EXPERIENCE
OVERALL 9 YEARS OF EXPERIENCE IN OIL AND GAS PROJECTS AS PIPING CONSTRUCTION ENGINEER IN GCC COUNTRIES
WORK IN DETAILS
COMPANY: EASTERN ENGINRING KSA
POSITION: PROJECT ENGINEER
1)FROM 2014 JULY TO TILL DATE
PROJECT: SADARA POLYPROPYLENE OXIDE PLANT
CLIENT : TEKFEN E&C, SINOPEC E&C
POSITION: PROJECT ENGINEER
Field inspection of all works carried out to ensure full compliance with engineering drawings, specifications and project contract documents.
Attend daily tool box meeting and clear if there is any administration related issues
Proper monitoring of all fabrication progress and material requirement.
Updating material reports as per requirements.
Preparing material requests as per site requirement and verify with specifications
Preparing daily and weekly reports to site manager
Preparing material take off as per drawing for piping and equipments
Site verification of work and preparing invoice and other necessary reports
Coordinate with client to get work front and verify as per specifications
Perform similar other related duties as and when assigned by the site manager.
Advance material request as per site conditions
Preparing schedule as pe4r work front
Maintain work status and release status as per site condition.
Monitoring site progress as per site condition
Coordinate with client to get clear all contractual issues and reporting to site manager
Reviewing all quality control documents and verify site work as per procedure.
COMPANY: XERVON LLC, ABUDHABI, UAE
POSITION: project ENGINEER
PROJECT: RUWAIS REFINARY EXPANSION PROJECT
CLIENT : GS ENGINEERING AND CONSTRUCTION
JOB RESPONSIBILITIES IN PROJECT:
Field inspection of all works carried out to ensure full compliance with engineering drawings, specifications and project contract documents.
Assign work to subordinate to make all departments to get engaged with work.
Attend all tool box meeting and deliver all management and administration messages to the employees
Monitor all safety activities and advice the concerned safety officer if necessary
Get work front from client and sent arrange manpower and materials as per site requirements
Request for tools and other necessary consumables as per project requirement
Verify scope with site condition to create additional work
Preparing monthly invoicing and get it approved from client
Attending all meetings with client to get clear information about work front
Inspect work condition to ensure that mechanical work quality is always maintained with no negative effect.
Preparing Material take off, preparing method of statement, MAR and get it approved.
Verify construction quality control measures and witness major work steps.
Check that materials delivered to site are properly maintained and Provide assistance in setting out works.
Preparing site queries and technical queries in case of any variation from specifications
Review of all planning and estimation as per requirement
Make mobilization and demobilization of necessary equipments and make calibration and inspections as per requirements.
Prepare daily logs and reports. Maintain records of inspections made, tests performed, work executed, etc.
Prepare punch lists. Monitor the startup, testing, commissioning and handover of the works.
Perform similar other related duties as and when assigned by the project manager.
COMPANY: S AL-HAJRI CORPORATION, AL-KHOBAR, KSA
POSITION: MECHANICAL ENGINEER
1. PROJECT: NCP PROJECT
CONTRACTOR: JGC ARABIA LTD
CLIENT: NATIONAL CHEVERON PHILIPS
2. PROJECT : SATROP
CONTRACTOR: DAELIM
CLIENT: JACOBS
JOB RESPONSIBILITIES IN PROJECT:
Field inspection of all works carried out to ensure full compliance with engineering drawings, specifications and project contract documents.
Inspect work condition to ensure that mechanical work quality is always maintained with no negative effect.
Ensure company regulation with regard to work safety and environment preservation is always maintained. Check work preparation and ensure work is governed by method statements and work procedures.
Verify construction quality control measures and witness major work steps.
Check that materials delivered to site are properly maintained and Provide assistance in setting out works.
Prepare daily logs and reports. Maintain records of inspections made, tests performed, work executed, etc.
Prepare punch lists. Monitor the startup, testing, commissioning and handover of the works.
Perform similar other related duties as and when assigned by the project manager.
2) From December 2008 to till April 2009
ORGANIZATION: GULF HOUSE OF TRADE (GHOT), Doha, QATAR.
POSITION: SITE ENGINEER
JOB RESPONSIBILITIES IN PROJECT:
Field inspection of all works carried out to ensure full compliance with engineering drawings, specifications and project contract documents.
Inspect work condition to ensure that mechanical work quality is always maintained with no negative effect.
Ensure company regulation with regard to work safety and environment preservation is always maintained. Check work preparation and ensure work is governed by method statements and work procedures.
Verify construction quality control measures and witness major work steps.
Check that materials delivered to site are properly maintained and Provide assistance in setting out works.
Prepare daily logs and reports. Maintain records of inspections made, tests performed, work executed, etc.
Prepare punch lists. Monitor the startup, testing, commissioning and handover of the works.
Perform similar other related duties as and when assigned by the project manager.
3) From June 2007 to January 2010 in Power India ltd as Mechanical engineer
Job Responsibilities:
Field inspection of all works carried out to ensure full compliance with engineering drawings, specifications and project contract documents.
Inspect work condition to ensure that mechanical work quality is always maintained with no negative effect.
Ensure company regulation with regard to work safety and environment preservation is always maintained. Check work preparation and ensure work is governed by method statements and work procedures.
Verify construction quality control measures and witness major work steps.
Check that materials delivered to site are properly maintained and Provide assistance in setting out works.
Prepare daily logs and reports. Maintain records of inspections made, tests performed, work executed, etc.
Prepare punch lists. Monitor the startup, testing, commissioning and handover of the works.
Perform similar other related duties as and when assigned by the project manager.
QUALIFICATIONS
BACHELERS IN MECHANICAL ENGINEERING
ASNT LEVEL-II IN RADIOGRAPHIC TESTING
ASNT LEVEL-II IN MAGNETIC PARTICLE TESTING
ASNT LEVEL-II IN ULTRASONIC TESTING
ASNT LEVEL-II IN PENNETRANT TESTING
GENERAL INFORMATIONS
Total years of experience: 8 years
Age: 29
Marital status: Married
Personal profile
Father’s name: Mr.C.N. Divakaran
Date of Birth: 16 NOVEMBER 1985
Nationality: Indian
Religion: Hindu
PASSPORT NO:G9659864
ISSUE DATE:06/08/2008
EXPIRY DATE: 05/08/2018
Languages known: English, Hindi,, Malayalam, Tamil.
Declaration
I hereby declare that the above furnished details
Are true to the best of my knowledge and belief.
Yours sincerely
(DINISH.D)
Place:
Date: