played a stellar role in Engineering, Procurement, erection & commissioning of 3nos AFBC boilers (capacity of 2X95 TPH & 1X105 TPH) of M/s BHEL make, 1x18.5 & 23 MW Steam TG sets of BHEL make and 20 MW of m/s SKODA make and related plants like Water systems, Coal and Ash handling plants, AC & Ventilation system, etc.

Highlights:

Erected and commissioned 20 TPH Nestler’s make 3 nos. of oil fired boilers and utilities

Highlights:

Erected & commissioned 20 TPH Thermax’ make 1 no. oil fired boiler and Utilities

Highlights:

Administered shift operations for 15 MW thermal power plant having B&W make 2nos stoker fired Boilers, 1 no. spreader type IJT make boiler and BHEL make 1X10MW & 1X5MW Turbines

PERSONAL SNIPPETS

Date of Birth: 28th May, 1960

Address: KJS Cement, Maihar, Satna District,-485771, Madhya Pradesh

Languages Known: Telugu, Hindi and English

Location Preference: NA



Contact this candidate