Post Job Free
Sign in

Electrical Maintenance

Location:
Mumbai, MH, India
Posted:
August 30, 2016

Contact this candidate

Resume:

SUMIT TIWARI

B-**/*, Best Rajdoot CHS,

Pantnagar, Ghatkopar (East)

Mumbai 400-075

Mobile: +91-976*******

Email: *****.********@*****.***/ *****.*********@*****.***.

PROFILE SUMMARY

Offering over 4 years of experience as EXECUTIVE ELECTRICAL ENGINEER / MAINTENANCE & PROJECT JR. ENGINEER

Possess extensive knowledge in evaluating Electrical and HVAC systems, products, components, and applications by designing and conducting research programs; applying knowledge of electricity and materials

Experience in confirming system's and components' capabilities by designing testing methods; testing Electrical system.

Experience in developing electrical products by studying customer requirements; researching and testing manufacturing and assembly methods and materials

Develops manufacturing processes by designing and modifying equipment for building and assembling electrical components; soliciting observations from operators.

Assures product quality by designing electrical testing methods; testing finished products and system capabilities.

Prepares product reports by collecting, analyzing, and summarizing information and trends

Possess motivational management style with a record of being able to deliver positive results independently & under pressure

CAREER OBJECTIVE:

I am looking ahead to work in a professional, growth oriented organization, where in one can make significant contribution to the success of the organization. Seeking a position that involves creativity, challenges and that provides me, an opportunity to constantly strive to explore, innovate & excel in attaining organizational and my individual goals. A consistently dependable team player, I can thrive in a high-pressure environment, enjoy the challenges of meeting deadlines and lead a team successfully.

STRENGTH & SKILLS:

Good analytical, interpersonal, communication & listening skills coupled with dedication and sincerity towards the assigned job.

EDUCATION BACKGROUND:

Course / Degree

Institute / Board

Year of Passing

Grade

B.E (Electrical Engineering)

Lokmanya Tilak College of Engineering, Mumbai University

2012

I

H.S.C

R.J College, Ghatkopar,Mumbai

2007

II

S.S.C

HHS, Ghatkopar, Mumbai

2005

I

EXTRA QUALIFICATIONS

* Completed successfully MS Office – Basic Computer Course (MS Word, MS Excel, MS Power Point & Internet)

* Full Knowledge of Windows XP, Vista, 07, 08, 03 & UNIX

* Knowledge of Java, C++, Auto Cad, Matlab & Simulink.

EXPERIENCE

Working as “Facility Executive Engineer” at CBRE South Asia Pvt. Ltd. from April 2014 till date.

Key Responsibilities

*Handling 22 KV substation in which included Lighting Arrestor, RMU changeover unit, Isolator switch,HT breaker SF6 & VCB, Transformer Indotech & Kirloskar make

* Having Transformer 2MVA, 1500KVAX1 no. and 2600 KVA Maximum Demand.

* Electrical load estimation, maximum demand, Power factor calculation and controlling.

*Preparing daily report, weekly, Monthly and yearly power report included raw power, D.G running hours and send to top management.

*Done Project on street light installation work in which we replace 150W MHL to 60 watt LED light and we also astro clock timer to operate light in Auto mode i.e. On/Off .

*Done Project commissioning of PLC system to control operation of multiple of on/off with help of VFD for pump system like start, stop time and day pressure, flow meter.

* Done Automation work to start/stop done through BMS system.

*Done project on 10 no’s of chemical ear thing installation in plant.

* Looking after all maintenance and troubleshooting activities of Distribution Transformer (22KV/415 V ) for 2 MVA,

1500 KVA Oil type ),HT & LT Breaker, APFC panels, PCC, MCC, PDB, MCC, MLDB panel etc.

* Maintenance of transformer in monthly, Quarterly, Half yearly &yearly.

* Knowledge of protection system transformer according voltage ratio &capacity both HV and LV side also common

type of relays like 33/11 KV substation.

* Coordination with consultant for the tendering and finalization of the contract for Electrical system.

* Knowledge of Ring/Radial electrical distribution system.

* Calculate loads for sizing the electrical equipment in plant.

* Plans& coordination operation of facilities transmitting power from distribution point to consumer.

* Make electrical computation to determine type & arrangement of circuit & seize, type & no. of piece equipment such

as circuit breaker & their rating.

* Develop plans, specification & cost estimates for the installation, maintenance, repair & expansion of electrical

distribution system.

* Inspect the installation of electrical installation of electric equipment & related facilities.

* Monitor the electrical system performance.

* Planning PPM schedule all electrical system included Weekly, Monthly, Quarterly, Half Yearly & Yearly.

* Prepare studies, report & recommendation pertaining to the overall electrical system operation.

* Manage the maintenance & improvement of the distribution system & substation.

* Respond the emergency condition & restoring the electrical distribution system to the normal operation.

* Build up new SLD line diagrams for electrical distribution system.

* Execution of the project engineering involving Installation, commissioning & testing of electrical equipment such as

HT switchgear consist of VCB,SF6 Breaker, HT/LT motor cable(22 KV,6.6KV).

* Looking after all maintenance of 40X3 KVA, 60KVA, 30X2 KVA, 120 KVA Emerson & Delta UPS, and danfoss make

VFD.

* Protection system include Microprocessor & Numerical relay also D.G set with AMF panel.

