Post Job Free
Sign in

Manager Six Sigma

Location:
Chicago, IL
Posted:
September 06, 2016

Contact this candidate

Resume:

SAUGATO PAUL

**** ****** ******* ****, *********, TX-77479

346-***-****

*********@*****.***

EDUCATION, CERTIFICATIONS AND SIGNIFICANT TRAINING

M.S., Quantitative Financial Economics, 12/2006

Oklahoma State University, Stillwater, OK

M.S., Industrial Engineering and Management, Supply Chain Emphasis, 05/2003

Oklahoma State University, Stillwater, OK

B.S., Production Engineering, 06/1996

University of Pune, India

Certified Six Sigma Black Belt, ASQ, 2006

Trained in Lean by Rick Harris, PIMS

Six Sigma Black Belt trained, Cameron International, 2005

Certified Six Sigma Green Belt, Cameron International

Certified CPIM, APICS

Lean Manufacturing trained, Schneider Electric, Cameron and Tyco International

PROFESSIONAL EXPERIENCE

PENTAIR(former Tyco) VALVES & CONTROL RENO FACILITY, a division of Pentair Ltd.

A designer and largest manufacturer of Knife Gate and slurry valves

3950 Greenbriar, Stafford, Texas 77477

Plant Manager 06/2015-Present

Responsible for P&L of $150M business, with focus on SQDCC

Zero incidents for 300+ days with a culture of daily near miss report out

30% decrease in DPPM by recording NCR’s at point of occurrence and empowering employees to be part of 5 why and countermeasure thinking

Improved Profitability by $1.5M in a tough economic climate

Reduced inventory by $4M (YTD) with enhanced PFEP program and stranger inventory substitution process

Introduced new Planning Gemba and master scheduling for Project orders- every day every day

Revamped Talent with 9 blocker talent management

Project Value Stream Manager/Regional Lean Manager E2E 01/2014– 06/2015

Responsible for Projects P&L and Value stream which starts at Quotations to shipping and documentation

Reduced Past due backlog from $11.5M to less than $1M by end of 2014

Improved On time delivery of Projects from 37% to 92% by end of 2014

Led transformation plan event and developed A3 planning for projects and visual milestone board

Talent management and revamped more than 75% of the team

Developed Quotation checklist with pitfall clauses for Contract review along with standard work

Weekly Gemba with emphasis on Managing daily improvements

Responsible for multi-site Lean implementation of Front End

PENTAIR(former Tyco) VALVES & CONTROL RENO FACILITY, a division of Pentair Ltd.

A designer and largest manufacturer of Knife Gate and slurry valves

9025 Moya Blvd. Reno, Nevada

Lean Manager 12/2012 –12/2013

Responsible for implementing “true Lean” by Creating Continuous Flow (Takt, Standard work and 5S) and making Materials Flow (PFEP, EPEI, WIP and SM sizing, Tugger routes)

Link Strategy Deployment targets to transformation Plan and A3 thinking

Coach Managers on Process improvements and do RCCM’s

Build Lean Culture by coaching, implementing Leader Standard work, layered audits and A3 thinking

Manage A3’s and facilitate Monthly Kaizen’s in shop and office

PENTAIR(former Tyco) VALVES & CONTROL RENO FACILITY, a division of Pentair Ltd.

A designer and largest manufacturer of Knife Gate and slurry valves 06/2010 – 12/2012

9025 Moya Blvd. Reno, Nevada

Manufacturing Manager

Manage P&L of $70M and led a team of 90 employees including shop, materials and project department

Led the team to ship record month $10M! and best quarter ever

Refocus on 5S, MDI, Gemba Walk, Create continuous flow, standard work and Materials Flow

Customer Request to Performance to a new high of 95%

TYCO FLOW CONTROL RENO FACILITY, a division of Tyco International Corporation

A designer and largest manufacturer of Knife Gate and slurry valves

9025 Moya Blvd. Reno, Nevada

Materials Manager 04/2008- 06/2010

Reduced Days On Hand from 84 to 42 in 5 months

Improved Customer Request to performance from 35% to 90% improving book and bill in the same month by $500K average

Recognized $2.6M sourcing savings versus goal of $1.5M

Reduced lead time and cost on standard valves from 12-8 weeks to 4-2weeks

Reduced delivery matrix from 8 weeks to 2 weeks for the standard MRO business

Implemented “Quick draw” 3 day quick draw program

Implemented Level loading for shop and assembly reducing overtime by using rough cut capacity planning

Introduced Visual Red Folder process to deliver per customer request dates on agreed quoted lead times

Reduced repetitive non conformances at Low Cost Country suppliers by 60%:

Operation Excellence- Six Sigma Lean Manager 01/2007- 04/2008

Exceeded $1M in GOI and $300K Cash for Year 2008

Saved in excess of goal for Year 2007: $482K GOI and $320 Cash

Led transactional Lean initiative to improve various transactional process efficiency

Reduced Overtime in excess of 80% with Lean Manufacturing Cells and freed up capacity to bring back work from Vendors to in-house

Implemented 5S program shop wide at the Reno facility. 5 teams graduated to level 5

CAMERON, a division of Cameron International, Moore, OK 08/2003 – 12/2006

A designer and manufacturer of industrial ball gate valves.

2101 S Broadway, Moore, Oklahoma 73160

Six Sigma Business Leader (08/2005- 12/2006)

Pioneered Lean Six Sigma Program at AOP Industries

oMentored 9 Green Belts; More than 40 hours of teaching experience

oExceeded expectations in Six Sigma savings by 15% and closes 6 six sigma projects

Reduced in excess of 2 million dollars of inventory and improved the Turns from 1.6 to 3

Manufacturing Management Training Program (08/2003-08/2005)

Six monthly rotations in Manufacturing engineering, Quality, Materials

oImplemented Dock to Stock, Vendor Score Cards on Quality and Delivery

oDeveloped Capacity Planning Module in SAP

Six months as Distribution centre supervisor

o Improved OnTimeDelivery from 57% to 94% with 8 turns

SCHNEIDER ELECTRIC LTD, India 05/1996-05/2001

58 MIDC Satpur, Nashik, India

Manufacturing Manager (08/2000-05/2001)

Led a team of 80 professionals in a union shop

Improved throughput by 8% and reduced test bed rejection by 21% through Kaizens

Negotiated a 30% increase in production norms

Cell Manager(05/1998-05/2000)

Implemented Single piece flow and kanban through Kaizens

Successfully implemented Vendor Managed Inventory Programs

Graduate Trainee (05/1996-05/1998)

Production Supervisor for manufacturing shop : Brazing, Silver plating, Molding, Press Shop

COMPUTER SKILLS

MS (Word, Excel, PowerPoint), Minitab, SAP, AVANTE



Contact this candidate