* Daily Power monitoring, Calculation & reporting at monthly basi

* Testing carried out every year all electrical system (Earthling pit, ACB breaker, SF6 Breaker, transformer oil).

* After testing earthing resistance take necessary action to rectify the problem.

* Electrical maintenance of compressor in which included slip ring & also induction motor 200 KW motor in which

having oil immersed starter as well as Star-Delta starter, water & oil pressure switch setting.

* Maintenance of LT breaker and troubleshooting Of DG set Powerica (1050KVAx1 no. & 500 KVA).

* Knowledge and operation of AC Drive DANFOSS, ABB make.

* HVAC System (Chiller, AHU, VA V) & Having York make 2 no. of chiller (200X2 no of TR) and another kirloskar make

Chiller is 600TR also 26 no. of AHU.

* Both high side & low side included chiller, Cooling tower, AHU. VFD, Chemical dosing in cooling tower to maintain PH

valve.

Worked as “Maintenance & Project Jr. Engineer” at Supermax Personal Care Pvt. Ltd. from August 2012 to March 2014

PROJECT HANDLED

Installed 600TR kirloskar make chiller (Primary pump, condenser pump also 720 TR cooling tower, 13000 CFM AHU).

Project on 1500 KVA AVR installation work to control the voltage of the system.

Done Project on installation of 16 no. of lubra m/c from cable installation to m/c panel installation In Supermax Personal care Pvt. ltd about 195 KW load in which laying of cable 3.5 CX150 Sq. mm AL cable in which included lugging & Crimping also installed SFU unit for distribution purpose.

Install on HT Breaker under /over voltage & also under/Over frequency installation work in HT Breaker Schneider make P995 MICOM relay.

Install Astro clock timer for street light to operate i.e. On/Off in auto mode.

Key Responsibilities

*Handling 11 KV substation in which included Lighting Arrestor, RMU changeover unit, Isolator switch,HT breaker SF6 & VCB, Transformer C.G make.

* Having Transformer 2MVA, 1500KVAX2 no., 750KVA, 500KVA and 5200 KVA Maximum Demand.

* Testing carried out every year all electrical system (Earthling pit, ACB breaker, SF6 Breaker, transformer oil).

* Knowledge OF transformer RTCC setting for desire Voltage in OLTC Transformer.

* Maintenance and troubleshooting Of compressor, DG set Caterpillar and Powerica (1250KVAx2 no.& 500 KVA)&

* Attending breakdown and maintenance of CRM, In which having DC motor& AC motor as well as drive.

* DC motor in CRM 336X1KW, 164X4 KW, 48.5X4 KW, 15KW & AC motor 15X4 KW, 20X2KW, 7.5X7KW, 2.2X11KW,

1.5X6KW, 1.1X4KW.

* Maintenance & Troubleshooting of Induction furnace.

* Planning and effecting preventive & predictive maintenance, overhauling, repair schedule of various machine and

instrument to increase machine up time and long term equipment reliability.

* Proactive identifying areas of obstruction, break downs and taking corrective steps to rectify the equipment’s

through application of troubleshooting tools.

* Under take periodic checking and maintenance of electrical machines Carryout, panels.

* Attend breakdowns in plant &Identifying problems of equipment that may cause interruption in smooth running of

plant.

* Conduct preventive maintenance as per planning.

* Carryout modification to minimized downtime &increase efficiency of system.

* Prepare daily report, remark and equipment history.

* Dealing with integrated material management system.

* Manpower planning and control.

* Regular updating of stocks of spare material of electrical maintenance.

* Preparation of indent for new electrical equipment and monthly electrical expenditure.

* Material procurement through SAP and maintaining minimum spares for attending breakdown and reducing

breakdown time.

* Coordination with various departments for smooth functioning of the equipment by feedback and suggestion from

them.

* Maintenance of induction Furnace, Grinding m/c, wrapping m/c, CRM.

*Preparing pending work list and complete that work at given time.

*Troubleshooting and maintenance of machine which are used in production system.

*Maintenance of different type of motor like Induction motor, D.C motor, slip ring motor, Gear motor to bearing changing greasing,WR,IR checking.

*Maintenance and operation of different type of starter like DOL, Star-Delta, Oil immersed starter.

*Operation and maintenance of ACB like servicing, spring testing, shunt voltage and under voltage etc checking.

DRAWING STUDY

•Preparation of SLDs.

•Knowledge of selecting &sizing of electrical equipment’s.

•Done electrical AutoCAD 2010 course from cad center Mumbai.

•Having experience in Induction furnaces breakdown & its operation.

•Knowledge of control diagram, Starter size and relay size calculation for motor and breaker.

•Knowledge of illumines system and earthing system.

•Electrical load estimation, maximum demand, Power factor calculation.

COMPETENCIES

Quick learner & adapts well to changes and pressure in work place

Managing relationships & working efficiently with diverse groups of people

Committed to meeting deadlines and schedules

Leadership skills to lead projects & handle work independently

LANGUAGES KNOWN

English, Hindi, Marathi (Speak, Read, Write)

HOBBIES

Reading Books & Listening Music

DATE OF BIRTH

13th May 1989

REFERENCE

Available on request

DECLARATION

I hereby declare that the details furnished above are true to the best of my knowledge.

Mumbai



Contact this candidate